Plan Review Notes
Plan Review Notes For Permit 15020941
Permit Number 15020941
Review Stop ENG
Sequence Number 1
Notes
Date Text
2015-04-27 11:28:55RESPOND TO COMMENTS IN WRITING:
  
 1. SUBMIT A PROPERTY SURVEY. LIMITS OF EXISTING PARKING
 AND NORTH ENTRANCE DRIVE LIES WITHIN THE PROPERTY TO
 THE NORTH. IF THE PROPERTIES HAVE SAME OWNERS THEN A
 "UNITY OF TITLE" WILL BE REQUIRED.
  
 2. FROM THE PLANS SUBMITTED WE ARE UNABLE TO DETERMINE
 HOW MUCH IMPROVEMENTS WILL BE MADE TO CURB, PARKING AND
 SITE AS A WHOLE. DEPENDING ON THE SCOPE OF THE WORK AN
 ENGINEERING DEVELOPMENT APPROVAL FROM THE CITY OF WEST
 PALM BEACH PUBLIC WORKS DEPARTMENT IS REQUIRED FOR ALL
 PROJECTS INVOLVING OR AFFECTING THE CITY OF WEST PALM
 BEACH STREET RIGHT-OF-WAYS, EASEMENTS, POTABLE WATER
 SYSTEM, SANITARY SEWER SYSTEM, STORMWATER SYSTEM, SOLID
 WASTE COLLECTION, OR PEDESTRIAN AND VEHICULAR TRAFFIC.
 THIS INCLUDES ANY WORK THAT INCREASES IMPERVIOUS AREAS;
 CHANGES THE DIRECTION, VELOCITY, OR TIMING OF
 STORMWATER DISCHARGE; OR CREATES A CONDITION OF
 ENVIRONMENTAL CONCERN.
  
 SHOULD YOU REQUIRE FURTHER INFORMATION AS TO SUBMITTING
 FOR ENGINEERING DEVELOPMENT APPROVAL, APPLICATION FORMS
 CAN BE DOWNLOADED AT
 HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved