Plan Review Notes For Permit 15050733 |
Permit Number |
15050733 |
|
Review Stop |
E |
Sequence Number |
2 |
|
Notes |
Date |
Text |
2015-08-18 12:51:30 | PLEASE NOTE THAT I, MIKE ALBARRAN, ELECTRICAL PLANS | | EXAMINER HAVE COMPLETED THE REVIEW OF THE ABOVE | | MENTIONED JOB. BELOW ARE THE COMMENTS WITH REGARDS TO | | THE REQUIRED CORRECTIONS. THE FOLLOWING ITEMS SHALL BE | | CORRECTED AND THE PLANS RESUBMITTED FOR ANOTHER REVIEW. | | 1. FBC REQUIRES THAT A MINIMUM OF TWO SETS OF DRAWINGS | | BE PROVIDED. ONLY ONE SET WAS SUBMITTED AT THE TIME OF | | THE RESUB. | | 2. THE ELECTRICAL COMMENTS PREVIOUSLY MADE AS A RESULT | | OF THE FIRST REVIEW HAVE NOT BEEN ADDRESSED. | | 3. YOU WERE INSTRUCTED AT THE TIME OF THE FIRST DENIAL | | ON HOW TO PROPERLY RESUBMIT YOUR CORRECTIONS. I HAVE | | NOT FOUND A RESPONSE LETTER OR NARRATIVE ADDRESSING THE | | ELECTRICAL COMMENTS. | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | CORRECTED PAGES INTO TO SUBMITTAL AND LEAVE THE | | PREVIOUSLY REVIEWED SHEETS. | | | | IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO | | CONTACT ME DIRECTLY. | | |
|