Plan Review Notes For Permit 15060987 |
Permit Number |
15060987 |
|
Review Stop |
B |
Sequence Number |
2 |
|
Notes |
Date |
Text |
2015-08-04 16:55:22 | 1) DEMOLITION APPLICATION CAN NOT ISSUED WITHOUT | | ELECTRICAL DISCONNECT. COMMENT RESPONSE FROM CONTRACTOR | | STATES POWER WILL BE REMOVED BACK TO TRANSFORMER. AN | | ELECTRICAL PERMIT WILL BE NEEDED FOR THAT DISCONNECT | | VERIFICATION. | | | | 2) F.P.U. MAY NOT HAVE SERVICE TO SITE, BUT | | CONFIRMATION FROM F.P.U. IS STILL REQUIRED FOR DEMO | | PERMIT ISSUANCE. | | | | 3) WATER SHOULD BE DISONNECTED BACK TO BACK FLOW | | PREVENTER IF WATER WILL BE KEPT ON SITE. IT SHOULD BE | | CAPPED AS NEAR TO THE PROPERTY LINE AS POSSIBLE. THE | | WATER DEPARTMENT WILL LOCATE AND MARK THE LATERAL IN | | GREEN PAINT WHEN THEY RECEIVE THE REQUEST. THE TURN A | | ROUND PLUMBING PERMIT CAN COMBINE LATERAL CAP | | AND BACK FLOW PREVENTER. THE SEWER LATERAL WILL NEED TO | | BE CAPPED AND INSPECTED PRIOR TO DEMOLITION PERMIT | | BEING ISSUED. | | | | FEEL FREE TO CALL WITH ANY QUESTIONS. TOM M. 2 805-6669 |
|