2015-04-16 05:58:21 | 1) THE PLAN SHOWS A WATER HEATER. SUBMIT MANUFACTURER'S |
| SPECIFICATIONS FOR THE WATER HEATER. IF THE WATER |
| HEATER IS NEW, AN ELECTRIC PERMIT AND ELECTRICAL PLANS |
| ARE REQUIRED.WPB AMEND. TO 2010 FBC SEC. 107.2.1. |
| 2)SIZE THE WATER LINES TO THE WATER HEATER AND THE |
| FIXTURES.WPB AMEND. TO 2010 FBC SEC. 107.2.1 |
| 3) SHOW THE FIXTURE CLEARANCE OF THE WATER CLOSET FROM |
| THE SIDE WALLS. 2010 FBC RESIDENTIAL, SEC. P2705.1 (5). |
| 4) SHOW THE LENGTH OF THE SHOWER. COMPLY W/ 2010 FBCR |
| SEC.P2708.1. |
| 5) THE TRAP FOR THE SINK SHALL CONNECT TO THE VENT. |
| 2010FBCR P3101.2, ZP3201.5. |
| 6) SIZE THE VENT FOR THE TOILET.2010 FBCR SEC.P3102.3. |
| 7) CLEANOUTS ARE REQD. IN THE STACKS PER THE 2010 FBCR |
| SEC.P3005.2.6. |
| 8) SHOWER VALVE SHALL COMPLY WITH 2010 FBCR SEC. |
| P2708.3.VALVES SHALL BE PRESSURE BALANCE, THERMOSTATIC |
| MIXING, OR COMBINATION PRESSURE BALANCE/ |
| THERMOSTATIC-MIXING VALVE TYPES . |
| 9) THE SANITARY DRAWING APPEARS TO DHOW FLAT, DRY VENTS |
| WHICH ARE NOT PERMITTED BY THE PLUMBING CODE. COMPLY |
| WITH THE 2010 FBCR SEC.P3104.3. |
| 10) INCLUDE THE 3" SEWER ON THE SCOPE OF WORK ON THE |
| PERMIT APPLICATION. |
| 11) A BUILDING PERMIT AND AN ELECTRICAL PERMIT WILL BE |
| REQUIRED FOR THE INSTALLATION OF THE NEW BATHROOM |
| WALLS, DOORS AND ELECTRICAL REQUIREMENTS FOR THE |
| BATHROOM. |
| 12) BATHROOMS SHALL BE PROVIDED WITH GLAZING IN |
| ACCORDANCE WITH THE 2010 FBCR SEC. R303.3 OR ARTIFICIAL |
| LIGHT AND MECHANICAL VENTILATION SHALL BE PROVIDED. |
| |
| |
| PLUMBING PLAN REVIEW |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| 561-805-6692 |
| [email protected] |
| |