2015-05-09 16:17:08 | REVISE YOUR PLANS IN RESPONSE TO THE FOLLOWING REVIEW |
| COMMENTS: |
| |
| PLEASE KEEP THE FOLLOWING ELEMENTS IN MIND WHEN |
| PREPARING YOUR SIGNAGE DESIGN DOCUMENTS: |
| |
| 1) PROVIDE PLANS WITH A CLEARLY DEFINED SCOPE OF WORK. |
| THE PERMIT APPLICATION STATES THE PURPOSE TO BE FOR THE |
| INSTALLATION OF SIGNAGE. THE PLANS HOWEVER INDICATE |
| POLES FOR CAMERAS AND FIBER OPTICS, AND DO NOT APPEAR |
| TO INDICATE ANYTHING RELATED TO THE INSTALLATION OF |
| SIGNAGE. |
| |
| 2) ELECTRIC SIGNS, SECTION SIGNS, AND OUTLINE LIGHTING, |
| FIXED, MOBILE, OR PORTABLE, SHALL BE LISTED AND |
| INSTALLED IN CONFORMANCE WITH THAT LISTING, UNLESS |
| OTHERWISE APPROVED BY SPECIAL PERMISSION. 600.3 |
| LISTING. |
| |
| 3) EACH SIGN AND OUTLINE LIGHTING SYSTEM, OR FEEDER |
| CIRCUIT OR BRANCH CIRCUIT SUPPLYING A SIGN OR OUT-LINE |
| LIGHTING SYSTEM, SHALL BE CONTROLLED BY AN EXTERNALLY |
| OPERABLE SWITCH OR CIRCUIT BREAKER THAT WILL OPEN ALL |
| UNGROUNDED CONDUCTORS WITHIN SIGHT OF THE SIGN NEC |
| 600.6(A)(1) |
| |
| 4) ALL EXTERIOR LIGHTING NOT EXEMPTED BY FBC 505.1 |
| SHALL HAVE AUTOMATIC CONTROLS TO TURN OFF AT DAYLIGHT |
| OR WHEN NOT REQUIRED. CONTROLS SHALL BE PHOTOSENSOR & |
| TIME CLOCK OR ASTRONOMICAL TIME SWITCH. ALL TIME |
| SWITCHES SHALL BE CAPABLE OF RETAINING PROGRAMING |
| DURING A LOSS OF POWER FOR A MINIMUM OF 10 HOURS. FBC-E |
| 505.2.4 |
| |
| 5) PROVIDE PROOF OF OVERALL VALUE OF THE PROJECT IS |
| REQUIRED AND SHALL BE THE TOTAL REPLACEMENT VALUE TO |
| INCLUDE ARCHITECTURAL DESIGN FEES, FABRICATION, |
| STRUCTURAL, AND ELECTRICAL, PLUS OVERHEAD AND PROFIT. |
| FINAL PERMIT VALUATION SHALL BE SET BY THE BUILDING |
| OFFICIAL. FBC WPB AMENDMENTS. SECTION 109.3 |
| |
| |