2016-02-17 18:24:51 | 2010 FLORIDA BUILDING CODE W/ 2010 WEST PALM BEACH |
| AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1, |
| ADMINISTRATION, 2010 EDITION 2012 FBC SUPPLEMENTS |
| ADOPTED APRIL 25/2013. |
| |
| ***PROVISOS*** |
| ***ISSUED AT CONTRACTOR'S RISK*** |
| |
| 1. DELEGATED ENGINEERING: HORIZONTAL TRELLIS FOUND ON |
| THE SOUTH & WEST SIDES OF THE BUILDING (SEE SECTION 6, |
| 8 & 9 PAGE A7.5.4). PLEASE SHOW WIND DESIGN AND |
| ANCHORING DETAILS. FBC-B 1609.6.4.4.1 COMPONENTS & |
| CLADDING. FL 61G-15-30.006 (3) THE DELEGATED ENGINEER |
| SHALL FORWARD THE DELEGATED ENGINEERING DOCUMENTS TO |
| THE ENGINEER OF RECORD FOR REVIEW. |
| |
| 2. THE LETTER FROM JOE CUSCHIERI P. E. ACOUSTICS AND |
| VIBRATION CONSULTANT HAS SUBMITTED A RATIONAL ANALYSIS |
| AS TO HOW THEY ARE ACHIEVING THE IIC AND STC RATINGS. |
| ALL FLOORS (FLOOR SLABS ARE 8 INCH POST TENSION SLABS) |
| THE 3RD -16TH STORY. PLEASE PROVIDE COMPLIANCE WITH |
| BLDG TYPE: TYPE I/ TYPE II FLOOR INSULATION |
| |
| DEFERRED SUBMITTALS. 107.3.4.2. SUBMIT STC, IIC, AND |
| FLAME SPREAD TEST REPORTS (REVIEWED BY DOR) PRIOR TO |
| INSTALLATION OF FLOORING UNDERLAYMENT. |
| (A) FBC-B 2010 1207.3 STRUCTURE-BORNE SOUND. |
| FLOOR/CEILING ASSEMBLIES BETWEEN DWELLING UNITS OR |
| BETWEEN A DWELLING UNIT AND A PUBLIC OR SERVICE AREA |
| WITHIN THE STRUCTURE SHALL HAVE AN IMPACT INSULATION |
| CLASS (IIC) RATING OF NOT LESS THAN 50 (45 IF FIELD |
| TESTED) WHEN TESTED IN ACCORDANCE WITH ASTM E 492. |
| (B) FBC-B 2010 1207.2 1207.2 AIR-BORNE SOUND. |
| WALLS, PARTITIONS AND FLOOR/CEILING ASSEMBLIES |
| SEPARATING DWELLING UNITS FROM EACH OTHER OR FROM |
| PUBLIC OR SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION |
| CLASS (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) |
| FOR AIR-BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM |
| E 90. |
| (C) FLAME SPREAD- FBC-B 2010 603.1.2 EXCEPTION 2. |
| INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID |
| DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED |
| TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200 |
| (TESTED IN ACCORDANCE WITH ASTM E 84 OR UL 723). |
| |
| 3. PROVISO: NOTE THERE IS NO KNOWING WHICH WAY A R2 |
| OCCUPANCY CAN TURN INTO EITHER AN APARTMENT BUILDINGS |
| ARE AN R-2 AS WELL AS CONDOMINIUMS. IT ISN?T UNTIL C.O. |
| THAT THE DOCUMENTS GO TO THE STATE FOR THE DECLARATION |
| OF CONDOMINIUM. THIS NEXT CODE ISSUE WILL BE A PROVISO, |
| THE PLANS BEING REVIEWED AS THIS IS TO BE A CONDOMINIUM |
| AND UNDER FAIR HOUSING. |
| PROVISO: NOTE THIS POOL DECK AND POOL ARE COVERED UNDER |
| THE FAIR HOUSING ACT, TO DATE THE GUIDELINES ONLY |
| REQUIRES ACCESS MUST BE PROVIDED TO THE POOL DECK AREA, |
| NOT AN ACCESSIBLE ROUTE (RAMP OR LIFT) DOWN INTO THE |
| WATER INTO THE POOL. ON THE OTHER HAND IF THE |
| ASSOCIATION ELECTS TO ALLOW THE COMMUNITY ROOM, POOL, |
| AND OR POOL DECK TO BE RENTED OUT FOR PARTIES THAT THE |
| PUBLIC COULD USE, THEN THIS AREA WOULD BE REQUIRED TO |
| MEET FLORIDA ACCESSIBILITY SECTION 1009 OF THE |
| ACCESSIBILITY CODE POOL LIFTS. |
| |
| 4. THE PLANS INDICATE THE USE OF PRE-ENGINEERED A/C |
| STANDS. WHEN FIGURING THE REQUIRED CLEARANCES IN HEIGHT |
| REQUIRED BY TABLE FBC-B 1509.7, THE CLEARANCE IS FROM |
| THE FINISHED ROOF HEIGHT, ABOVE THE LIGHTWEIGHT |
| CONCRETE ROOF. |
| |
| 5. PRODUCT APPROVALS: DEFERRED SUBMITTAL. ARCHITECT |
| WILL REVIEW/ APPROVE/ STAMP EACH PRODUCT APPROVAL W/ |
| SHOP DRAWING STAMP BEFORE SUBMISSION TO CITY BUILDING |
| DEPARTMENT. |
| |
| 6. A7.5.3, PROVISO: NOTE: THE POOL TRELLIS STRUCTURE |
| (PERGOLA) THIS DETAIL INDICATES IT IS GOING TO BE |
| DESIGNED BY A SPECIALTY ENGINEER. BEFORE SUBMITTAL TO |
| THE BUILDING DEPARTMENT, THE PLANS WILL NEED TO BE |
| REVIEWED BY THE ENGINEER OF RECORD. FL 61G-15-30.006 |
| (3) THE DELEGATED ENGINEER SHALL FORWARD THE DELEGATED |
| ENGINEERING DOCUMENTS TO THE ENGINEER OF RECORD FOR |
| REVIEW. |
| |
| 7. PAGE 136 A7.5.4. PROVISO: DETAIL # 5 RIGID ALUMINUM |
| CANOPY WITH FABRIC WRAPPED WILL REQUIRE WIND DESIGN |
| CRITERIA SEE OPTIONS FOUND UNDER FBC-B 3105.4 . ALSO: |
| FL 61G-15-30.006 (3) THE DELEGATED ENGINEER SHALL |
| FORWARD THE DELEGATED ENGINEERING DOCUMENTS TO THE |
| ENGINEER OF RECORD FOR REVIEW. |
| |
| 8. FBC-B 403.4.6 SMOKE REMOVAL. SMOKE CONTROL SHALL BE |
| PROVIDED IN ACCORDANCE WITH SECTION 909. |
| |
| 9. PROVISO: FBC-B 403.5.3.1 STAIRWAY COMMUNICATION |
| SYSTEM. A TELEPHONE OR OTHER TWO-WAY COMMUNICATIONS |
| SYSTEM CONNECTED TO AN APPROVED CONSTANTLY ATTENDED |
| STATION SHALL BE PROVIDED AT NOT LESS THAN EVERY FIFTH |
| FLOOR IN EACH STAIRWAY WHERE THE DOORS TO THE STAIRWAY |
| ARE LOCKED. |
| |
| 10. FBC-B 403.5.4 SMOKEPROOF EXIT ENCLOSURES. EVERY |
| REQUIRED EXIT STAIRWAY SERVING FLOORS MORE THAN 75 FEET |
| (22 860 MM) ABOVE THE LOWEST LEVEL OF FIRE DEPARTMENT |
| VEHICLE ACCESS SHALL COMPLY WITH SECTIONS 909.20 AND |
| 1022.9. |
| |
| 11. THE POOL AND SPA PLANS HAVE NOT BEEN REVIEWED. A |
| SEPARATE PERMIT WITH SEPARATE APPLICATIONS, PLANS, FEES |
| AND REVIEWS REQUIRED. |
| |
| 12. SEE FIRE DEPARTMENT PROVISO/REDLINES ON SHEETS |