Date |
Text |
2015-04-13 10:46:36 | SPECIAL CONDITIONS FOR DEMOLITION PERMIT # 15030505 |
| |
| 1. CONTRACTORS, SUBCONTRACTORS AND PERSONS HOLDING |
| PERMITS TO PERFORM LAND DISTURBING CONSTRUCTION OR LAND |
| DEVELOPMENT ACTIVITIES, AND THE LANDOWNERS OF |
| CONSTRUCTION SITES SHALL CAUSE THE CONSTRUCTION SITE TO |
| BE MAINTAINED IN A NEAT AND ORDERLY CONDITION THAT IS |
| FREE FROM ANY DEBRIS, GARBAGE, JUNK, USED OR DISCARDED |
| CONSTRUCTION MATERIALS, TRASH OR ANY OTHER FOREIGN |
| SUBSTANCE PRODUCED AS A RESULT OF THE LAND DISTURBING |
| CONSTRUCTION OR LAND DEVELOPMENT ACTIVITIES, OTHER THAN |
| DEBRIS, GARBAGE, JUNK, TRASH OR OTHER FOREIGN SUBSTANCE |
| DEPOSITED INTO AND CONTAINED WITHIN A TRASH RECEPTACLE |
| OR TRASH DUMPSTER. |
| |
| 2. IN ALL INSTANCES WHERE A BUILDING PERMIT HAS NOT |
| BEEN ISSUED WITHIN THREE MONTHS OF THE COMPLETION OR |
| ABANDONMENT OF LAND DISTURBING CONSTRUCTION ACTIVITIES, |
| THE JOB SITE SHALL, WITHIN 30 DAYS AFTER THE EXPIRATION |
| OF SUCH THREE-MONTH PERIOD, BE BROUGHT TO GRADE, |
| TILLED, PLANTED AND MAINTAINED WITH GROUND COVER TO |
| INCLUDE SODDING OR SEEDING WHICH SHALL HAVE IRRIGATION. |
| ANY TEMPORARY CONSTRUCTION FENCE SHALL ALSO BE REMOVED. |
| THE CONSTRUCTION SERVICES DIRECTOR OR DESIGNEE, WITH |
| INPUT FROM THE PLANNING DIRECTOR OR DESIGNEE, MAY |
| GRANT, IN WRITING, AN EXTENSION TO THE TIME FRAME FOR |
| THE ISSUANCE OF A BUILDING PERMIT, UNDER THIS |
| PARAGRAPH, WHEN THE LANDOWNER HAS DEMONSTRATED A GOOD |
| FAITH EFFORT IN PURSUING THE BUILDING PERMIT BUT THAT |
| CIRCUMSTANCES BEYOND THE CONTROL OF THE CONTRACTOR |
| AND/OR PERMITTEE HAVE OCCURRED. |
| |
| 3. ALL CONSTRUCTION WASTE AND DEBRIS FROM NEW |
| CONSTRUCTION OR MAJOR ALTERATION OR REPAIR SHALL BE |
| KEPT IN AN ENCLOSED CONTAINER TO MINIMIZE DEBRIS FROM |
| LITTERING ADJACENT PROPERTIES AND PUBLIC RIGHTS-OF-WAY. |
| THE PERMITTEE, CONTRACTOR OR LANDOWNER SHALL CAUSE SUCH |
| WASTE OR DEBRIS TO BE REMOVED WEEKLY IN ACCORDANCE WITH |
| SECTION 74-2 OF THE CITY OF WEST PALM BEACH CODE OF |
| ORDINANCES. |
| |
| 4. ALL MUD OR DEBRIS SHALL BE CONTINUALLY REMOVED FROM |
| THE PUBLIC SIDEWALKS AND STREETS. |
| |
| 5. CONTRACTORS, SUBCONTRACTORS, PERSONS HOLDING PERMITS |
| TO PERFORM LAND DISTURBING CONSTRUCTION AND LAND |
| DEVELOPMENT ACTIVITIES AND THE LANDOWNERS OF |
| CONSTRUCTION SITES SHALL, AT THE DIRECTION OF THE |
| ENGINEERING SERVICES DIRECTOR OR DESIGNEE, EITHER |
| REPAIR, OR REIMBURSE THE CITY FOR ITS COSTS INCURRED TO |
| REPAIR, ANY DAMAGE TO ANY PUBLIC RIGHT-OF-WAY THAT IS |
| CAUSED BY ANY CONSTRUCTION VEHICLE INVOLVED IN THE LAND |
| DISTURBING CONSTRUCTION OR LAND DEVELOPMENT ACTIVITIES. |
| |
| 6. IN THE EVENT THAT THE DEMOLITION PERMIT OR BUILDING |
| PERMIT EXPIRES, ALL MATERIALS AND EQUIPMENT RELATED TO |
| THE LAND DISTURBING CONSTRUCTION OR LAND DEVELOPMENT |
| ACTIVITIES SHALL BE REMOVED FROM THE JOB SITE WITHIN |
| TEN DAYS OF THE PERMIT EXPIRATION DATE. THE JOB SITE |
| SHALL, WITHIN 30 DAYS THEREAFTER, BE BROUGHT TO GRADE, |
| BE TILLED AND PLANTED WITH GROUND COVER TO INCLUDE |
| SODDING OR SEEDING WHICH SHALL HAVE IRRIGATION. SAID |
| GROUND COVER SHALL BE MAINTAINED IN ACCORDANCE WITH |
| SUBSECTIONS 74-2(C) AND SECTION 94-446 OF THIS CODE. |
| |
| 7. DEMOLITION CONTRACTOR WILL BE RESPONSIBLE FOR |
| DEVELOPING AND IMPLEMENTING A SITE SPECIFIC STORMWATER |
| POLLUTION PREVENTION PLAN (SWPPP). |
| |
| 8. THE DEMOLITION CONTRACTOR IS RESPONSIBLE FOR |
| INSTALLATION OF APPROPRIATE EROSION AND SEDIMENT |
| CONTROL MEASURES. |
| |
| 9. EXISTING UTILITIES (WATER, SANITARY, STORMWATER, |
| GAS, ELECTRIC, ETC.) WILL BE CAPPED OR REMOVED PRIOR TO |
| THE START OF ANY OTHER DEMOLITION ACTIVITIES. |
| |
| 10. PRIOR TO THE START OF ANY DEMOLITION ACTIVITIES, A |
| DOUBLE ROW OF SILT FENCING WILL BE INSTALLED AT THE |
| BETWEEN THE SITE AND ANY ADJACENT BODIES OF WATER. |
| WHERE POSSIBLE, A SINGLE ROW OF SILT FENCE WILL BE |
| INSTALLED AROUND THE PERIMETER OF THE REMAINDER OF THE |
| CONSTRUCTION AREA. ADJACENT STORMWATER CATCH BASINS AND |
| INLETS WILL BE PROTECTED BY COVERING WITH SILT FENCE |
| MATERIAL OR |
| 11. DUST CONTROL MEASURES WILL BE IMPLEMENTED BY |
| DEMOLITION CONTRACTOR AS NEEDED TO SUPPRESS DUST LEVELS |
| TO BELOW THOSE LISTED IN 29 CFR 1926.55. |
| |
| 12. ALL WASTE/DEBRIS LEAVING THE SITE WILL BE IN CLOSED |
| OR COVERED CONTAINERS. |
| |
| 13. DEMOLITION CONTRACTOR WILL UTILIZE GOOD |
| CONSTRUCTION MANAGEMENT TECHNIQUES TO CONTAIN ALL |
| STORMWATER RUNOFF WHICH HAS COME INTO CONTACT WITH |
| CONSTRUCTION DEBRIS. DEMOLITION CONTRATOR?S PERSONNEL |
| WILL INSPECT THE PERIMETER OF THE CONSTRUCTION AREA |
| DAILY TO ENSURE THAT SEDIMENT LADEN WATER DOES NOT |
| LEAVE THE SITE. |
| |
| 14. REFER TO POLLUTION CONTROL - BEST PRACTICES DETAILS |
| ON HTTP://WPB.ORG/ENGINEERING/ENGINEERING-SERVICES/ENGI |
| NEERING-STANDARDS/ |
| |
| MANUEL JULIAN GONZALEZ |
| ENGINEERING PROJECT COORDINATOR |
| PUBLIC WORKS DEPARTMENT |
| 401 CLEMATIS STREET, 4TH FLOOR |
| WEST PALM BEACH, FL 33401 |
| (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) |
| MAIN PHONE: (561) 822-1200 |
| DIRECT: (561) 494-1085 |
| FAX: (561) 494-1116 |
| EMAIL: [email protected] |
| WWW.WPB.ORG/ENGINEERING |
| |