2015-10-06 13:07:57PREVIOUS COMMENTS:
 1. SATISFIED.
 2. PLEASE CONSIDER THE POSIBILITY OF MOVING THE MEDIAN
 ON DIXIE HWAY PARKING OUT AS MUCH AS POSSIBLE,
 MAINTAINING TURNING RADIUS TO ACCESS GARAGE, TO PROVIDE
 A WIDER CLEAR SIDEWALK.
 3. STRUCTURAL SOIL SHALL BE INTALLED AROUND RELOCATED
 OAK TREE AND NEW TREE ON DIXIE HWAY.
 4. NOT ADDRESSED. PLANTING AREA NOT INDICATED ON
 DRAWINGS.
 5. PLEASE INDICATE THE LOCATION OF THE TILT GATE
 DETAILS TO CONFIRM REQUIRED SCREENING BY DAC.
 6. SATISFIED.
 7. DAC APPROVAL REQUIRED ENHANCED MATERIALS AT GROUND
 FLOOR. PLEASE INDICATE WHAT ARE THE PROPOSED ENHANCE
 MATERIALS ON THE GROUND.
 8. SATISFIED.
 9. SATISFIED.
 10. DISCREPANCY STILL EXISTING BETWEEN DRAWINGS.
 11. NOT SATISFIED.
 12. EASEMENTS WILL BE NECESSARY FOR ENTRANCE CANOPY,
 GARAGE TRELLIS, BALCONIES AND POOL DECK. PLEASE PREPARE
 LEGAL DESCRIPTION AND SKETCH FOR EACH OF THE ELEMENTS
 ENCROACHING INTO THE ROW. CITY COMMISSION APPROVAL
 REQUIRED.
 ADDITIONAL COMMENTS:
 13. DRAWINGS INDICATE A NEW WATER MAIN ON THE SIDEWALK.
 PLEASE VERIFY THERE IS NOT CONFLICT WITH THE PROPOSED
 STREET TREES ALONG FERN STREET ACCORDING TO THE REVISED
 DESIGN.
 14.STOP BARS FOR GARAGE EXIST SHALL BE INSIDE FRONTAGE
 LINE. ADDITIONAL STOP BARS CAN BE PLACED AT THE ROADWAY
 APPROACH IF NEEDED.
 15. CTIY COMPLETED THE DESIGN FOR THE FERN STREET
 PROJECT. PLEASE REVISE STREETSCAPE TO CONFORM TO FINAL
 CITY DESIGN.
 16. SITE PLAN SHOWS 2 IN-BOUND LANES AND 1-OUT- BOUND
 LANE ON DIXIE HWAY. ORIGINAL APPROVAL HAD 2 IN-BOUND
 LANES AND 1-OUT-BOUND. PLEASE CORRECT.
 17. DIXIE HWAY DRIVEWAY SHALL BE ADJUSTED TO PROVIDE
 ENOUGH SPACE FOR THE 2 IN-BOUND LANES. REDUCE THE
 OUT-BOUND LANE TO 10.5' TO ALLOW ADDITIONAL SPACE FOR
 IN-BOUND LANES.
 18. DECORATIVE ALUMINUM TRELLIS ABOVE GARAGE ENTRANCE
 SHALL BE LOWERED TO MEET THE AWNING HEIGHT OR CLOSE TO
 IT.
 19. A MAINTENANCE AGREEMENT WILL BE NECESSARY FOR THE
 MAINTENANCE OF ALL THE STREETSCAPE ON DIXIE HWAY AND
 FERN STREET.
 20. PLEASE INCLUDE THE FOLLOWING INFORMATION IN THE
 SITE PLAN SHEET SP1.1:
 TDR CALCULATION:
 TOTAL GSF= 293,296SF
 TOTAL GSF FLOOR 1-5 (ZONING BY RIGHT)= 84,241SF
 TOTAL GSF FLOOR 6-16 = 209,055SF
 TDRS FROM PARK (12,500SF) = 62,500SF
 ADDITIONAL TDRS NEEDED= 146,555SF
 FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA
 APONTE AT 561-822-1439.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved