2015-09-01 14:33:25 | 2ND REVIEW: FBC 2010 MECHANICAL |
| PERMIT #15061462 |
| 9/1/15 |
| |
| 1) THE SUBMITED AMEREX FIRE SUPPRESSION SYSTEM PLAN HAS |
| A STUART FL. PROJECT ADDRESS AND THE BOOTH DIMENSIONS |
| DO NOT MATCH THE BOOTH DIMENSIONS SHOWN ON THE MAIN |
| SPRAY BOOTH PLAN- PLEASE PROVIDE THE CORRECT |
| SUPPRESSION PLAN. |
| 2) THE SUBMITTED MANUAL FOR THE GFS SPRAY BOOTH HAS CUT |
| SHEETS AT THE BACK FN THE DOCUMENT (PAGES 1-6) WITH |
| PRINT TOO SMALL TO READ. PLEASE ENLARGE THESE PAGES. |
| 3) THE MODEL NUMBER AND SPECIFICATIONS FOR THE SPRAY |
| BOOTH FAN THAT ARE MARKED UP ON THE SUBMITTAL |
| (GFA-30VP-030) DO NOT MATCH THE MODEL NUMBER AND SPECS |
| LISTED IN THE EQUIPMENT SCHEDULE (30VP-050T3T) SHEET |
| B2. |
| 4) AS PREVIOUSLY REQUESTED IN THE1ST REVIEW, SUBMIT |
| SPECS FOR THE MIXING BOOTH FAN. |
| 5) AS PREVIOUSLY REQUESTED PROVIDE AIR VELOCITY |
| CALCULATIONS (ON THE PLAN) FOR THE SPRAY BOOTH. |
| 6) AS PREVIOUSLY REQUESTED PROVIDE A ROOF PLAN |
| INDICATING THE REQUIRED MINIMUM CLEARANCE DISTANCES FOR |
| EXHAUST TERMINATIONS TO PROPERTY LINES, AIR INTAKES, |
| COMBUSTIBLE CONSTRUCTION, EXTERIOR WALLS, AND OPERABLE |
| OPENINGS. |
| 7) THE COMMENT RESPONSE LETTER FROM FL. FILTRATION & |
| SPRAY BOOTH SERVICES INDICATES ALUMINUM COMPRESSED AIR |
| PIPING, HOWEVER THE PLAN INDICATES STEEL. PLEASE |
| CORREECT THE PLAN AND PROVIDE A HANGER SCHEDULE. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 561-805-6719 |
| [email protected] |
| |