Date |
Text |
2015-06-24 17:20:20 | RECOVERY ROOF FOURTH BUILDING REVIEW CHECKLIST. |
| CODE: 2010 FBC. |
| |
| 1- NEW FLORIDA PRODUCT APPROVAL FL5680-R14 SUBMITTED: |
| SELECTED RECOVERY ASSEMBLY R-28 CAN NOT BE USED BECAUSE |
| THIS ASSEMBLY MAXIMUM DESIGN PRESSURE IS - 75 PSF. THIS |
| DESIGN PRESSURE DOESN'T MEET THE DESIGN PRESSURES |
| CALCULATED BY THE ENGINEER ON THE ECS REPORT SUBMITTED. |
| NOTE #9 ON PAGE 2 OF 76 STATES "FOR FULLY BONDED |
| ASSEMBLIES, THE MAXIMUM DESIGN PRESSURE FOR THE |
| SELECTED ASSEMBLY SHALL MEET OR EXCEED CRITICAL DESIGN |
| PRESSURE DETERMINED IN ACCORDANCE WITH FBC CHAPTER 16, |
| AND NO RATIONAL ANALYSIS IS PERMITTED." |
| |
| NOTE: PER CONVERSATION WITH ROBERT BROWN (BUILDING |
| OFFICIAL) THERE ARE TWO OPTIONS SINCE THE PROPOSED |
| RECOVERY ASSEMBLY IS A FULLY BONDED ASSEMBLY: |
| |
| A) PROVIDE AN APPROVED ASSEMBLY THAT MEETS THE DESIGN |
| PRESSURES FOR ALL ROOF ZONES. OR |
| |
| B) HIRE AN STATE CERTIFIED ROOFING CONSULTANT TO |
| PROVIDE COMPLETE ANALYSIS OF PROPOSED ROOFING ASSEMBLY. |
| FOR THIS OPTION, PLEASE CONTACT ROBERT BROWN |
| (561)805-6652 FOR PROPER DOCUMENTATION. |
| |
| |
| NOTE: |
| MOISTURE TEST SUBMITTED DOESN'T MEET THE STANDARD |
| PROCEDURES FOR ROOF MOISTURE SURVEYS (TAS 126-95). |
| |
| IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT |
| JULIO GOMEZ |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| DEVELOPMENT SERVICES DEPARTMENT |
| (561)805-6712 |
| [email protected] |