2015-09-16 17:16:122ND REVIEW: FBC 2010 MECHANICAL
 PERMIT #15031312
 333 FERN ST.
  
 PLEASE REFER TO THE 1ST REVIEW COMMENTS AND THE
 SUBMITTED NARRATIVE RESPONSE.
  
 1) COMMENT #1 FROM THE 1ST REVIEW, REQUEST FOR AC
 CALCULATIONS: THE CALCULATIONS HAVE BEEN SUBMITTED
 HOWEVER, PLEASE REVIEW UPLOADED FILE TITLED "ISIS
 COMMON AREAS" I AM FINDING SOME OF THE SYSTEM TITLES ON
 THE CALCS DO NOT MATCH THE SYSTEM TITLES ON THE
 SCHEDULES I.E. AC 2-2 IS TITLED "ELEVATOR SERVICE" IN
 THE CALCS BUT LISTED AS 2ND LEVEL VESTIBULE IN THE
 SCHEDULE, AC-2-5 IN THE CALCS BUT NOT IN THE SCHEDULES.
 IN ADDITION, I AM NOT FINDING CALCULATIONS FOR RTU-1,
 AND PACU-1 & 2, AND ALL OF THE MITSUBISHI GROUND FLOOR
 SYSTEMS HAVE OVERSIZED HEATING CAPACITIES PER THE
 CALCS- REFER TO SECTION 503.2.2 FBC-10 ENERGY
 CONSERVATION.
 2) COMMENT #2 FROM THE 1ST REVIEW, REQUEST FOR ENERGY
 CALCS: ENERGY EFFICIENCY FORM 506-2010 HAS BEEN
 SUBMITTED, HOWEVER THERE ARE A FEW ISSUES CORRELATING
 THE CALCS WITH THE AC SYSTEMS: A) REFER TO SHEET M4.00
 "SPLIT AC UNIT SCHEDULE"- CU'S 4A & 5A ARE NOT IN THE
 CALCS. B) M4.00 "DUCTLESS SPLIT SYSTEM COMMON AREAS"-
 THE SCHEDULE INDICATES 2.0 TON/20.7 SEER SYSTEMS FOR
 RETAIL, HOWEVER THE CALCS INDICATE RETAIL A (40,800
 BTU'S/19 SEER) & RETAIL B (19,000 BTU'S/20 SEER). C)
 M.400 "DUCTLESS SPLIT SYSTEM COMMON AREAS"- THE COOLING
 AND HEATING CAPACITIES AND SEERS IN THE SCHEDULE DON'T
 MATCH WITH THE CALCS. D) M4.01 "SPLIT AIR CONDITIONING
 UNIT SCHEDULE"- THE COOLING AND HEATING CAPACITIES, THE
 TAG #S, THE SEERS, AND THE LOCATIONS OF THE SYSTEMS AS
 SHOWN IN THE SCHEDULE DO NOT MATCH THE CALCS. PLEASE
 REVIEW AND REVISE ACCORDINGLY, AND COMPLETE THE
 COMPLIANCE CHECKLIST ON PAGE 31- PLACE A CHECK MARK IN
 EACH APPLICABLE BOX.
 3) COMMENT #4 FROM THE 1ST REVIEW: MANUFACTURER'S
 SPECIFICATIONS FROM CARRIER AND MITSUBISHI HAVE BEEN
 UPLOADED FOR REVIEW, HOWEVER MANY OF THE SHEETS SHOWING
 PIPE DIAGRAMS ARE CUT-OFF ON THE RIGHT SIDES OF THE
 PAGES LEAVING INCOMPLETE DIAGRAMS- PLEASE CORRECT. IN
 ADDITION, THE SECOND PART OF THE COMMENT REGARDING PIPE
 PENETRATION SEALS WAS NOT ADDRESSED IN THE RESPONSE
 NARRATIVE.
 4) COMMENT #5: THE O/A CALCULATIONS FOR THE FITNESS
 CENTERS ARE NOT IN COMPLIANCE WITH TABLE 403.3.- 20 CFM
 PER PERSON/0.06 CFM PER SQ. FT. REQUIRED.
 5) COMMENT #9C: I HAVE REVIEWED SHEET E5.2.1 AND DO NOT
 SEE ANY DIRECT CORRELATION BETWEEN THE GENERATOR AND
 THE SMOKE CONTROL SYSTEM. PLEASE INDICATE WHICH OF THE
 CONNECTED METER CENTERS CONTAINS THE FAN CIRCUITRY.
 6) COMMENT #14: REFER TO SHEET M4.07 AND CORRECT THE
 NOTE SPECIFYING CO LEVEL SETPOINT AT 35PPM TO READ
 25PPM PER SECTION 404.1 FBC-10 MECHANICAL.
 7) COMMENT #15: REFER TO TABLE 403.3 FOR FITNESS CENTER
 O/A. THE TABLE INDICATES 20 CFM PER PERSON AND 0.06 PER
 SQ. FT. PLEASE REVISE THE SCHEDULE AND PLANS.
 8) COMMENT #16: PROVIDE SIZING CALCULATIONS FOR THE
 RETURN AIR PLENUM SMOKE EXHAUST SYSTEM SHOWN ON THE
 GROUND FLOOR.
 9) COMMENT #18: THE REVISED PLAN DOES NOT CLEARLY
 INDICATE THE REQUIRED 10' CLEARANCE DISTANCE FOR THE
 GENERATOR EXHAUST TO THE SWITCH GEAR ROOM AIR INTAKE.
 10) COMMENT #20: PROVIDE UL TESTED AND APPROVED
 ASSEMBLY DETAILS FOR CONSTRUCTION OF THE 2HR FIRE-RATED
 ENCLOSURE HOUSING THE POOL EQUIPMENT COMBUSTION AIR
 INTAKE.
 11) COMMENT #25: PLEASE SUBMIT MANUFACTURER'S
 SPECIFICATIONS FOR THE DRYERS, AS PREVIOUSLY REQUESTED.
 12) COMMENT #26: THE LOUVER NOA #10-0921.10 LISTED IN
 THE SCHEDULE HAS EXPIRED. PLEASE PROVIDE A CURRENT NOA
 # AND SUBMITTAL.
 13) COMMENT #27: THE REQUESTED WIND LOAD ENGINEERING
 FOR THE ROOF TOP AC UNITS AND OTHER EQUIPMENT IS
 INCOMPLETE PENDING STRUCTURAL ENGINEER'S DESIGN
 CRITERIA AND DETAILS. PLEASE REFER TO M2-9-1 AND
 PROVIDE TIE-DOWN DETAILS FOR ALL EQUIPMENT AND
 COMPONENTS INCLUDING THE RTU, PACU'S, AC CONDENSERS AND
 STANDS, THE SUPPLY AND EXHAUST DUCTWORK, THE STAIRWELL
 PRESSURIZATION FANS, FAN CURBS, LOUVERS, ETC.
 14) PROVIDE AIR DISTRIBUTION SCHEDULES INDICATING THE
 VARIOUS MAKES AND MODELS OF SUPPLY DIFFUSERS, RETURN
 AND TRANSFER GRILLS ETC. TO BE UISED IN THE COMMON
 AREAS AND THE APARTMENTS
 15) PROVIDE UL TESTED AND APPROVED ASSEMBLY DETAILS FOR
 CONSTRUCTION OF THE 2HR FIRE-RATED ENCLOSURES HOUSING
 THE STAIRWELL PRESSURIZATION DUCTS ON THE GROUND FLOOR.
 16) SMOKE CONTROL RATIONAL ANALYSIS: REFER TO THE
 SECTION ENTITLED "SYSTEM IMPLEMENTATION REQUIREMENTS"
 AND PROVIDE PRODUCT DATA SHEETS FOR THE SMOKE CONTROL
 FANS WITH REVIEW AND APPROVAL STAMPS AND SIGNATURES
 FROM THE ENGINEER OF RECORD. B) PROVIDE ON THE
 MECHANICAL PLANS AIR EQUIPMENT SCHEDULES FOR ALL
 COMPONENTS OF THE SMOKE CONTROL SYSTEM INCLUDING DUCTS,
 DIFFUSERS, RETURN GRILLS, DAMPERS ETC, SMOKE DETECTORS
 ETC. PLEASE INCLUDE NOTES FOR ITEMIZING ALL REQUIRED
 TESTING PROCEDURES AS OUTLINED IN THE RATIONAL ANALYSIS
 INCLUDING LEAK TESTING OF DUCTWORK AND DAMPERS PURSUANT
 TO THE SYSTEM REQUIREMENTS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  
  
  