Plan Review Notes For Permit 15060612 |
Permit Number |
15060612 |
|
Review Stop |
M |
Sequence Number |
2 |
|
Notes |
Date |
Text |
2015-08-21 12:13:25 | 2ND REVIEW: FBC 2010 MECHANICAL | | PERMIT #15060612 | | 8/21/15 | | | | 1) AC SYSTEM SIZING CALCULATIONS ARE REQUIRED IN | | ACCORDANCE WITH SECTION 503.2.1 FBC-10 ENERGY | | CONSERVATION. HOW WAS AC-2 SIZED? WAS A CALCULATION RUN | | ON THE BUILDING, AND WAS AC-1 TAKEN INTO ACCOUNT? | | PLEASE SUBMIT TWO COPIES OF COOLING AND HEATING LOADS | | DETERMINED IN ACCORDANCE WITH THE ASHRAE/ACCA STANDARD | | 183 OR ACCA MANUAL N. | | 2) REFER TO TABLE 101.4.1 FBC-10 ENERGY CONSERVATION: | | THE PROPOSED CHANGE OF OCCUPANCY PROJECT SHALL BE IN | | COMPLIANCE WITH THE CURRENT ENERGY CODE WITH MINIMUM | | EFFICIENCIES MET FOR ENVELOPE COMPONENTS, EQUIPMENT, | | AND LIGHTING BEING CHANGED. PROVIDE TWO COPIES OF | | EITHER FORM 502 OR 506 TO VERIFY COMPLIANCE- REFER TO | | TABLE 103.2.1. | | 3) PROVIDE EXHAUST VENTILATION FOR THE JANITOR'S CLOSET | | IN ACCORDANCE WITH TABLE 6-4 ASHRAE 62.1-07. THE | | EXHAUST RATE BY THE TABLE SHALL BE 1.00 CFM PER SQ. FT. | | 4) AS PREVIOUSLY REQUESTED PROVIDE STRUCTURAL DETAILS | | FOR THE CONDENSER PAD AND TIE-DOWN ENGINEERING FOR THE | | CONDENSER. THE SUBMITTED 8-1/2 X 11 COPIED PLAN DETAIL | | IS NOT ACCEPTABLE BECAUSE- A) IT A POOR COPY BARELY | | LEGIBLE. B) IT HAS COPIED (PLAGIRIZED) FROM ANOTHER | | PLAN AND IS NOT SITE SPECIFIC. | | | | CHRISTOPHER L. COLE | | MECHANICAL PLANS EXAMINER | | 561-805-6719 | | [email protected] | | |
|