Date |
Text |
2015-04-03 06:06:17 | 1) THE WASHERS AND DRYERS SHALL COMPLY WITH THE FL. |
| ACCESSIBILITY CODE SECS. 611.3 FOR THE LOCATION OF |
| OPERABLE PARTS OF THE MACINES AND 611.4 FOR THE HEIGHT |
| REQUIREMENTS FOR MACHINE DOORS FOR THE TOP LOADING AND |
| FRONT LOADING MACHINES.SHOW ALL THE DIMENSIONS ON THE |
| PLANS. |
| 2) THE PLANS SHOW 3 NEW DRYERS. ACTUALLY ALL THE |
| EXISTING DRYERS HAVE BEEN REPLACED.INDICATE THIS ON THE |
| PLANS. IDENTIFY ALL DRYERS ON THE PLANS AND NOTE THAT |
| THEY ARE BEING REPLACED. WPB AMEND. TO 2010 FBC |
| SEC.107.2.1. |
| 3) SHT. A-2 ELEVATION B-B DOES NOT CORRELATE WITH A-1. |
| SHOW THE ALCOVE (NEW DRYER AREA) WALLS, ETC. |
| 4) NOTE ON THE PLAN IF THE EXISTING TOILET ROOM IS |
| UNDERGOING ANY ALTERATION. IF SO, IT SHALL COMPLY |
| W/2010 FL. ACCESSIBILITY CODE. |
| 5) THE PLAN SHOWS MOST OF THE DRAINAGE PIPING AND WATER |
| PIPING AS EXISTING. ACTUALLY, MOST OF THIS PIPING WAS |
| REMOVED WITHOUT PERMITS. THE PLANS SHALL CLARLY REFLECT |
| THE ENTIRE SCOPE OF WORK TO BE DONE AND EXACTLY WHAT IS |
| NEW PIPING TO BE INSTALLED.WPB AMEND. TO 2010 FBC |
| SEC.107.2.1. |
| 6) THE SANITARY RISER SHOWS 5" DRAINAGE PIPE. THIS IS |
| AN ODD SIZE PIPE. CLARIFY. |
| 7) THE WAY THE SANITARY RISER IS DESIGNED AND DRAWN IS |
| EXTREMELY CONFUSING AND IS NOT CODE COMPLIANT.SUBMIT A |
| SANITARY RISER THAT CLEARLY REFLECTS THE INSTALLATION. |
| SIZE ALL VENTS, STANDPIPES, AND ALL SECTIONS OF THE |
| HORIZONTAL DRAIN. INDICATE THE PITCH OF THE SANITARY |
| LINES. SOME SANITARY LINES ARE SHOWN AS 2 3/8". THIS IS |
| NOT A STANDARD SIZE.WPB AMEND. TO 2010 FBC SEC. |
| 107.3.5.1.3. |
| 8) CLEANOUTS ARE REQUIRED IN THE BASE OF ALL STACKS PER |
| FPC SEC.708.3.4 AND AT EACH CHANGE OF DIRECTION GREATER |
| THAN 45 DEGREES .FPC SEC.708.3.3. |
| 9) THE SANITARY RISER SHOWS A 5" LINE CONNECTING INTO |
| ANOTHER 5" LINE. CLARIFY. |
| 10) SIZE ALL SECTIONS OF THE WATER AND SANITARY RISERS |
| WHEN THEY ARE RESUBMITTED. |
| 11) THE HOT WATER LINE ON THE RISER CONNECTS TO |
| NOTHING. THE DROP IS NOT CONNECTED TO ANYTHING. |
| 12) SHOW ON THE PLANS HOW THE WATER AND DRAINAGE LINES |
| WILL BE SUPPORTED. SUPPORT SPACING SHALL COMPLY WITH |
| TABLE 308.5 OF THE 2010 FPC. |
| 13) INDICATE THE TYPE OF PIPE MATERIAL FOR THE WATER |
| AND DRAINAGE LINES. WPB AMEND.TO 2010 FPC SEC.107.2.1. |
| 140 SUBMIT MANUF. SPECIFICATION SHEETS FOR THE WASHERS. |
| WASHERS SHALL COMPLY W/ ASSE 1007. |
| |
| GAS |
| 14) SIZE ALL THE NEW AND EXISTING GAS PIPING AND |
| VENTS.WPB AMEND. TO 2010 FBC SEC.107.2.1. |
| 15) INDICATE THE TOTAL DEVELOPED LENGTH OF THE GAS |
| PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE |
| GAS OUTLET.INDICATE THE PSI OF THE GAS SYSTEM,THE TYPE |
| OF PIPE BEING INSTALLED, AND THE TOTAL LOAD OF THE |
| SYSTEM. |
| 16) INDICATE THE GAS SIZING TABLE THAT IS BEING USED TO |
| SIZE THE SYSTEM.INDICATE ON THE PLAN IF THE GAS IS LP |
| OR NATURAL GAS. |
| 17) INDICATE ON THE PLAN IF THE DRYERS ARE STACKED |
| DRYERS. IF SO, THE GAS RISER SHALL SHOW THE GAS |
| CONNECTIONS TO ALL DRYERS. |
| 18) SUBMIT MANUF. SPECIFICATION SHEETS FOR THE GAS |
| DRYERS. DRYERS SHALL BE LISTED AND LABELED PER THE 2010 |
| FGC SEC. 301.3. |
| 19) SUBMIT CALCULATIONS FOR COMBUSTION AIR FOR ALL GAS |
| APPLIANCES PER 2010 FGC SEC. 304.1. |
| 20) SUBMIT DETAILS FOR THE GAS VENTS. INDICATE TYPE OF |
| VENT, SIZE OF VENT, BTU LOAD ON THE VENT. |
| 22) THERE WERE A NUMBER OF EXISTING GAS VALVES THAT |
| WERE NOT CONNECTED TO AN APPLIANCE. ANY GAS VALVES NOT |
| CONNECTED TO AN APPLIANCE SHALL BE EQUIPPED WITH A |
| VALVE AND CAPPED.INDICATE THESE ON THE GAS RISER. |
| 230 THE GAS PIPING SHALL BE PROPERLY BONDED PER THE |
| 2010 FGC SEC.310.1. |
| A THOROUGH REVIEW COULD NOT BE DONE DUE TO THE LACK OF |
| INFORMATION ON THE DRAWINGS. ADDITIONAL COMMENTS MAY BE |
| GENERATED UPON THE RE-REVIEW OF THE DOCUMENTS. |
| |
| PLUMBING PLAN REVIEW |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| 561-805-6692 |
| [email protected] |
| |
| |
| |
| |
| |
| |
| |
| |
| |