2016-12-02 17:41:34 | 1ST REVIEW |
| |
| GEORGE JOHNSON |
| PLUMBING PLANS EXAMINER LL |
| CITY OF WEST PALM BEACH |
| DEVELOPMENT SERVICES |
| BUILDING DIVISION |
| 561-805-6711 |
| [email protected] |
| |
| PLUMBING COMMENTS: |
| |
| 1. THE BATHROOMS IN THE CLASS ROOMS ON FIRST FLOOR |
| SHOULD COMPLY WITH THE REQUIREMENTS FOR THE YOUNGER |
| CHILDREN IN THE ADVISORY CHART FBC ACC 604.9 |
| |
| 2. THE RIM OF LAVATORY'S IN ALL THE CHILDREN'S |
| BATHROOMS SHOULD BE SET AT 31" ABOVE FINISHED FLOOR. |
| PER FBC ACC 606.2 |
| |
| 3. SEPARATE FACILITIES FOR EACH SEX ARE REQUIRED FOR |
| THE STAFF BATHROOMS. PER FBC PL 403.2 |
| |
| 4. SHT. A4.2 DETAIL 03 PLEASE PROVIDE THE DIMENSION |
| FROM THE SIDE WALL OF TOILET TO THE PARTITION NEXT TO |
| LAV IT SHALL BE A MIN OF 84" 85 " TO ALLOW FOR |
| CONSTRUCTION TOLERANCES. PER FBC PL 604.3.1 |
| |
| 5. SHT. A4.2 DETAIL 01 THE WIDTH OF 6' 8" DOES NOT |
| ALLOW FOR COMPLIANCE WITH FBC PL 604.3.1 IT SHALL BE |
| 84" 85 " TO ALLOW FOR CONSTRUCTION TOLERANCES. |
| |
| 6.SHT A4.2 DETAIL 04 PROVIDE DIMENSION FROM SIDEWALL OF |
| TOILET TO THE PARTITION TO COMPLY WITH FBC PL604.3.1 |
| |
| 7. SHT. 3.1 SANITARY RISER |
| A) FIRST FLOOR RM 180 THE FLOOR DRAIN SHALL BE |
| INDIVIDUALLY VENTED. PER FBC PL 901.2 AND 901.2.1 |
| B)FIST FLOOR RM 181 THE FLOOR DRAIN SHALL CONNECT WITH |
| FIXTURE BRANCH OF SERVICE SINK NO BUILDING DRAIN. PER |
| FBC PL 901.2 AND 901.2.1 |
| C)SECONDD FLOOR IN ROOM 280 THE FLOOR DRAIN SHALL BE |
| INDIVIDUALLY VENTED. PER FBC PL 901.2 AND 901.2.1 |
| D) SECON FLOOR THE EWC SHALL CONNECT DOWN STREAM OF THE |
| BATHROOM GROUPS.FBC PL 909.1 |
| |
| 8 SHT. P8.1 DETAIL 7 THE HOT WATER RECIRCULATION RETURN |
| LINE SHALL CONNECT TO COLD WATER INLET OF WATER HEATER |
| AND THE TEMPERING VALVE. PER FBC PL 607.2.3 |
| |
| 9. SHT.P5.1 ROOF AREAS G,F,I,J HAVE A NOTE ON THEM THAT |
| STATES HORIZONTAL STORM DRAIN SIZE = 3" 657 SF MAX THIS |
| IS UNDER THE SF OF THESE AREAS PLEASE CLARIFY. PER WPB |
| AMEND TO FBC 107.2.1 |
| |
| 10. SHT. P5.1 THE OVERFLOW DRAIN SHALL BE SIZED THE |
| SAME AS THE PRIMARY DRAIN. PER FBC PL 1107.3 |
| |
| 11. PLEASE PROVIDE SF AND SLOPE ON THE STORM RISER |
| DIAGRAM. PER WPB AMEND TO FBC 107.2.1 |
| |
| 12. SHT. P6.1 DETAIL 1 THE NOTE ON 1" CD DN TO FIRST |
| FLOOR SHOULD READ DN FROM 2ND FLOOR PLEASE CLARIFY. PER |
| WPB AMEND TO FBC 107.2.1 |
| |
| 13. ARE ANY OF THE CLASSROOMS BEING USED AS A SCIENCE |
| LAB THAT WILL USW CHEMICALS IF SO PLEASE PROVIDE TYPE |
| OF CHEMICAL MSDS SHEETS THE AMOUNTS AND HOW THERE BEING |
| STORED. PER WPB AMEND TO FBC 107.2.1 |
| |
| |