Date |
Text |
2015-06-05 17:13:32 | |
| 1ST REVIEW: FBC 2010 MECHANICAL |
| PERMIT #15031312 |
| 5/29/15- 6/5/15 |
| |
| 1) PROVIDE AC COOLING AND HEATING CALCULATIONS IN |
| ACCORDANCE WITH ASHRAE OR ACCA MANUAL N- SECTION |
| 503.2.1 FBC-10 ENERGY CONSERVATION |
| |
| 2) PROVIDE ENERGY CALCULATIONS: SUBMIT TWO COPIES OF |
| EITHER FORM 502 OR 506- 2010. SEE SECTION 103.2.1 AND |
| TABLE 103.2.1 FBC-10 ENERGY CONSERVATION |
| |
| 3) SUBMIT THE FOLLOWING LIST OF MANUFACTURER'S PRODUCT |
| DATA SHEETS REQUIRED FOR A COMPLETE MECHANICAL REVIEW. |
| PLEASE NOTE THAT ALL EQUIPMENT AND SYSTEM COMPONENTS |
| INSTALLED IN BUILDING AREAS SUBJECT TO WIND PRESSURES |
| AND WIND BORNE DEBRIS WILL REQUIRE ADDITIONAL SUBMITTAL |
| OF VALID FLORIDA PRODUCT APPROVALS AND/OR MIAMI DADE |
| NOTICES OF ACCEPTANCE: |
| A) FIRE DAMPERS |
| B) FIRE/SMOKE DAMPERS |
| C) CO2 SENSORS |
| D) PACKAGED FRESH AIR AC UNITS |
| E) SPLIT SYSTEM AC UNITS (DUCTED AND DUCTLESS PER THE |
| SCHEDULES: SHEETS M4-00, M4-01). |
| F) RTU-1 |
| G) VENTILATION FANS AS LISTED IN THE SCHEDULE- |
| (M4.01A). |
| H) EXHAUST AND AIR INTAKE LOUVERS AND GRILLS |
| I) AC ROOF STANDS AND CURBS |
| J) POOL AND SPA HEATERS |
| K) DRYER AND DRYER VENTS |
| NOTE: ALL SUBMITTALS SHALL BE REVIEWED AND APPROVED BY |
| THE DESIGN PROFESSIONAL OF RECORD. |
| |
| 4) AS THE PLAN INDICATES EXTENSIVE VERTICAL REFRIGERANT |
| PIPING RUNS FROM THE EQUIPMENT ON THE LOW FLOORS TO |
| CONDENSING UNITS ON THE ROOF (SUCH AS THE FAN COIL |
| UNITS ON THE 3RD AND 5TH FLOORS) DOCUMENTATION OF |
| MAXIMUM PIPING RUNS PER EACH SYSTEM MANUFACTURER SHALL |
| BE PROVIDED. PLEASE MODIFY THE SCHEDULES TO SHOW THE |
| DATA OR PROVIDE A SEPARATE PIPING TABLE IN THE PLANS |
| INDICATING THE TYPE OF PIPING, LENGTH OF THE PIPING |
| RUN, AND THE TYPE AND AMOUNT OF REFRIGERANT IN EACH |
| SYSTEM- TABLE 1103.1 FBC-10 MECH. ADDITIONALLY, THROUGH |
| PENETRATION FIRE STOPPING DETAILS ARE REQUIRED FOR |
| PIPES RUN THROUGH RATED WALLS AND CEILINGS- PLEASE NOTE |
| SHAFT ENCLOSURES MAY BE REQUIRED SECTION 1107.2.2 |
| FBC-10 MECH. |
| |
| 5) PROVIDE VENTILATION TABLES INDICATING THE REQUIRED |
| MINIMUM VENTILATION RATES (O/A AND EXHAUST) FOR ALL |
| OCCUPIED ROOMS AND SPACES, AND SYSTEM SIZING |
| CALCULATIONS FOR ALL FANS LISTED IN THE SCHEDULE ON |
| M4.01- TABLE 403.3 FBC-10 MECHANICAL, AND ASHRAE 62.1. |
| CORRELATE THE REQUIRED O/A CFM'S WITH THE CFM AMOUNTS |
| SHOWN ON THE AC EQUIPMENT SCHEDULES. PROVIDE |
| CALCULATIONS INDICATING HOW O/A IS BEING ADEQUATELY |
| PROVIDED FOR THE ELEVATOR CARS, ELEVATOR LOBBIES AND |
| VESTIBULES THAT ARE BEING SUPPLIED BY DUCTLESS |
| MINI-SPLIT SYSTEMS. |
| |
| 6) PROVIDE SIZING CALCULATIONS FOR ALL COMPONENTS OF |
| THE SMOKE CONTROL AND EXHAUST SYSTEMS INCLUDING |
| STAIRWAY AND ELEVATOR PRESSURIZATION FANS, THE |
| ROOF-MOUNTED SMOKE EXHAUST FAN SEF-1, AND THE ELEVATOR |
| HOISTWAY RELIEF LOUVERED OPENINGS (SEE COMMENT 8 FOR |
| FURTHER SMOKE CONTROL REQUIREMENTS). CALCULATIONS ARE |
| ALSO REQUIRED FOR OTHER FANS LISTED IN THE SCHEDULE NOT |
| RELATED TO THE SMOKE CONTROL. |
| |
| 7) REFERENCE SHEET M4.07 AND M2.3.1- M2.6.1: THE SMOKE |
| CONTROL SYSTEM DESCRIPTION AND SEQUENCE OF OPERATIONS |
| OUTLINE ON M4.07 MAKES NO REFERENCES TO ZONE SYSTEMS |
| FOR THE APARTMENTS AND CORRIDORS ON THE 3RD AND 5TH |
| FLOORS, NOR ARE ANY SYSTEMS SHOWN FOR SMOKE CONTROL AND |
| STAIRWAY/ELEVATOR PRESSURIZATIONS ON THESE FLOORS. |
| PLEASE CLARIFY WHY STAIRWELL #3 IS INCLUDED IN THE |
| PRESSURIZATION FAN FLOW DIAGRAM ON M4.07. |
| |
| 8) M4.07 SEQUENCE OF OPERATIONS: PLEASE CLARIFY NOTE 2 |
| UNDER ZONES 2-14. WILL THE TYPICAL O/A FSD?S ON THE |
| FLOOR OF THE SMOKE ZONE REMAIN OPEN OR CLOSED AT THE |
| CORRIDOR, AND AT THE AC CLOSETS |
| |
| 9) THE DESIGN PROFESSIONAL OF RECORD SHALL SUBMIT A |
| RATIONAL ANALYSIS FOR THE PROPOSED SMOKE CONTROL SYSTEM |
| IN COMPLIANCE WITH 513 FBC-10 MECHANICAL. PLEASE REVIEW |
| AND COMPLY THE FOLLOWING SECTIONS: |
| |
| 513.2 GENERAL DESIGN REQUIREMENTS. |
| BUILDINGS, STRUCTURES, OR PARTS THEREOF REQUIRED BY |
| THIS CODE TO HAVE A SMOKE CONTROL SYSTEM OR SYSTEMS |
| SHALL HAVE SUCH SYSTEMS DESIGNED IN ACCORDANCE WITH THE |
| APPLICABLE REQUIREMENTS OF SECTION 909 OF THE FLORIDA |
| BUILDING CODE, BUILDING AND THE GENERALLY ACCEPTED AND |
| WELL-ESTABLISHED PRINCIPLES OF ENGINEERING RELEVANT TO |
| THE DESIGN. THE CONSTRUCTION DOCUMENTS SHALL INCLUDE |
| SUFFICIENT INFORMATION AND DETAIL TO DESCRIBE |
| ADEQUATELY THE ELEMENTS OF THE DESIGN NECESSARY FOR THE |
| PROPER IMPLEMENTATION OF THE SMOKE CONTROL SYSTEMS. |
| THESE DOCUMENTS SHALL BE ACCOMPANIED WITH SUFFICIENT |
| INFORMATION AND ANALYSIS TO DEMONSTRATE COMPLIANCE WITH |
| THESE PROVISIONS |
| |
| 513.3 SPECIAL INSPECTION AND TEST REQUIREMENTS. |
| IN ADDITION TO THE ORDINARY INSPECTION AND TEST |
| REQUIREMENTS WHICH BUILDINGS, STRUCTURES AND PARTS |
| THEREOF ARE REQUIRED TO UNDERGO, SMOKE CONTROL SYSTEMS |
| SUBJECT TO THE PROVISIONS OF SECTION 909 OF THE FLORIDA |
| BUILDING CODE, BUILDING SHALL UNDERGO SPECIAL |
| INSPECTIONS AND TESTS SUFFICIENT TO VERIFY THE PROPER |
| COMMISSIONING OF THE SMOKE CONTROL DESIGN IN ITS FINAL |
| INSTALLED CONDITION. THE DESIGN SUBMISSION ACCOMPANYING |
| THE CONSTRUCTION DOCUMENTS SHALL CLEARLY DETAIL |
| PROCEDURES AND METHODS TO BE USED AND THE ITEMS SUBJECT |
| TO SUCH INSPECTIONS AND TESTS. SUCH COMMISSIONING SHALL |
| BE IN ACCORDANCE WITH GENERALLY ACCEPTED ENGINEERING |
| PRACTICE AND, WHERE POSSIBLE, BASED ON PUBLISHED |
| STANDARDS FOR THE PARTICULAR TESTING INVOLVED. THE |
| SPECIAL INSPECTIONS AND TESTS REQUIRED BY THIS SECTION |
| SHALL BE CONDUCTED UNDER THE SAME TERMS AS FOUND IN |
| SECTION 909.18 OF THE FLORIDA BUILDING CODE, BUILDING. |
| |
| 513.4 ANALYSIS. |
| A RATIONAL ANALYSIS SUPPORTING THE TYPES OF SMOKE |
| CONTROL SYSTEMS TO BE EMPLOYED, THEIR METHODS OF |
| OPERATION, THE SYSTEMS SUPPORTING THEM AND THE METHODS |
| OF CONSTRUCTION TO BE UTILIZED SHALL ACCOMPANY THE |
| SUBMITTED CONSTRUCTION DOCUMENTS AND SHALL INCLUDE, BUT |
| NOT BE LIMITED TO, THE ITEMS INDICATED IN SECTIONS |
| 513.4.1 THROUGH 513.4.6. |
| 513.4.1 STACK EFFECT. |
| THE SYSTEM SHALL BE DESIGNED SUCH THAT THE MAXIMUM |
| PROBABLE NORMAL OR REVERSE STACK EFFECTS WILL NOT |
| ADVERSELY INTERFERE WITH THE SYSTEM?S CAPABILITIES. IN |
| DETERMINING THE MAXIMUM PROBABLE STACK EFFECTS, |
| ALTITUDE, ELEVATION, WEATHER HISTORY AND INTERIOR |
| TEMPERATURES SHALL BE USED. |
| 513.4.2 TEMPERATURE EFFECT OF FIRE. |
| BUOYANCY AND EXPANSION CAUSED BY THE DESIGN FIRE IN |
| ACCORDANCE WITH SECTION 513.9 SHALL BE ANALYZED. THE |
| SYSTEM SHALL BE DESIGNED SUCH THAT THESE EFFECTS DO NOT |
| ADVERSELY INTERFERE WITH ITS CAPABILITIES. |
| 513.4.3 WIND EFFECT. |
| THE DESIGN SHALL CONSIDER THE ADVERSE EFFECTS OF WIND. |
| SUCH CONSIDERATION SHALL BE CONSISTENT WITH THE |
| WIND-LOADING PROVISIONS OF THE FLORIDA BUILDING CODE, |
| BUILDING. |
| 513.4.4 HVAC SYSTEMS. |
| THE DESIGN SHALL CONSIDER THE EFFECTS OF THE HEATING, |
| VENTILATING AND AIR-CONDITIONING (HVAC) SYSTEMS ON BOTH |
| SMOKE AND FIRE TRANSPORT. THE ANALYSIS SHALL INCLUDE |
| ALL PERMUTATIONS OF SYSTEMS? STATUS. THE DESIGN SHALL |
| CONSIDER THE EFFECTS OF FIRE ON THE HVAC SYSTEMS. |
| 513.4.5 CLIMATE. |
| THE DESIGN SHALL CONSIDER THE EFFECTS OF LOW |
| TEMPERATURES ON SYSTEMS, PROPERTY AND OCCUPANTS. AIR |
| INLETS AND EXHAUSTS SHALL BE LOCATED SO AS TO PREVENT |
| SNOW OR ICE BLOCKAGE. |
| 513.4.6 DURATION OF OPERATION. |
| ALL PORTIONS OF ACTIVE OR PASSIVE SMOKE CONTROL SYSTEMS |
| SHALL BE CAPABLE OF CONTINUED OPERATION AFTER DETECTION |
| OF THE FIRE EVENT FOR A PERIOD OF NOT LESS THAN EITHER |
| 20 MINUTES OR 1.5 TIMES THE CALCULATED EGRESS TIME, |
| WHICHEVER IS LESS. |
| |
| 9A) THE DESIGN PROFESSIONAL SHALL PROVIDE EVIDENCE AND |
| DOCUMENTATION VERIFYING COMPLIANCE WITH SECTION 513.6.1 |
| MINIMUM PRESSURE DIFFERENCE ACROSS SMOKE BARRIERS, AND |
| 513.6.2 MAXIMUM PRESSURE DIFFERENCE ACROSS A SMOKE |
| BARRIER BY REQUIRED DOOR-OPENING OR CLOSING FORCES. |
| |
| 9B) THE DESIGN PROFESSIONAL SHALL REVIEW AND APPROVE |
| ALL EQUIPMENT AND COMPONENTS OF THE SMOKE CONTROL |
| SYSTEM INCLUDING FANS, DUCTS, AUTOMATIC FIRE AND SMOKE |
| DAMPERS AND BALANCING DAMPERS PER SECTION 513.10 FBC-10 |
| MECHANICAL INCLUSIVE OF ALL SUB-SECTIONS. |
| |
| 9C) THE DESIGN PROFESSIONAL SHALL PROVIDE EVIDENCE OF |
| COMPLIANCE WITH SECTION 513.11 FOR TWO SOURCES OF POWER |
| FOR THE SYSTEM INCLUDING A SECONDARY MEANS BY AN |
| APPROVED STANDBY SOURCE, AND MAXIMUM AUTO TRANSFER TIME |
| OF 60 SECONDS TO FULL STANDBY POWER FROM PRIMARY |
| FAILURE TIME. |
| |
| 10) PROVIDE EQUIPMENT SCHEDULES FOR THE FIRE AND |
| FIRE/SMOKE DAMPERS INCLUDING MAKES AND MODELS, UL |
| LISTINGS, FIRE-RESISTANCE HOURLY RATINGS, AND LIST |
| THEIR PROPOSED INSTALLATION LOCATIONS IN THE BUILDING, |
| AND HOW THEY WILL BE ACTUATE- BY FUSIBLE LINK OR |
| CONNECTION TO THE SMOKE CONTROL SYSTEM ETC. |
| |
| 11) PROVIDE TYPICAL INSTALLATION DETAILS FOR THE |
| DAMPERS INCLUDING ACCESS PANEL LOCATIONS. |
| |
| 12) PROVIDE UL TESTED AND APPROVED THROUGH-PENETRATION |
| FIRE STOPPING ASSEMBLIES FOR THE REFRIGERANT PIPING, |
| AND AC DUCTS PENETRATING THE VARIOUS RATED WALLS AND |
| FLOOR CEILING ASSEMBLIES. |
| |
| 13) SHEET M2-1.1: THE OUTSIDE AIR (O/A) INTAKE INLET |
| FOR AC-F IN THE GROUND FLOOR GARAGE/STORAGE WALL IS |
| WITHIN THE 10 FT. ALLOWABLE HORIZONTAL DISTANCE TO THE |
| DRIVE AREA: PLEASE CORRECT PER SECTION 401.4 FBC-10 |
| MECH. |
| |
| 14) M2.1.1- M2.6.1: GROUND FLOOR TO 6TH FLOOR GARAGES: |
| PROVIDE A SEQUENCE OF OPERATION DIAGRAM FOR THE CO |
| ACTUATED EXHAUST SYSTEMS. PROVIDE INSTALLATION DETAILS |
| FOR THE SENSORS INCLUDING MOUNTING HEIGHT AFF, AND |
| MAXIMUM SPACING. SUBMIT MANUFACTURER?S PRODUCT DATA |
| SHEETS REVIEWED AND APPROVED BY THE DESIGN PROFESSIONAL |
| OF RECORD- SEE SECTIONS 404.1 AND 404.2 FBC-10 MECH. |
| PLEASE NOTE THAT CONTINUOUS VENTILATION IS REQUIRED |
| UNLESS THE FANS WILL OPERATE AUTOMATICALLY UPON |
| DETECTION OF A CONCENTRATION OF CARBON MONOXIDE OF 25 |
| PARTS PER MILLION. |
| |
| 15) M2.1.1- M2.6.1- POSITIVE PRESSURE AND MINIMUM O/A |
| VENTILATION MUST BE MAINTAINED FOR THE VARIOUS ELEVATOR |
| LOBBIES, VESTIBULES, ETC. THAT ARE CONNECTING AT THE |
| CENTER OF THE PARKING GARAGES PER SECTION 404.3. HOW |
| WILL THIS BE ACCOMPLISHED? THE CURRENT PLAN DOES NOT |
| INDICATE ANY O/A DUCTS BRINGING FRESH AIR INTO THESE |
| SPACES. |
| |
| 16) M2.1.1: DUCT SMOKE DETECTORS ARE REQUIRED IN THE |
| SUPPLY AND RETURN AIR SYSTEMS OF AC-D & AC-E (FITNESS |
| CENTER)- SECTION 606.2.2. PLEASE NOTE THAT ALTHOUGH |
| AREA SMOKE DETECTORS ARE SHOWN IN THE CENTER ON |
| FA2.1.1, THERE ARE NO NOTES ON FA1.00 PERTAINING TO FAN |
| SHUT DOWN OF THE UNITS. |
| |
| 17) M2.1.1: RETURN AIR TRANSFERS FROM THE CONFERENCE |
| AND WORK ROOMS INTO THE CORRIDORS ARE PROHIBITED PER |
| SECTION 601.2. PROVIDE DUCTED RETURNS. |
| |
| 18) M2.1.1: INDICATE THE CLEARANCE DISTANCES FOR THE |
| GENERATOR EXHAUST OUTLET AND EF-1-4 TO THE SUPPLY FAN |
| INLET SERVING THE SWITCHGEAR ROOM, TO THE PUMP ROOM AIR |
| INLET OPENINGS, AND TO THE PUBLIC WALKWAY. |
| |
| 19) M2.3.1 & M2.5.1: IN REFERENCE TO THE NOTE REGARDING |
| THE 6"X4" DUCT PENETRATING THE RATED CORRIDOR, PROVIDE |
| EVIDENCE THAT THE MATERIAL USED TO FILL THE ANNULAR |
| SPACE AROUND THE DUCT PENETRATION MEETS THE ASTM E 119 |
| OR UL 263 FOR PREVENTION OF PASSAGE OF FLAME AND HOT |
| GASES PER SECTION 713.3.1 FBC-10 BUILDING. |
| |
| 20) M2.6.1: A) CLARIFY IF THE COMBUSTION AIR |
| CALCULATIONS INCLUDE BOTH THE SPA AND POOL HEATERS, AND |
| SUBMIT MANUFACTURER?S SPECIFICATIONS FOR EACH UNIT, THE |
| INDUCTION FAN, AND VENT PIPING. B) PROVIDE ENLARGED |
| FRONT AND PLAN VIEW DRAWINGS OF THE EQUIPMENT ROOM |
| INDICATING CLEARANCE DISTANCES AROUND THE EQUIPMENT AND |
| ASSOCIATED POOL AND GAS PIPING, CONTROLS ETC. FOR |
| SERVICE ACCESS. C) PROVIDE A VENTING DIAGRAM PER |
| MANUFACTURER?S RECOMMENDATIONS. THE DIAGRAM SHALL |
| INDICATE THE TYPE AND SIZE OF VENT PIPING, LENGTH OF |
| CONNECTORS, HEIGHT OF THE RISER, TOTAL RISE AND RUN OF |
| THE FLUE, AND METHOD OF HANGING AND SUPPORT OF THE |
| PIPING.- SEE SECTION 503.6, 504 FBC-10 FUEL. D) PROVIDE |
| A FIRE DAMPER AND THROUGH PENETRATION FIRE STOPPING FOR |
| THE VENT PIPE PENETRATING THE FIRE-RATED WALL. PLEASE |
| NOTE ALL SUBMITTALS SHALL BE REVIEWED AND APPROVED BY |
| THE DESIGN PROFESSIONAL OF RECORD. |
| |
| 21) M2.6.1) A VESTIBULE PROVIDING A TWO DOORWAY |
| SEPARATION IS REQUIRED FOR THE CONNECTION OF THE POOL |
| AND SPA HEATER ROOM TO THE ADJACENT GARAGE- SECTION |
| 305.3.2 FBC-10 FUEL GAS. CORRECT THE PLANS OR PROVIDE |
| DOCUMENTATION VERIFYING THE HEATERS HAVE IGNITION |
| SOURCES ELEVATED HIGHER THAN18 INCHES ABOVE THE FLOOR- |
| SECTION 305.3. |
| |
| 22) M2.6.1: THE LOCATION OF THE COMBUSTION AIR INTAKES |
| ADJACENT TO GARAGE PARKING SPACES IS NOT PERMITTED PER |
| SECTION 304.12 FBC-10 FUEL GAS. PLEASE PROVIDE |
| COMBUSTION AIR FROM THE OUTDOORS. |
| |
| 23) M2.4.1 & M2.6.1: AUTOMATIC SHUT OFF DAMPERS ARE |
| REQUIRED FOR THE O/A INTAKES FOR FCU-1 AND FCU-2 PER |
| SECTION 503.2.4.4 FBC-10 ENERGY CONSERVATION. |
| |
| 24) M2.7.1: CLARIFY THE PURPOSE OF THE INLINE CORROSIVE |
| RESISTANT FAN IN THE CORRIDOR CLOSET AND HOW IT WILL BE |
| ACTIVATED. SUBMIT REVIEWED AND APPROVED SPECIFICATIONS, |
| AND PROVIDE A UL APPROVED THROUGH-PENETRATION FIRE |
| STOPPING DETAIL AND DETAILS FOR HANGING AND SUPPORTING |
| THE EXHAUST DUCT. |
| |
| 25) ALL RESIDENTIAL UNITS 3RD 5TH, 7TH, & 8TH- 20TH: A) |
| PROVIDE INSTALLATION DETAILS FOR THE AIR HANDLERS IN |
| THE SHOWING REQUIRED CLEARANCES INSIDE THE CLOSET PER |
| SECTION 603.1.3, AND PRIMARY AND SECONDARY CONDENSATE |
| DISPOSAL DETAILS- SECTION 307.2.1 & 307.2.3 FBC-10 |
| MECH., AND CONNECTION OF THE SUPPLY AND RETURN PLENUMS. |
| B) PROVIDE A DETAIL FOR SUPPORT OF THE REFRIGERANT |
| PIPING IN THE CLOSETS AND INDICATE THE TYPE AND |
| THICKNESS OF THE PIPING INSULATION- PLEASE NOTE THE |
| PIPING INSULATION SHALL BE PLENUM-RATED AND APPROVED BY |
| THE DESIGN PROFESSIONAL PER SECTION 602.2.1. C) |
| REFERENCE FIRESTOPPING DETAIL PER PREVIOUS COMMENT # |
| 12. B) IN REFERENCE TO NOTE #5 SUBMIT MANUFACTURER'S |
| SPECIFICATIONS FOR THE DRYER REVIEWED AND APPROVED. |
| |
| 26) PROVIDE AN EQUIPMENT SCHEDULE FOR ALL THE VARIOUS |
| EXTERIOR EXHAUST AND AIR INTAKE LOUVERS AND GRILLS. |
| LIST THE MAKES AND MODELS, TYPES AND SIZES, AND INSTALL |
| LOCATIONS. |
| |
| 27) MECHANICAL ROOF: PROVIDE WIND LOAD ENGINEERED |
| DETAILS FOR TIE-DOWN OF THE ALL THE EQUIPMENT AND |
| COMPONENTS INDICATED ON THE PLAN: CONDENSERS, AND |
| CONDENSER RACKS, PACKAGE UNITS AND CURBS, SUPPLY AND |
| EXHAUST FANS AND CURBS, REFRIGERATION PIPING RACKS AND |
| STANDS ETC. INCLUDE SECTION CUTS SHOWING ATTACHMENT |
| DETAILS, AND REQUIRED ROOF CLEARANCES FOR THE RACKS, |
| AND CURB HEIGHTS. |
| |
| 28) INDICATE HOW THE REFRIGERATION PIPING AND PIPING |
| INSULATIONS WILL BE PROTECTED FROM WEATHER AND UV |
| DAMAGE. |
| |
| |
| CHRISTOPHER COLE |
| MECHANICAL PLANS EXAMINER |
| 561-805-6719 |
| [email protected] |
| |
| |
| |
| |
| |
| |
| |
| |
| |