2015-06-16 12:44:05 | 1ST REVIEW: FBC 2010 MECHANICAL |
| |
| 1) SHEET M-1: THE CHILLER ROOM VENTILATION CALCULATIONS |
| SHALL BE BASED ON THE AMOUNT OF REFRIGERANT (1600 LBS.) |
| IN CHILLERS 1 & 2 BECAUSE THEY OPERATE TOGETHER AS A |
| SINGLE SYSTEM. PLEASE REVISE THE CALCULATIONS, AND |
| SELECT AN EMERGENCY EXHAUST FAN SIZED CONSISTENTLY WITH |
| THE CALCULATION- SECTION 1105.6.4 FMC-10. |
| 2) M-2: CLARIFY ON THE PLANS HOW THE NORMAL VENTILATION |
| SYSTEM IS BEING CONTROLLED. DOES THE EF-7 ROOF FAN RUN |
| CONTINUOUSLY, BY AN INDIVIDUAL SWITCH, VIA CONNECTION |
| TO A LIGHT SWITCH? PLEASE NOTE THAT PER SECTION 1105.6, |
| VENTILATION SYSTEMS FOR MACHINERY ROOMS SHALL BE |
| CAPABLE OF EXHAUSTING THE MINIMUM QUANTITY OF AIR AT |
| NORMAL OPERATING AND EMERGENCY CONDITIONS, MEANING THAT |
| THE REQUIRED NORMAL EXHAUST RATE SHALL BE MAINTAINED |
| OVER AND ABOVE THE REQUIRED EMERGENCY EXHAUST RATE. |
| PLEASE CORRECT THE NOTE SPECIFYING EF-7 TO SHUT DOWN |
| WHEN EF-CH-1 ACTIVATES. |
| 3) REFRIGERANT LEAK DETECTION AND ALARM: A) THE |
| ENGINEER OF RECORD SHALL PROVIDE REVIEWED AND APPROVED |
| TESTING DATA, OR REPORTS FROM QUALIFIED SOURCES |
| INDICATING THE TLV-TWA (OR TOXICITY MEASURE CONSISTENT |
| THEREWITH) FOR THE R-123 REFRIGERANT. IN CONJUNCTION |
| WITH THOSE REPORTS THE ENGINEER SHALL ALSO SUBMIT |
| REVIEWED AND APPROVED MANUFACTURER?S SPECIFICATIONS FOR |
| THE REFRIGERANT LEAK DETECTORS. BASED ON THE REPORTS |
| AND SPECIFICATIONS , THE REVISED PLANS SHALL INDICATE |
| THE SPACING OF THE DETECTORS, THEIR EXACT MOUNTING |
| LOCATIONS, AND AT WHICH VALUE OR LEVEL OF REFRIGERANT |
| DETECTION THEY WILL ACTUATE THE ALARM SYSTEM - SEE |
| SECTION 8.11.2.1 ASHRAE 15, AND SECTION 8.6 ASHRAE 34, |
| AND SECTION 53.11.2.1 FLORIDA FIRE PREVENTION CODE. B) |
| SHOW ON THE PLAN THE LOCATION OF THE REQUIRED ALARM |
| NOTIFICATION DEVICE AT THE STAIRWELL ENTRANCE PER |
| ASHRAE 15 AND FFP. C) PROVIDE A SEQUENCE OF OPERATION |
| DIAGRAM ON THE PLAN FOR THE ALARM SYSTEM. |
| 4) PROVIDE DETAILS FOR, AND THE TERMINATION LOCATIONS |
| OF PRESSURE RELIEF DEVICES, FUSIBLE PLUG AND PURGE |
| SYSTEMS PER SECTION 1105.7 FMC-10. PLEASE NOTE ALL |
| SYSTEMS SHALL TERMINATE 15 FT. ABOVE THE ADJOINING |
| GRADE (MAIN ROOF LEVEL) AND 20 FT. FROM ANY VENTILATION |
| OPENING. |
| 5) THE TERMINATION OR DISCHARGE LOCATION FOR THE NEW |
| EF-CH-1 SHALL BE LOCATED A MINIMUM OF 10 FT. ABOVE THE |
| ROOF LEVEL PER SECTION 501.2(2) FMC-10. PLEASE REVISE |
| THE PLAN ACCORDINGLY. |
| 6) SUBMIT MANUFACTURER'S SPECIFICATIONS AND A MIAMI |
| DADE NOA OR FL. PRODUCT APPROVAL FOR THE NEW EXHAUST |
| FAN. ALL SUBMITTALS SHALL BE REVIEWED AND APPROVED BY |
| THE ENGINEER OF RECORD. |
| 7) PROVIDE DETAILS FOR ANCHORING THE CONDENSER AND |
| CHILLED WATER PUMPS, AND ANY REQUIRED PIPING SUPPORT |
| STANDS TO THE EXISTING SLAB. |
| 8) INDICATE ON THE PLAN WHAT NECESSARY ALTERATIONS WILL |
| BE MADE TO THE EXISTING STRUCTURE TO FACILITATE REMOVAL |
| AND REPLACEMENT OF THE CHILLERS AND PUMPS, AND PROVIDE |
| A DETAILED WORK SCHEDULE REPORT FROM BEGINNING TO TOTAL |
| COMPLETION OF THE PROJECT. |
| 9) PLEASE NOTE THAT COMMISIONING OF THE SYSTEM IS |
| REQUIRED FOR FINAL APPROVAL OF THE PROJECT PER SECTION |
| 503.2.9 FBC-10 ENERGY CONSERVATION. THE ENGINEER OF |
| RECORD SHALL PROVIDE EVIDENCE OF SYSTEM COMPLETION |
| INCLUDING A WRITTEN BALANCE REPORT TO BE PROVIDED TO |
| THE OWNER OF THE BUILDING OR DESIGNATED REPRESENTATIVE. |
| PLEASE PROVIDE NOTES ON THE PLAN DETAILING THE TESTING |
| AND BALANCING PROCEDURE. |
| |
| CHRISTOPHER COLE |
| MECHANICAL PLANS EXAMINER |
| 561-805-6719 |
| [email protected] |
| |
| |
| |
| |