2015-10-29 09:22:34 | 1) SUBMIT CALCULATIONS FOR COMBUSTION AIR. 2ND REQUEST. |
| 2014 FBC-RES. SEC. G2407. |
| 2) THE TOTAL BTU LOAD I HAVE CALCULATED FOR THIS SYSTEM |
| BASED ON THE BTU LOAD SHOWN IS 1,103,000 BTU'S. REVISE |
| TOTAL BTU LOAD ON THE PLAN. |
| 3) BASED ON THE TOTAL BTU LOAD OF THE LOW PRESSURE |
| SYSTEM AND THE DISTANCE TO THE MOST REMOTE OUTLET (114 |
| FT. ) THE GALVANIZED LINE FROM THE REGULATOR SHALL BE A |
| MINIMUM OF 2 INCHES IN SIZE UP TO THE FIRST TRANSITION |
| TO CSST PER TABLE G2413.4 (1) OF 2014 FBC-RES. |
| 4) THE 10 FOOT SECTION OF CSST SHALL BE 2", NOT 1 1/4" |
| AS SHOWN PER TABLE G 2413.4 (5) OF 2014 FBC-RES. |
| 5) THE 60 FOOT SECTION OF CSST SHALL BE 2", NOT 1 1/4 " |
| PER 2014 FBC-RES. GAS TABLE G 2413.4 (5) OF 2014 |
| FBC-RES. |
| 6) THE SIZE OF THE CSST TO THE TANKLESS WATER HEATER IN |
| THE MASTER BATH SHALL BE 1 1/4" PER 2014 FBC-RES. TABLE |
| G2413.4 (5) AND THE GALVANIZED SHALL BE 1 1/4" PER |
| TABLE G2413.4 (1). |
| 7) THE SIZE OF THE GALVANIZED LINE TO THE POOL HEATER |
| SHALL BE 1 1/2" PER 2014 FBC-RES.TABLE G2413.4 (1) AND |
| THE CSST SHALL BE 2" PER TABLE G2413.4 (5). |
| 8) SUBMIT TWO COPIES OF OF MANUFACTURER'S |
| SPECIFICATIONS FOR ALL GAS APPLIANCES. THE ONLY SPECS |
| SUBMITTED WERE FOR THE FIREPLACE. APPLIANCES SHALL BE |
| LISTED AND LABELED PER 2014 FBC-RES. SEC. G2404.3. |
| 9) SHOW THE CORRELATING EHD OF THE CSST TO ENSURE |
| CORRECT SIZING. |
| |
| I SUGGEST YOU CALL TO MAKE AN APPOINTMENT TO GO OVER |
| THE GAS DRAWING. |
| |
| PLUMBING PLAN REVIEW |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| 561-805-6692 |
| [email protected] |
| |
| |
| |