Date |
Text |
2015-08-13 14:38:44 | PLAN |
| REVIEW COMMENTS |
| |
| 1ST REVIEW: FBC 2010 |
| ROBERT MCDOUGAL, CBO |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| (561) 805-6714 |
| [email protected] |
| |
| DENIED BY BUILDING |
| PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| |
| 1) FBC-R314.3.1 ALTERATIONS, REPAIRS AND ADDITIONS. |
| WHEN ALTERATIONS, REPAIRS OR ADDITIONS REQUIRING A |
| PERMIT OCCUR, OR WHEN ONE OR MORE SLEEPING ROOMS ARE |
| ADDED OR CREATED IN EXISTING DWELLINGS, THE INDIVIDUAL |
| DWELLING UNIT SHALL BE EQUIPPED WITH SMOKE ALARMS |
| LOCATED AS REQUIRED FOR NEW DWELLINGS. |
| |
| 2) SUBMIT ENERGY CALCULATIONS AS REQUIRED BY FBC ENERGY |
| CONSERVATION SECTION 401.2. |
| |
| 3) PROVIDE A FRAMING DETAIL FOR THE EXTERIOR IN-FILL |
| WALLS THAT SHOWS THE FRAMING CONNECTORS / STRAPS AND |
| THE WINDOW OPENING FRAMING. FBC 107.2.1 AND FBC-R601.2 |
| |
| 4) FBC 107.3.5.3 - PROVIDE COMPONENT AND CLADDING |
| DESIGN PRESSURES PURSUANT TO FBC-R301.2 FOR THE SINGLE |
| HUNG WINDOWS IN THE NEW SITTING ROOM. |
| |
| 5) SPECIFY THE CEILING INSULATION TYPE AND R-VALUE ON |
| THE PLANS FOR THE NEW SITTING ROOM. FBC ENERGY |
| CONSERVATION 401.2 |
| |
| 6) FBC 107.3.4 - PROVIDE TWO SETS OF PRODUCT APPROVALS |
| FOR THOSE PRODUCTS WHICH ARE REGULATED BY DCA RULE 9N-3 |
| THAT HAVE BEEN REVIEWED AND APPROVED IN WRITING BY THE |
| DESIGNER OF RECORD. PROVIDE TWO COMPLETE PRODUCT |
| APPROVALS WITH FL OR NOA NUMBERS INCLUDING INSTALLATION |
| INSTRUCTIONS AND MAXIMUM DESIGN PRESSURES FOR THE NEW |
| WINDOW SINGLE HUNG WINDOWS. |
| |
| 7) SHOW COMPLIANCE WITH FBC-R 301.2.1.2 FOR LARGE |
| MISSILE IMPACT PROTECTION AT THE NEW WINDOWS. |
| |
| 8) IF THE NEW WINDOWS ARE NOT RATED FOR LARGE MISSILE |
| IMPACT, THEN FBC - R 301.2.1.2 SUBMIT TWO COPIES OF AN |
| INSTALLATION SCHEDULE AND KEY PLAN FOR THE STORM |
| PANELS. SPECIFY THE OPENING SIZE, THE WIND PRESSURES, |
| TYPE OF ANCHOR, ANCHOR SPACING, EDGE DISTANCE, PANEL |
| LENGTH, PANEL SPAN, SEPARATION DISTANCE FROM PANEL TO |
| GLASS AND THE APPLICABLE SECTION NUMBER FROM THE |
| INSTALLATION DRAWINGS. I HAVE INCLUDED A LINK TO THE |
| CONSTRUCTION SERVICES DEPARTMENT SITE THAT HAS MANY OF |
| THE RELATED FORMS INCLUDING |
| THE SCHEDULE FOR INSTALLATION OF OPENING PROTECTIVE |
| DEVICES. |
| HTTP://WPB.ORG/DEVELOPMENT/FORMS-AND-PUBLICATIONS/ |
| |
| 9) THE VALUE OF $10,000.00 ON THE APPLICATION FOR THE |
| SCOPE OF WORK SHOWN ON THE PLANS APPEARS TO |
| UNDERVALUED. SUBMIT A COPY OF THE SIGNED CONTRACT. FBC |
| 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING |
| PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE |
| TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY |
| LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST |
| PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS |
| SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| |
| |