Date |
Text |
2015-08-14 11:07:35 | 1ST REVIEW: FBC 2014 5TH ED. |
| |
| THE CODE IN EFFECT CITED IS OUTDATED. THIS APPEARS TO |
| BE A LEVEL I ALTERATION OF A SFD PER THE FBC EXISTING |
| BUILDING CODE 5TH EDITION. |
| |
| FBC 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| CONSTRUCTION DOCUMENTS SHALL BE DIMENSIONED AND DRAWN |
| UPON SUITABLE MATERIAL. ELECTRONIC MEDIA DOCUMENTS |
| SHALL BE SUBMITTED WHEN APPROVED BY THE BUILDING |
| OFFICIAL. CONSTRUCTION DOCUMENTS SHALL BE OF SUFFICIENT |
| CLARITY TO INDICATE THE LOCATION, NATURE AND EXTENT OF |
| THE WORK PROPOSED AND SHOW IN DETAIL THAT IT WILL |
| CONFORM TO THE PROVISIONS OF THIS CODE AND RELEVANT |
| LAWS, ORDINANCES, RULES AND REGULATIONS, AS DETERMINED |
| BY THE BUILDING OFFICIAL. SUCH DRAWINGS AND |
| SPECIFICATIONS SHALL CONTAIN INFORMATION, IN THE FORM |
| OF NOTES OR OTHERWISE, AS TO THE QUALITY OF MATERIALS, |
| WHERE QUALITY IS ESSENTIAL TO CONFORMITY WITH THE |
| TECHNICAL CODES. SUCH INFORMATION SHALL BE SPECIFIC, |
| AND THE TECHNICAL CODES SHALL NOT BE CITED AS A WHOLE |
| OR IN PART, NOR SHALL THE TERM "LEGAL" OR ITS |
| EQUIVALENT BE USED AS A SUBSTITUTE FOR SPECIFIC |
| INFORMATION. |
| |
| THERE IS A LACK OF DETAIL AND SCOPE OF WORK INDICATED |
| AND ONLY GENERAL PARAMETERS GIVEN. PROVIDE ADDITIONAL |
| DETAIL TO DEMONSTARTE THE FOLLOWING: |
| |
| INTERIOR WALL TYPICAL DETAIL, FURRING AND DRYWALL |
| DETAIL, SPECIFY ROOF JOIST THAT MAY BE REPLACED, |
| SPECIFY IF NEW OPENING IN WALL REQUIRES STRUCTURAL |
| SUPPORT TO THE ROOF MEMBERS. |
| |
| PLEASE NOTE A COMPLETE REVIEW CANNOT BE PERFORMED DUE |
| TO THE LACK OF INFORMATION PROVIDED. |
| |
| ADDITIONALLY, THE SCOPE OF WORK IN DICATES WORK THAT |
| MAY EXCEED THE THE CLAIMED VALUE OF $7,000.00. PER FBC |
| 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING |
| PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE |
| TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY |
| LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST |
| PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS |
| SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| |
| PROVIDE A COPY OF YOUR CONTRACT TO DETERMINE THE SCOPE |
| OF WORK AND VALUE OF THE JOB. |
| |
| STEVEN KENNEDY, CBO |
| CHIEF PLANS EXAMINER |
| (561) 805-6710 |
| [email protected] |
| |