2015-07-07 09:07:26NEW SINGLE FAMILY RESIDENCE, BUILDING REVIEW COMMENTS.
 CODE: 2010 FBC.
  
 1- PLANS ARE MISSING THE DOORS AND WINDOWS SCHEDULE.
 PRODUCT APPROVALS SUBMITTED WILL BE REVIEWED WHEN THE
 DOORS AND WINDOWS SCHEDULES ARE PROVIDED. SEC. R301 OF
 2010 FBC.
 ALSO, EGRESS WILL BE REVIEWED WHEN COMPLETE INFORMATION
 IS SUBMITTED.
  
 2-PROVIDE PRODUCT APPROVAL AS REQUIRED BY F.A.C.
 61G20-3 FOR:
 A) ENTRY DOOR AS SHOWN ON PLANS. INFORMATION SUBMITTED
 DOESN'T HAVE A FLORIDA PRODUCT APPROVAL NUMBER OR
 MIAMI-DADE NOA NUMBER. IF THERE IS NO AN APPROVED
 ASSEMBLY, THEN MANUFACTURER MAY SUBMIT COMPLETE
 ENGINEERING FOR BUILDING OFFICIAL APPROVAL.
  
 B) THERMA TRU DOOR PRODUCT APPROVAL FL 7630-R4
 SUBMITTED DOESN'T MEET THE DESIGN PRESSURES CALCULATED
 BY THE ENGINEER OF RECORD. NEED PRODUCT APPROVAL THAT
 MEETS THE CALCULATED DESIGN PRESSURES.
  
 C) FLAT ROOF ASSEMBLY. AND, CLEARLY IDENTIFY APPROVED
 ASSEMBLY TO BE INSTALLED. AND, PROVIDE SIGNED AND
 SEALED RAS 117 CALCULATIONS IF REQUIRED TO MEET THE
 DESIGN PRESSURES OF SEC. R301.
  
 D) BALCONY WATERPROOFING UNDERLAYMENT THAT IS DESIGNED
 TO RECEIVE TILE AS SHOWN ON PLANS. AND, PROVIDE SIGNED
 AND SEALED RAS 117 CALCULATIONS IF REQUIRED TO MEET THE
 DESIGN PRESSURES OF SEC. R301. ALSO, PROVIDE PRODUCT
 APPROVAL FOR MATERIAL SPECIFIED FOR BALCONY ABOVE ENTRY
 AREA (WITH RAS 117 CALCULATIONS, IF REQUIRED).
  
 E) BAHAMA SHUTTERS AS SHOWN ON SHEET A3.1. AND, PROVIDE
 COMPLETE INSTALLATION SCHEDULE.
  
 F) GARAGE DOOR AS SHOWN ON SHEET A3.1
  
 G) PRECAST LINTELS AS SPECIFIED ON PLANS.
  
 3- ENGINEER OF RECORD TO REVIEW AND APPROVE IN WRITING
 (NOT SIGNING AND SEALING) ALL PRODUCT APPROVALS AS
 REQUIRED BY SEC. 107.3.4.1 CITY AMENDMENTS.
 NOTE: PRODUCT APPROVALS SUBMITTED HAVE A
 DRAWINGS/SUBMITTAL REVIEW STAMP. THIS STAMP IS NOT
 ACCEPTABLE. IT DOESN'T IDENTIFY THE FIRM OR THE DESIGN
 PROFESSIONAL REVIEWING THE PRODUCT APPROVALS.
  
 4- 5V-CRIMP ROOF PANEL NOA 11-0810.10 SUBMITTED:
 CLEARLY IDENTIFY WHICH SYSTEM IS GOING TO BE USED TO
 VERIFY COMPLIANCE WITH THE DESIGN PRESSURES OF SEC.
 R301 OF 2010 FBC-RESIDENTIAL.
  
 5- WINDOW MULLIONS: CLEARLY IDENTIFY ALL MULLION SIZES
 TO BE USED TO VERIFY COMPLIANCE WITH THE DESIGN
 PRESSURES OF SEC. R301 OF 2010 FBC-RESIDENTIAL.
  
 6- PROVIDE DRAINAGE PLAN SHOWING COMPLIANCE WITH SEC.
 R401.3 OF 2010 FBC-RESIDENTIAL.
  
 7- REVISE ENERGY CALCULATIONS SUBMITTED. SEC.
 103.2.1.1.2 AND SEC. 103.2.2 OF 2010 FBC-ENERGY
 CONSERVATION.
 ***NOTE: INFORMATION ON ENERGY CALCULATIONS AND PLANS
 NEED TO BE COORDINATED TO AVOID UNNECCESARY DELAYS AND
 CONFLICTS.
  
 A) COMPLETE INFORMATION ON TOP OF FORM: OWNER, CORRECT
 BUILDER'S NAME, PERMIT OFFICE AND JURISDICTION NUMBER.
  
 B) CONDITIONED FLOOR AREA ON ITEM #6 DOESN'T MATCH
 PLANS. NOTE: ALSO TAKE INTO CONSIDERATION THE BONUS
 ROOM ON SECOND FLOOR. SEE MECHANICAL PLAN.
  
 C) NEED INSULATION ON EXTERIOR WALLS, ADJACENT WALLS.
 SEC. 401.2 OF 2010 FBC-ENERGY CONSERVATION.
  
 D) NEED INSULATION ON CEILING. CLARIFY WHERE ARE THE
 CATHEDRAL/SINGLE ASSEMBLY CEILINGS. SEC. 401.2 OF 2010
 FBC-ENERGY CONSERVATION.
  
 E) NEED INSULATION BETWEEN A/C SPACES AND NON-A/C
 SPACES. SEC. 401.2 OF 2010 FBC-ENERGY CONSERVATION.
  
 F) OWNER/AGENT TO SIGN AND DATE BOTTOM OF FORM. SEC.
 103.2.3.2 OF 2010 FBC-ENERGY CONSERVATION.
  
 G) REVISE TYPE OF ROOF ON PAGE 2 OF 6 TO MATCH PLANS.
  
 H) CLARIFY WHERE ARE THE WOOD DOORS SHOWN ON PAGE 3 OF
 6.
  
 I) REVISE WINDOW OVERHANG DEPTH AND SEPARATION TO MATCH
 PLANS.
  
 ***NOTE: LABELS WILL BE REQUIRED FOR INSPECTION FOR THE
 WINDOWS AND DOORS U-FACTOR AND SHGC FACTOR SPECIFIED ON
 ITEM #7.
  
 8- ELEVATIONS SHOWN ON THE A1.1 SITE PLAN DON'T MATCH
 THE ELEVATIONS SHOWN ON THE SURVEY. REVISE AS REQUIRED
 TO MATCH. SEC. 107.2.1 CITY AMENDMENTS.
  
 9- SHEET A2.1:
 A) SPECIFY POWDER ROOM DOOR SIZE TO SHOW COMPLIANCE
 WITH SEC. R320.
  
 B) PROVIDE SPECIFICATIONS OF GARAGE DOOR LEADING TO
 MAIN HOUSE TO SHOW COMPLIANCE WITH SEC. R302.5.1
  
 10- SET OF PLANS IS MISSING DRAWING A7.1 LISTED IN THE
 LIST OF DRAWINGS ON SHEET A1.1. SEC. 107.2.1 CITY
 AMENDMENTS.
  
 11- PROVIDE COMPLETE HANDRAIL AND GUARDRAILS (INTERIOR
 AND EXTERIOR) DETAILS AND SPECIFICATIONS SHOWING
 COMPLIANCE WITH THE LIVE LOADS OF TABLE R301.5 AND ALL
 THE REQUIREMENTS OF SEC. R311.7.7 AND R312.
  
 12- PROVIDE COMPLETE DETAILS AND SPECIFICATIONS FOR
 STAIRWAY SHOWING COMPLIANCE WITH SEC. R311.7.
  
 13- PROVIDE COMPLETE DETAILS AND SPECIFICATIONS FOR THE
 CONSTRUCTION OF EXTERIOR CEILINGS AT LOGGIA AND ENTRY
 PORCH. SEC R301.
  
 14- SHEET A2.2: CLARIFY WHAT'S THE DOTTED SQUARE SHOWN
 IN THE CENTER OF THE STAIRWAY. SEC. 107.2.1 CITY
 AMENDMENTS.
  
 15- SHEET A2.3:
 A) FLAT ROOF NEED MAIN ROOF DRAINS AND AND OVERFLOW
 SCUPPERS TO COMPLY WITH SEC. R903.4 AND R903.4.1
  
 B) REVISE ROOF DRAIN DETAIL. CLARIFY IF INSTALLING ROOF
 RIGID INSULATION. COORDINATE WITH BUILDING WALL
 SECTIONS, THE ENERGY CALCULATIONS AND FLAT ROOF PRODUCT
 APPROVAL APPROVED ASSEMBLY. SEC. 103.2.2 OF 2010
 FBC-ENERGY CONSERVATION.
  
 C) COORDINATE ROOF MEMBRANE AND FLAT ROOF NOTES WITH
 PRODUCT APPROVALS SUBMITTED TO AVOID CONFLICTS. SEE
 APPROVED ASSEMBLIES AND REVISE INFORMATION AS REQUIRED.
 SEC. 107.2.1 CITY AMENDMENTS.
  
 16- GUTTERS WITH DOWNSPOUTS ARE REQUIRED FOR EAVES LESS
 THAN 6". PROVIDE COMPLETE DETAILS AND SPECIFICATIONS.
 PROVIDE DIMENSIONS FOR ALL EAVES. SEC. R318.6
  
 17- SPECIFY WINDOW SILL HEIGHT ON ALL SECOND FLOOR
 WINDOWS TO VERIFY COMPLIANCE WITH SEC. R612.2
  
 18- LABELING ORIENTATION OF EAST AND WEST ELEVATIONS
 ARE INCORRECT.. EAST ELEVATION IS WEST ELEVATION AND
 WEST ELEVATION IS EAST ELEVATION. REVISE AS REQUIRED TO
 MATCH ACTUAL BUILDING ORIENTATION. SEC. 107.2.1 CITY
 AMENDMENTS.
  
 19- PROVIDE FRAMING DETAILS FOR ARCHED ENTRY DOOR. SEC.
 R301.
  
 20- PROVIDE ICC EVALUATION REPORT FOR THE SPECIFIED
 ICYNENE INSULATION (PLEASE MAKE SURE IS THE CURRENT
 REPORT). SEC. R316.
  
 21- PROVIDE SPECIFICATIONS FOR CEILING ABOVE GARAGE.
 TABLE R302.6.
  
 22- SPECIFY ATTIC ACCESS LOCATION AND SIZE. SEC. R807.
  
 23- COORDINATE FASTENING OF WINDOW STRUCTURAL BUCKS
 SHOWN ON SHEET A5.2 WITH FASTENING SHOWN ON DETAIL 08
 OF SHEET S400. SEC. 107.2.1 CITY AMENDMENTS.
  
 24- SHEET S000: (1) CLARIFY WHY THERE IS NOT ROOF ZONE
 #3 ON MASTER BEDROOM BALCONY. (2) CLARIFY WHY FLAT ROOF
 ON SECOND FLOOR IS ZONE 1. SEC. R301.
  
 25- PROVIDE COPY OF SOIL TEST REPORT REFERENCED ON THE
 NOTES OF THE FOOTING SCHEDULE. SEC. R401.4.
  
 26- NOA 06-0222.01 SPECIFIED FOR PRECAST LINTELS ON
 SHEET S400 IS EXPIRED. NEED CURRENT NOA. COORDINATE
 WITH NOA SUBMITTED.
  
 *** PLEASE PROVIDE REPONSE LETTER ADDRESSING EACH
 COMMENT TO EXPEDITE THE REVIEW PROCESS.
 *** REPLACE ANY REVISED DRAWING TO EXPEDITE THE REVIEW
 PROCESS.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 (561)805-6712
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved