2015-07-31 09:39:26 | ****CORRECTIONS**** |
| |
| SAMANTHA HILL |
| BUILDING PLANS EXAMINER |
| [email protected] |
| 561-805-6724 |
| |
| 1. PROVIDE PLANS FOR PROPOSED WORK. A NON IMPACT |
| PRODUCT APPROVAL FOR A SINGLE HUNG WINDOW WAS PROVIDED. |
| SEE FBC 107, ARCHITECTURAL QUALITY PLANS, TO SCALE, |
| WHICH SHOW THE LOCATION AND NATURE OF PROPOSED WORK IS |
| REQUIRED. |
| |
| A REVIEW CANNOT BE DONE AT THIS TIME DUE TO THE LACK OF |
| INFORMATION PROVIDED. |
| |
| 2. A STOP WORK ORDER VIOLATION HAS BEEN ISSUED FOR THIS |
| PROPERTY. APPLICATION SHOULD ADDRESS THE VIOLATION, |
| WHICH WAS FOR AN ADDITION INCLUDING WINDOWS. |
| |
| 3. CONTRACTOR WAS UNDER AN AGREEMENT A YEAR AGO TO |
| RESOLVE FIVE EXPIRED PERMITS A MONTH. RATHER THAN |
| ADDRESSING FIVE A MONTH, SEVERAL MORE PERMITS ARE NOW |
| IN EXPIRED STATUS. BASED ON THE CONTRACTOR'S AGREEMENT, |
| ALL EXPIRED PERMITS SHOULD BE RESOLVED AT THIS TIME. |
| THIS IS NOT THE CASE. |
| |
| LICENSE U-17813 HAS 38 EXPIRED PERMITS, 5 REVOKED |
| (RESOLVED EXPIRED PERMITS) |
| |
| LICENSE U-20912 HAS 18 EXPIRED PERMITS (THREE HAVE |
| EXPIRED SINCE CONTRACTOR'S AGREEMENT TO RESOLVE OLD |
| EXPIRED PERMITS0, 7 REVOKED. |
| |
| CONTRACTOR HAS 56 EXPIRED PERMITS. FAILURE TO RESOLVE |
| THESE PERMITS WILL RESULT IN A COMPLAINT BEING FILED |
| AGAINST CONTRACTOR. DUE TO THE FAILURE TO FOLLOW |
| THROUGH ON THE AGREEMENT, AND THE ISSUE OF ADDITIONAL |
| PERMITS EXPIRING DURING AFTER CONTRACTOR AGREED TO |
| RESOLVE EXPIRED PERMITS, CONTRACTOR IS TO RESOLVE AT |
| LEAST HALF OF THE EXPIRED PERMITS WITHIN 30 DAYS, AND |
| SUBSTANTIALLY ALL OF THE PERMITS WITHIN 60 DAYS. |
| |
| ISSUANCE OF THIS PERMIT (15070876) IS UNRELATED TO |
| COMMENT #3. THIS PERMIT CAN BE ISSUED TO THIS |
| CONTRACTOR AFTER COMMENTS ARE ADDRESSED. FAILURE TO |
| RESOLVE EXPIRED PERMITS WILL RESULT IN A COMPLAINT |
| AGAINST CONTRACTOR, EVEN IF THIS PERMIT IS ISSUED TO A |
| DIFFERENT CONTRACTOR. |
| |