Plan Review Notes
Plan Review Notes For Permit 15061278
Permit Number 15061278
Review Stop M
Sequence Number 1
Notes
Date Text
2015-07-14 14:33:521ST REVIEW: FBC 2010 MECHANICAL
 PERMIT #15061278
 7/14/15
  
 1) PROVIDE COOLING AND HEATING LOAD CALCULATIONS FOR
 THE NEW AHU/CU 11-20 SYSTEM IN ACCORDANCE WITH ACCA
 MANUAL N OR THE ACCA/ASHRAE STANDARD 183- REFERENCE
 SECTION 503.2.1 FBC-10 ENERGY CONSERVATION.
 2) IN ACCORDANCE WITH SECTION 709.1 FBC-10 EXISTING
 BUILDING, PROVIDE MINIMUM VENTILATION CALCULATIONS FOR
 THE RECONGFIGURED ROOMS AND SPACES ON THE 11TH AND 12TH
 FLOORS- REFERENCE TABLE 403.3 FBC-10 MECHANICAL.
 PROVIDE A SCHEDULE ON THE PLAN INDICATING THE MINIMUM
 REQUIRED CFM'S OF O/A OR EXHAUST, AND THE CFM'S
 PROVIDED. REFERENCE SECTIONS 503.4.5.1 AND 503.4.5.2
 FBC-10 ENERGY CONSERVATION, AND ADD NOTES ON SHEET M6.1
 TO INDICATE VAV TERMINAL DEVICE COMPLIANCES REGARDING
 O/A.
 3) NEW FIRE DAMPERS ARE SHOWN ON THE PLANS: PROVIDE AN
 EQUIPMENT SCHEDULE ON THE PLAN LISTING THE MAKES AND
 MODELS, FIRE-RESISTANCE RATINGS, AND HOW THEY WILL BE
 ACTUATED- PROVIDE A SEQUENCE OF OPERATION, AND CLARIFY
 IF ANY OTHER ALTERATIONS TO THE SMOKE CONTROL SYSTEM
 ARE PROPOSED.
 4) THE 12TH FLOOR PLAN LAYOUT ON THE ARCHITECTURAL
 DEMOLITION SHEET (A1.02) DOES NOT MATCH THE LAYOUT
 SHOWN ON THE MECHANICAL DEMO SHEET (M2.0).
 5) SHEET M2.02: EXHAUST VENTILATION FOR THE TOILET
 ROOMS IS REQUIRED. PLEASE PROVIDE THE DETAILS, EXHAUST
 DUCT RUNS, AND EXHAUST FAN SCHEDULES ON THE PLANS-
 TABLE 403.3 FBC-10 MECHANICAL.
 6) M2.04: EXHAUST VENTILATION FOR THE LOCKER/TOILET
 ROOMS IS REQUIRED. PROVIDE THE DETAILS, DUCT RUNS, AND
 FAN SCHEDULES ON THE PLAN.
 7) M2.02 & M2.04 PROVIDE MAKE-UP AIR FOR THE DRYERS-
 REFERENCE SECTION 504.5 FBC-10 MECHANICAL. NOTE THERE
 IS A DUCT DROP SHOWN AT THE FRONT OF THE 12TH FLOOR
 DRYER CLOSET, HOWEVER DOOR 1117 ENCLOSING THE CLOSET IS
 NOT LISTED AS A LOUVERED DOOR ON THE SCHEDULE ON SHEET
 A6.01. PROVIDE THE TOTAL LENGTHS OF THE DRYER EXHAUST
 DUCT RUNS IN COMPLIANCE WITH SECTION 504.6.4, AND
 SUBMIT PRODUCT DATA CUTSHEETS FOR THE APPLIANCES.
 8) M5.02: THE DESIGN PROFESSIONAL OF RECORD SHALL
 CERTIFY THAT THE CU WILL BE INSTALLED TO WITHSTAND 170
 MPH WIND LOADS AND PRESSURES- REFERENCE 301.12 FBC-10
 MECHANICAL. PROVIDE NOTES ON THE PLAN INDICATING
 COMPLIANCE.
  