2015-12-03 10:39:26 | 3RD REVIEW 2010 MECHANICAL |
| PERMIT #15031312 |
| 12/3/15 |
| |
| 1) THE REVISED AC LOAD CALCULATIONS FOR THE MITSUBISHI |
| FCU?S FOR CORRIDORS 3RD AND 5TH LEVEL INDICATE 1 TON OF |
| COOLING FOR EACH CORRIDOR, HOWEVER THE AC SCHEDULES ARE |
| INDICATING 10 TON UNITS HAVE BEEN SELECTED FOR THOSE |
| AREAS: PLEASE CLARIFY AND NOTE THAT NO O/A AIR DATA IS |
| SHOWN IN THE CALCULATIONS. |
| 2) THE ENERGY EFFICIENCY FORM 506-2010 WAS SUBMITTED |
| AGAIN WITHOUT THE COMPLIANCE CHECKLIST COMPLETED- |
| PLEASE COMPLY. |
| 3) REVISED MITSUBISHI REFRIGERANT PIPING DIAGRAM SHEET |
| 1-1: A) THE DIAGRAM INDICATES CU-R-2, BUT THE SCHEDULE |
| INDICATES CU-R-5. B)THE DIAGRAM INDICATES AC- 2-5 WHICH |
| IS NOT IN THE AC EQUIPMENT SCHEDULE. C) AC-1A-2 SHOWN |
| IN THE SCHEDULE IS NOT SHOWN IN THE DIAGRAM. |
| 4) REVISED PIPING DIAGRAM SHEET 1-2: A) CU-R-1 IS SHOWN |
| IN THE DIAGRAM/CU-R-4 IN THE SCHEDULE. B) MITSUBISHI |
| PKFY MODELS ARE SHOWN IN THE DIAGRAM/PLFY MODELS IN THE |
| SCHEDULE. |
| 5) THE REVISED PLAN INDICATES DRYER BOOSTER FANS TO BE |
| USED IN UNITS 2, 3, AND 4. PLEASE NOTE THE WEST PALM |
| BEACH FIRE DEPARTMENT PROHIBITS THE USE OF BOOSTER FANS |
| IN HIGH-RISE BUILDINGS. |
| 6) SHEET A2.1.1: PLACE A NOTE ON THE PLAN TO IDENTIFY |
| THE LOCATIONS OF THE 2HR. FIRE-RATED DUCT ENCLOSURES, |
| AND INDICATE ON WHICH SHEET THE ASSEMBLY DETAILS CAN BE |
| FOUND. |
| 7) SHEET M4.03: NOA #09-0720.01 NOTED IN THE CONDENSER |
| UNIT DETAIL IS EXPIRED. PLEASE PROVIDE A CURRENT NOA #. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 561-805-6719 |
| [email protected] |
| |
| |