Plan Review Notes
Plan Review Notes For Permit 15030314
Permit Number 15030314
Review Stop G
Sequence Number 1
Notes
Date Text
2015-03-11 06:09:071) SHT. P-1 NOTES A TOTAL BTU LOAD OF 1,039,000 BUT MY
 CALCULATIONS COME TO 1,264,00 INCLUDING THE EXISTING
 GENERATOR. TABLE 402.4 (20) SHOWS THE MAXIMUM BTU LOAD
 ON 3/4" PE PIPE AT 2 PSI AT 200 FT. IS 736,000 ( THERE
 IS NO ROW FOR 185 FT.). THE SIZE OF THE PE LINE FROM
 THE POINT OF CONNECTION AT THE METER UP TO THE TEE FOR
 THE GAS RANGE SHALL BE 1" ( THE 60 FT. SECTION)
 2) THE 1/2" GALVANIZED DROP TO THE RANGE SHALL BE 3/4"
 PER TABLE 402.4 (2) OF 2010 FUEL GAS CODE. THE MAXIMUM
 BTU LOAD ON 1/2" SCH. 40 PIPE @ 60 FT. IS 65,000 BTU'S.
 3) SIZE THE LINE FROM THE POOL HEATER REGULATOR TO THE
 NEW POOL HEATER. IF IT IS SCH. 40 METAL IT SHALL BE 1"
 PER TABLE 402.4 (2) OF THE FUEL GAS CODE.
 4) SHOW THE LINE SIZES AND PIPE MATERIAL FROM THE
 MEDIUM PRESSURE REGULATORS TO THE APPLIANCES WHERE
 NEEDED.
 5) NOTE # 12 ON SHT. P-1 NOTES THAT PE PIPE WILL BE
 INSTALLED OUTSIDE UNDERGROUND ONLY BUT THE PLAN CLEARLY
 SHOWS THE PIPE GOING UNDER THE SLAB TO THE NEW GAS
 GRILL. CLARIFY.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved