2015-12-02 13:11:46 | 1ST REVIEW 2010 MECHANICAL |
| PERMIT #15030795 |
| 12/2/15 |
| |
| 1 ) COMMENT #2 FROM THE 1ST REVIEW WILL STAND BASED ON |
| THE REVISED DRAWING INDICATING THE ADDITION OF AN |
| ENCLOSED PARKING GARAGE ATTACHED TO THE CARPENTRY |
| BUILDING. PLEASE REFER TO SECTION 406.3, 406.3.3.1, AND |
| 406.4.2 FBC-10 BUILDING. SECTION 406.3.3.1: "FOR |
| NATURAL VENTILATION PURPOSES, THE EXTERIOR SIDE OF THE |
| STRUCTURE SHALL HAVE UNIFORMLY DISTRIBUTED OPENINGS ON |
| TWO OR MORE SIDES. THE AREA OF SUCH OPENINGS IN |
| EXTERIOR WALLS ON A TIER SHALL BE NOT LESS THAN 20 |
| PERCENT OF THE TOTAL PERIMETER WALL AREA OF EACH TIER. |
| THE AGGREGATE LENGTH OF THE OPENINGS CONSIDERED TO BE |
| PROVIDING NATURAL VENTILATION SHALL BE NOT LESS THAN 40 |
| PERCENT OF THE PERIMETER OF THE TIER. INTERIOR WALLS |
| SHALL BE NOT LESS THAN 20 PERCENT OPEN WITH UNIFORMLY |
| DISTRIBUTED OPENINGS." PER THE CODE SECTIONS LISTED |
| ABOVE, THE BUILDING IS DEFINED AS AN "ENCLOSED GARAGE". |
| I HAVE REPRINTED COMMENT #2 FROM THE 1ST REVIEW BELOW. |
| 2) IN REFERENCE TO NEW PARKING GARAGES PLEASE REVIEW |
| SECTION 404.1 FBC-10 MECHANICAL, AND PROVIDE CONTINUOUS |
| MECHANICAL VENTILATION OR A VENTILATION SYSTEM DESIGNED |
| TO OPERATE AUTOMATICALLY UPON DETECTION OF A |
| CONCENTRATION OF CARBON MONOXIDE OF 25 PARTS PER |
| MILLION (25 PPM) BY APPROVED AUTOMATIC DETECTION |
| DEVICES (CO DETECTORS). PLEASE NOTE THAT AUTO OPERATION |
| OF THE SYSTEM SHALL NOT REDUCE THE VENTILATION AIRFLOW |
| RATE BELOW 0.05 CFM PER SQ. FT. OF THE FLOOR AREA AND |
| THE SYSTEM SHALL BE CAPABLE OF PRODUCING A VENTILATION |
| AIRFLOW OF 0.75 CFM PER SQ. FT. OF FLOOR AREA. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 561-805-6719 |
| [email protected] |
| |
| |