2015-08-14 14:39:32 | 1ST REVIEW: FBC 2014 MECHANICAL |
| PERMIT #15080378 |
| 8/14/15 |
| |
| 1) REFERENCE SECTION C403.2.1 FBC-14 ENERGY |
| CONSERVATION, AND PROVIDE HEAT LOAD CALCULATIONS FOR |
| THE NEW MITSUBISHI MINI-SPLIT AC SYSTEM |
| C403.2.1 CALCULATION OF HEATING AND COOLING LOADS. |
| DESIGN LOADS SHALL BE DETERMINED IN ACCORDANCE WITH THE |
| PROCEDURES DESCRIBED IN THE ASHRAE/ACCA STANDARD 183 OR |
| ACCA MANUAL N AND SHALL BE ATTACHED TO THE CODE |
| COMPLIANCE FORM SUBMITTED TO THE BUILDING DEPARTMENT |
| WHEN THE BUILDING IS PERMITTED OR, IN THE EVENT THE |
| MECHANICAL PERMIT IS OBTAINED AT A LATER TIME, THE |
| SIZING CALCULATION SHALL BE SUBMITTED WITH THE |
| APPLICATION FOR THE MECHANICAL PERMIT. HEATING AND |
| COOLING LOADS SHALL BE ADJUSTED TO ACCOUNT FOR LOAD |
| REDUCTIONS THAT ARE ACHIEVED WHEN ENERGY RECOVERY |
| SYSTEMS ARE UTILIZED IN THE HVAC SYSTEM IN ACCORDANCE |
| WITH THE ASHRAE HVAC SYSTEMS AND EQUIPMENT HANDBOOK. |
| ALTERNATIVELY, DESIGN LOADS SHALL BE DETERMINED BY AN |
| APPROVED EQUIVALENT COMPUTATION PROCEDURE, USING THE |
| DESIGN PARAMETERS SPECIFIED IN CHAPTER 3. |
| 2) SHEET M0.1: CORRECT THE HVAC DESIGN CONDITIONS IN |
| ACCORDANCE WITH ACCA MANUAL N, TABLE 1A: OUTDOOR- 90 |
| DB, 78 WB. |
| 3) M1.1: REFERENCE SECTION 301.15 FBC-14 MECHANICAL AND |
| PROVIDE THE DESIGN WIND PRESSURES FOR THE ROOF TOP |
| MIAMI TECH CU AND CU BRACKET INSTALLATION. SUBMIT TWO |
| COPIES OF A CURRENT FLORIDA PRODUCT APPROVAL FOR THE |
| BRACKET REVIEWED AND APPROVED BY THE ENGINEER OF |
| RECORD. THE ENGINEER SHALL CIRCLE, HIGHLIGHT, OR |
| OTHERWISE MARK ALL DETAILS, NOTES, ANCHOR AND FASTENER |
| SCHEDULES APPLICABLE TO THE PROPOSED INSTALLATION. |
| 4) M4.1, VENTILATION CALCULATIONS: UPDATE THE ASHRAE |
| 62.1 REFERENCE TO 2010. REFER TO SECTION 809.2 FBC-14 |
| EXISITING BUILDING CODE AND SHOW COMPLIANCE- ALTERED |
| EXISTING SYSTEMS. |
| IN MECHANICALLY VENTILATED SPACES, EXISTING MECHANICAL |
| VENTILATION SYSTEMS THAT ARE ALTERED, RECONFIGURED, OR |
| EXTENDED SHALL PROVIDE NOT LESS THAN 5 CUBIC FEET PER |
| MINUTE (CFM) (0.0024 M3/S) PER PERSON OF OUTDOOR AIR |
| AND NOT LESS THAN 15 CFM (0.0071 M3/S) OF VENTILATION |
| AIR PER PERSON; OR NOT LESS THAN THE AMOUNT OF |
| VENTILATION AIR DETERMINED BY THE INDOOR AIR QUALITY |
| PROCEDURE OF ASHRAE 62. |
| 5) COMMISSSIONING OF THE BUILDING MECHANICAL AND |
| ELECTRICAL POWER AND LIGHT SYSTEMS ARE REQUIRED IN |
| ACCORDANCE WITH SECTION C408 FBC-14 ENERGY COMPLIANCE. |
| PLEASE PROVIDE A NARRATIVE ON THE PLAN DESCRIBING THE |
| PROPOSED COMMISSIONING PROCEDURE AS OUTLINED IN SECTION |
| C408. |
| |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 561-805-6719 |
| [email protected] |
| |
| |