Plan Review Notes
Plan Review Notes For Permit 15030505
Permit Number 15030505
Review Stop ENG
Sequence Number 1
Notes
Date Text
2015-04-13 10:46:36SPECIAL CONDITIONS FOR DEMOLITION PERMIT # 15030505
  
 1. CONTRACTORS, SUBCONTRACTORS AND PERSONS HOLDING
 PERMITS TO PERFORM LAND DISTURBING CONSTRUCTION OR LAND
 DEVELOPMENT ACTIVITIES, AND THE LANDOWNERS OF
 CONSTRUCTION SITES SHALL CAUSE THE CONSTRUCTION SITE TO
 BE MAINTAINED IN A NEAT AND ORDERLY CONDITION THAT IS
 FREE FROM ANY DEBRIS, GARBAGE, JUNK, USED OR DISCARDED
 CONSTRUCTION MATERIALS, TRASH OR ANY OTHER FOREIGN
 SUBSTANCE PRODUCED AS A RESULT OF THE LAND DISTURBING
 CONSTRUCTION OR LAND DEVELOPMENT ACTIVITIES, OTHER THAN
 DEBRIS, GARBAGE, JUNK, TRASH OR OTHER FOREIGN SUBSTANCE
 DEPOSITED INTO AND CONTAINED WITHIN A TRASH RECEPTACLE
 OR TRASH DUMPSTER.
  
 2. IN ALL INSTANCES WHERE A BUILDING PERMIT HAS NOT
 BEEN ISSUED WITHIN THREE MONTHS OF THE COMPLETION OR
 ABANDONMENT OF LAND DISTURBING CONSTRUCTION ACTIVITIES,
 THE JOB SITE SHALL, WITHIN 30 DAYS AFTER THE EXPIRATION
 OF SUCH THREE-MONTH PERIOD, BE BROUGHT TO GRADE,
 TILLED, PLANTED AND MAINTAINED WITH GROUND COVER TO
 INCLUDE SODDING OR SEEDING WHICH SHALL HAVE IRRIGATION.
 ANY TEMPORARY CONSTRUCTION FENCE SHALL ALSO BE REMOVED.
 THE CONSTRUCTION SERVICES DIRECTOR OR DESIGNEE, WITH
 INPUT FROM THE PLANNING DIRECTOR OR DESIGNEE, MAY
 GRANT, IN WRITING, AN EXTENSION TO THE TIME FRAME FOR
 THE ISSUANCE OF A BUILDING PERMIT, UNDER THIS
 PARAGRAPH, WHEN THE LANDOWNER HAS DEMONSTRATED A GOOD
 FAITH EFFORT IN PURSUING THE BUILDING PERMIT BUT THAT
 CIRCUMSTANCES BEYOND THE CONTROL OF THE CONTRACTOR
 AND/OR PERMITTEE HAVE OCCURRED.
  
 3. ALL CONSTRUCTION WASTE AND DEBRIS FROM NEW
 CONSTRUCTION OR MAJOR ALTERATION OR REPAIR SHALL BE
 KEPT IN AN ENCLOSED CONTAINER TO MINIMIZE DEBRIS FROM
 LITTERING ADJACENT PROPERTIES AND PUBLIC RIGHTS-OF-WAY.
 THE PERMITTEE, CONTRACTOR OR LANDOWNER SHALL CAUSE SUCH
 WASTE OR DEBRIS TO BE REMOVED WEEKLY IN ACCORDANCE WITH
 SECTION 74-2 OF THE CITY OF WEST PALM BEACH CODE OF
 ORDINANCES.
  
 4. ALL MUD OR DEBRIS SHALL BE CONTINUALLY REMOVED FROM
 THE PUBLIC SIDEWALKS AND STREETS.
  
 5. CONTRACTORS, SUBCONTRACTORS, PERSONS HOLDING PERMITS
 TO PERFORM LAND DISTURBING CONSTRUCTION AND LAND
 DEVELOPMENT ACTIVITIES AND THE LANDOWNERS OF
 CONSTRUCTION SITES SHALL, AT THE DIRECTION OF THE
 ENGINEERING SERVICES DIRECTOR OR DESIGNEE, EITHER
 REPAIR, OR REIMBURSE THE CITY FOR ITS COSTS INCURRED TO
 REPAIR, ANY DAMAGE TO ANY PUBLIC RIGHT-OF-WAY THAT IS
 CAUSED BY ANY CONSTRUCTION VEHICLE INVOLVED IN THE LAND
 DISTURBING CONSTRUCTION OR LAND DEVELOPMENT ACTIVITIES.
  
 6. IN THE EVENT THAT THE DEMOLITION PERMIT OR BUILDING
 PERMIT EXPIRES, ALL MATERIALS AND EQUIPMENT RELATED TO
 THE LAND DISTURBING CONSTRUCTION OR LAND DEVELOPMENT
 ACTIVITIES SHALL BE REMOVED FROM THE JOB SITE WITHIN
 TEN DAYS OF THE PERMIT EXPIRATION DATE. THE JOB SITE
 SHALL, WITHIN 30 DAYS THEREAFTER, BE BROUGHT TO GRADE,
 BE TILLED AND PLANTED WITH GROUND COVER TO INCLUDE
 SODDING OR SEEDING WHICH SHALL HAVE IRRIGATION. SAID
 GROUND COVER SHALL BE MAINTAINED IN ACCORDANCE WITH
 SUBSECTIONS 74-2(C) AND SECTION 94-446 OF THIS CODE.
  
 7. DEMOLITION CONTRACTOR WILL BE RESPONSIBLE FOR
 DEVELOPING AND IMPLEMENTING A SITE SPECIFIC STORMWATER
 POLLUTION PREVENTION PLAN (SWPPP).
  
 8. THE DEMOLITION CONTRACTOR IS RESPONSIBLE FOR
 INSTALLATION OF APPROPRIATE EROSION AND SEDIMENT
 CONTROL MEASURES.
  
 9. EXISTING UTILITIES (WATER, SANITARY, STORMWATER,
 GAS, ELECTRIC, ETC.) WILL BE CAPPED OR REMOVED PRIOR TO
 THE START OF ANY OTHER DEMOLITION ACTIVITIES.
  
 10. PRIOR TO THE START OF ANY DEMOLITION ACTIVITIES, A
 DOUBLE ROW OF SILT FENCING WILL BE INSTALLED AT THE
 BETWEEN THE SITE AND ANY ADJACENT BODIES OF WATER.
 WHERE POSSIBLE, A SINGLE ROW OF SILT FENCE WILL BE
 INSTALLED AROUND THE PERIMETER OF THE REMAINDER OF THE
 CONSTRUCTION AREA. ADJACENT STORMWATER CATCH BASINS AND
 INLETS WILL BE PROTECTED BY COVERING WITH SILT FENCE
 MATERIAL OR
 11. DUST CONTROL MEASURES WILL BE IMPLEMENTED BY
 DEMOLITION CONTRACTOR AS NEEDED TO SUPPRESS DUST LEVELS
 TO BELOW THOSE LISTED IN 29 CFR 1926.55.
  
 12. ALL WASTE/DEBRIS LEAVING THE SITE WILL BE IN CLOSED
 OR COVERED CONTAINERS.
  
 13. DEMOLITION CONTRACTOR WILL UTILIZE GOOD
 CONSTRUCTION MANAGEMENT TECHNIQUES TO CONTAIN ALL
 STORMWATER RUNOFF WHICH HAS COME INTO CONTACT WITH
 CONSTRUCTION DEBRIS. DEMOLITION CONTRATOR?S PERSONNEL
 WILL INSPECT THE PERIMETER OF THE CONSTRUCTION AREA
 DAILY TO ENSURE THAT SEDIMENT LADEN WATER DOES NOT
 LEAVE THE SITE.
  
 14. REFER TO POLLUTION CONTROL - BEST PRACTICES DETAILS
 ON HTTP://WPB.ORG/ENGINEERING/ENGINEERING-SERVICES/ENGI
 NEERING-STANDARDS/
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  