Date |
Text |
2015-06-25 05:55:08 | 1)THE GAS PLAN IS UNACCEPTABLE. THERE ARE TOO MANY |
| DEFICIENCIES TO LIST. COMPLY WITH ALL THE APPLICABLE |
| REQUIREMENTS OF THE REQUIREMENTS FOR GAS PERMIT FORM |
| THAT I HAVE ATTACHED TO THE PLANS. WPB AMEND. TO 2010 |
| FBC SEC. 107.2.1. |
| 2) THE CONTRACTOR IS LICENSED AS A CLASS "A" MECHANICAL |
| CONTRACTOR. FLA. STATUTES 489.105 ( F ) DOES NOT ALLOW |
| A CLASS "A" MECHANICAL CONTRACTOR TO RUN ANY GAS PIPE. |
| A CLASS "A" CONTRACTOR MAY ONLY DISCONNECT AND |
| RECONNECT CHANGEOUTS OF LP OR NATURAL GAS APPLIANCES. |
| THIS PERMIT WILL NOT BE ISSUED TO THIS MECHANICAL |
| CONTRACTOR. |
| 3) GAS PERMIT APPLICATION REQUIREMENTS |
| |
| EFFECTIVE IMMEDIATELY THE FOLLOWING INFORMATION SHALL |
| BE SHOWN ON ALL GAS DRAWINGS SUBMITTED FOR PERMITTING |
| IN THE CITY OF WEST PALM BEACH: |
| |
| 1. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS ALL |
| CUT SECTIONS OF PIPE AND CORRESPONDING LENGTHS PER |
| FBC-2010 FUEL GAS, SECS. 402.4.1, 402.4.2. |
| |
| 2. SHOW TYPE OF PIPING MATERIAL BEING INSTALLED, ALL |
| PIPE SIZES, AND THE EHD NUMBER OF CORRUGATED STAINLESS |
| STEEL TUBING FOR EACH PIPE SIZE IF BEING USED. |
| |
| 3. TYPE OF GAS, (LP OR NATURAL). |
| |
| 4. BTU LOAD OF EACH APPLIANCE AND THE TOTAL BTU LOAD ON |
| THE SYSTEM. REFER TO THE FBC-2010 FUEL GAS SECS. 401.8 |
| THRU 402.6.1 AND TABLES 402.4(1) THRU 402.4(35) |
| |
| 5. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, |
| (METER), TO THE MOST REMOTE OUTLET IN THE BUILDING |
| AND/OR SYSTEM PER THE FBC-2010 FUEL GAS APPENDIX A ? |
| USE OF CAPACITY SECTION A.3.1(4) & 2010 FUEL GAS CODE |
| SEC. 402.4.1. |
| |
| 6. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE |
| FBC-2010 FUEL GAS CODE SEC. 304 |
| |
| 7. INDICATE THE DELIVERY PRESSURE (PSI) PER FBC-2010 |
| FUEL GAS SEC. 402.2. IF NATURAL GAS SPECIFY .5 PSI OR 2 |
| PSI. |
| |
| 8. SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE AND |
| TERMINATION OF THE GAS VENTS PER FBC-2010 FUEL GAS CODE |
| SEC. 502 THRU 505. |
| |
| 9. SUBMIT MANUFACTURER?S SPECIFICATION SHEETS FOR ALL |
| GAS EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA |
| 54, NFPA 58, AND FBC-2010 FUEL GAS SEC. 402.2 |
| |
| ANY QUESTIONS REGARDING THESE REQUIREMENTS MAY BE |
| REFERRED TO: |
| |
| CHIEF PLUMBING INSPECTOR (561) 805-6692 |
| |
| |
| PLUMBING PLAN REVIEW |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| 561-805-6692 |
| [email protected] |
| |