2015-06-18 08:00:06 | 1) SHT. S-1 - ZONING & OCCUPANCY BOX - SHOWS THE |
| OCCUPANCY TYPE AS MERCANTILE AND THE GENERAL BUILDING |
| CODE ANALYSIS BOX ON E-1 NOTES THE OCCUPANCY AS |
| BUSINESS.CLARIFY. ALSO, THE INFORMATION IN THE GENERAL |
| BUILDING CODE ANALYSIS BOX ON SHT. E-1 DOES NOT APPEAR |
| TO BE FOR THIS SPACE. THE TENANT SPACE IS LISTED AS |
| 6300 SQ.FT. AND SHT. S-1 NOTES THIS SPACE AS 1300 SQ. |
| FT. IF DOES NOT APPLY TO THIS SPACE THEN DELETE IT FROM |
| THE PLANS. |
| 2) THIS OCCUPANCY SHALL BE CLASSIFIED PER SEC. 302 OF |
| THE 2010 - FBC-BUILDING.INDICATE THE CORRECT OCCUPANCY |
| ON BOTH SHEETS OF BOTH SETS OF PLANS. |
| 3) THERE IS ALSO A DISCREPANCY IN THE TYPE OF |
| CONSTRUCTION ON THE PLANS.SHT. S-1 NOTES THE TYPE OF |
| CONSTRUCTION AS TYPE III ( IN THE ZONING & OCCUPANCY |
| BOX) & AS TYPE IIB ( IN THE CODE INFORMATION BOX). WHAT |
| TYPE OF CONSTRUCTION IS IT? SHT. E-1 SHOWS THE TYPE OF |
| CONSTRUCTION AS IIB IN THE GENERAL BUILDING CODE |
| ANALYSIS BOX. THE TYPE OF CONSRTUCTION SHALL BE THE |
| SAME ON ALL SHEETS. REVISE THE INFORMATION ON ALL |
| SHEETS TO MATCH. |
| 4) THE NEW P-1 SHEET THAT WAS SUBMITTED SHOWS THE |
| OCCUPANCY CLASSIFICATION AS "BUSINESS" AND |
| "MERCANTILE". CLARIFY. THIS DOES NOT APPEAR TO BE A |
| MIXED OCCUPANCY AND IT IS NOT A MERCANTILE |
| OCCUPANCY.REVISE ALL THE SHEETS TO REFLECT THE CORRECT |
| OCCUPANCY OF THIS SPACE AND THE CORRECT TYPE OF |
| CONSTRUCTION. |
| 5) THE FLOOR DRAIN SHALL BE EQUIPPED WITH A FLOOR |
| DRAIN.SHOW THIS ON THE PLAN. |
| 6) THERE IS NO CONNECTION OF THE HOT WATER LINE SHOWN |
| AT THE HOT WATER HEATER. CLARIFY. |
| |
| NOTE: CORRECTIONS SHALL BE MADE TO ALL THE SHEETS ON |
| BOTH SETS OF PLANS. |
| |
| |
| PLUMBING PLAN REVIEW |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| 561-805-6692 |
| [email protected] |
| |
| |