Date |
Text |
2015-07-10 15:46:44 | 1ST REVIEW: FBC 2010 MECHANICAL, FBC-10 EXISTING |
| BUILDING CODE |
| PERMIT #15061362 |
| 7/10/15 |
| |
| 1) PROVIDE MINIMUM VENTILATION CALCULATIONS FOR THE |
| RE-CONFIGURED TENANT SPACES IN COMPLIANCE WITH SECTION |
| 709.1 FBC-10 EXISTING BUILDING CODE, AND TABLE 403.3 |
| FBC-10 MECHANICAL. PROVIDE A TABLE ON THE PLAN |
| INDICATING THE REQUIRED AND PROVIDED CFM'S OF OUTDOOR |
| AIR. |
| 2) PROVIDE COOLING AND HEATING LOAD CALCULATIONS FOR |
| THE NEW HEAT PUMP SYSTEMS IN ACCORDANCE WITH ACCA |
| MANUAL N OR THE ACCA/ASHRAE STANDARD 183- SECTION |
| 503.2.1 1 FBC-10 ENERGY CONSERVATION. |
| 3) SHEET M2.1: REFERENCE NOTE NUMBER SYMBOLS 4, 5, & 6 |
| ARE NOT SHOWN ON THE PLANS. IT APPEARS NOTE # 5 MAY NOT |
| BE APPLICABLE TO THE PROJECT. |
| 4) M2.1: NOTE #2 INDICATES DISCHARGING THE THE FAN COIL |
| UNIT CONDENSATE INTO PLUMBING DRAINS. PLEASE NOTE THAT |
| UNCONTAMINATED COOLING WATER IS NOT PERMITTED TO DRAIN |
| INTO THE CITY SANITARY SEWER PER SEC. 90-203 WPB CODE |
| OF ORDINANCES. PROVISE AN APPROVED ALTERNATE LOCATION. |
| 5) M3.2: REMOVE THE RTU CURB DETAIL- IT IS NOT |
| APPLICABLE TO THIS PROJECT. IN IT'S PLACE PLEASE |
| PROVIDE ENGINEERED STRUCTURAL AND WIND LOAD TIE DOWN |
| DETAILS FOR ANCHORING THE CONDENSER ROOF STANDS AND |
| MOUNTING THE CONDENSERS TO THE STANDS- SECTION 301.12 |
| FBC-10 MECHANICAL. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 561-805-6719 |
| [email protected] |
| |