| 1) THE PALM BEACH DAY ACADEMY COMMUNITY SERVICE PLANNED |
| DEVELOPMENT IS GOVERNED BY DEVELOPMENT REGULATIONS |
| STATED IN RESOLUTION NO. 144-11. THE ABANDONMENT AND |
| REDEDICATION OF THE INTERSECTION OF TUXEDO AND COCOANUT |
| LANES AND THE ABANDONMENT OF A PORTION OF ORANGE COURT |
| ARE GOVERNED BY RESOLUTION NOS. 341-10 AND 342-10, |
| RESPECTIVELY. |
| |
| 2) PROVIDE VERIFICATION THAT THE DEVELOPMENT CONDITIONS |
| FROM RESOLUTION NO. 144-11 LISTED BELOW HAVE BEEN |
| SATISFIED: |
| |
| A. GRANT TO THE CITY A TEMPORARY ACCESS EASEMENT FOR |
| USE OF TUXEDO AND COCONUT LANES UNTIL THE ROADS ARE |
| RELOCATED; EXISTING UTILITIES UNTIL RELOCATED; AND |
| EXISTING DRAINAGE UNTIL RELOCATED, IN FORM ACCEPTABLE |
| TO THE CITY. |
| |
| B. GRANT TO THE CITY A DRAINAGE AND FLOWAGE EASEMENT |
| FOR ALL ON-SITE DRAINAGE AND FLOWAGE THROUGH THE |
| BIOSWALE [OR CURRENT ITERATION]. PBDA SHALL BE |
| RESPONSIBLE FOR MAINTENANCE OF ALL ON-SITE DRAINAGE. |
| |
| C. PROVIDE THE PLANNING DIVISION WITH A TRAFFIC CONTROL |
| PLAN, APPROVED BY THE CITY'S TRAFFIC ENGINEER, WHICH |
| INCLUDES THE LOCATIONS OF THE TRAFFIC DIRECTING |
| PERSONNEL AND A WRITTEN NARRATIVE HOW THE TRAFFIC |
| CONTROL OPERATIONS WILL FUNCTION FOR THE PICK-UP AND |
| DROP-OFF TIMES. THE COST TO CONSTRUCT, INSTALL AND |
| MAINTAIN ANY OFF-SITE SIGNAGE OR TRAFFIC CONTROL AIDES |
| SHALL BE BORNE BY THE PBDA. |
| |
| D. PREPARE A CONSTRUCTION SITE SECURITY AND MANAGEMENT |
| PLAN FOR APPROVAL BY THE CITY'S POLICE DEPARTMENT CRIME |
| PREVENTION THROUGH ENVIRONMENTAL DESIGN (CPTED) |
| OFFICIAL. |
| |
| I. THE APPLICANT, AFTER SITE CLEARING AND PLACEMENT OF |
| CONSTRUCTION TRAILERS, SHALL INSTITUTE SECURITY |
| MEASURES TO REDUCE OR ELIMINATE OPPORTUNITIES FOR |
| THEFT. THE MANAGEMENT PLAN SHALL INCLUDE, BUT NOT BE |
| LIMITED TO, TEMPORARY LIGHTING, SECURITY PERSONNEL, |
| VEHICLE BARRIERS, CONSTRUCTION/VISITOR PASS, |
| REDUCE/MINIMIZE ENTRY/EXIT POINTS, ENCOURAGE |
| SUBCONTRACTORS TO SECURE MACHINERY AND TOOLS AT END OF |
| WORK DAY, FENCING WITH SCREENING, AND/OR ANY OTHER |
| MEASURE DEEMED APPROPRIATE TO PROVIDE A SAFE AND SECURE |
| WORKING ENVIRONMENT. |
| |
| II. THE SECURITY MANAGEMENT PLAN SHALL BE MAINTAINED |
| THROUGHOUT THE CONSTRUCTION PHASE OF THE PROJECT. |
| NON-COMPLIANCE WITH THE APPROVED PLAN SHALL RESULT IN A |
| STOP-WORK ORDER FOR THE ENTIRE PLANNED DEVELOPMENT. |
| |
| III. "NO TRESPASSING" SIGNS SHALL BE POSTED EVERY 500 |
| FEET AROUND THE PERIMETER OF THE CONSTRUCTION SITE. |
| |
| E. RECORD A PLAT FOR THE ENTIRE PBDA CAMPUS. PRIOR TO |
| RECORDATION, THE PLAT SHALL BE SUBMITTED FOR REVIEW |
| THROUGH THE MINOR SUBDIVISION PROCESS TO INCLUDE ALL |
| REQUIRED EASEMENTS. THE RELOCATION AND/OR ABANDONMENT |
| OF EASEMENTS WILL REQUIRE APPLICATIONS TO BE FILED WITH |
| THE ENGINEERING SERVICES DIVISION. |
| |
| F. SUBMIT COMPREHENSIVE EMERGENCY PLANS TO THE FIRE |
| DEPARTMENT FOR THEIR APPROVAL. |
| |
| G. SUBMIT TO THE ENGINEERING SERVICES DIVISION SIGNED |
| AND SEALED ENGINEERING CALCULATIONS TO DEMONSTRATE THAT |
| WATER QUALITY IS BEING MAINTAINED FOR THE SITE AND THAT |
| POST DEVELOPMENT OFF-SITE DISCHARGE DOES NOT EXCEED THE |
| PREDEVELOPMENT OFF-SITE DISCHARGE. |
| |
| H. THE PBDA SHALL PROVIDE A TEMPORARY ACCESS, UTILITY |
| AND DRAINAGE EASEMENT, APPROVED BY THE ENGINEERING |
| SERVICES DEPARTMENT, IN FAVOR OF THE CITY AT THE TIME |
| OF THE RECORDATION OF THE PBDA PLAT. |
| |
| 3) IN ACCORDANCE WITH THE TPS APPROVAL LETTER FOR THE |
| PALM BEACH DAY ACADEMY CSPD, NO BUILDING PERMIT FOR NEW |
| DEVELOPMENT WITHIN THE PALM BEACH DAY ACADEMY CSPD WILL |
| BE ISSUED AFTER THE BUILD-OUT DATE OF DECEMBER 31, |
| 2014, UNLESS THE PALM BEACH COUNTY TRAFFIC DIVISION |
| ISSUES AN AMENDED TRAFFIC CONCURRENCY LETTER WITH A NEW |
| BUILD-OUT DATE. IN THE EVENT THAT THE PALM BEACH COUNTY |
| TRAFFIC DIVISION ISSUES A REVISED TRAFFIC CONCURRENCY |
| LETTER, THEN THE BUILD-OUT DATE IN THIS CONDITION SHALL |
| BE AMENDED THROUGH THE MINOR AMENDMENT PROCESS. |
| |
| 4) PROVIDE VERIFICATION THAT THE FOLLOWING CONDITIONS |
| OUTLINED IN RESOLUTION NO. 341-10 HAVE BEEN MET: |
| |
| A. PALM BEACH DAY ACADEMY SHALL RECORD A PLAT FOR THE |
| ENTIRE CAMPUS. PRIOR TO RECORDATION, THE PALM BEACH DAY |
| ACADEMY SHALL MAKE APPLICATION TO THE PLANNING AND |
| ZONING DEPARTMENT FOR THE REVIEW OF THE PLAT THROUGH |
| THE MINOR SUBDIVISION PROCESS WITH FINAL PLAT APPROVAL |
| THROUGH AN APPLICATION SUBMITTED TO THE CITY'S |
| ENGINEERING SERVICES DEPARTMENT. ALL REQUIRED EASEMENTS |
| SHALL BE PROVIDED EITHER BY PLAT OR SEPARATE |
| INSTRUMENT, IN A FORM ACCEPTABLE TO THE CITY. |
| |
| B. IN THE EVENT THE UTILITIES ARE RELOCATED TO ANOTHER |
| AREA OF THE PALM BEACH DAY ACADEMY CAMPUS, THE PALM |
| BEACH DAY ACADEMY SHALL GRANT TO THE CITY A UTILITY |
| EASEMENT OVER, UNDER AND THROUGH SUCH AREA OF THE |
| CAMPUS. |
| |
| C. PALM BEACH DAY ACADEMY SHALL SUBMIT AN APPLICATION |
| TO THE ENGINEERING SERVICES DEPARTMENT FOR THE |
| REALIGNMENT OF THE TUXEDO AND COCOANUT LANES AND THE |
| RELOCATION OF ANY CITY UTILITIES. AFTER THE ENGINEERING |
| SERVICES DEPARTMENT APPROVAL, THE PALM BEACH DAY |
| ACADEMY SHALL, AT ITS OWN COST AND EXPENSE, REALIGN THE |
| INTERSECTION OF TUXEDO AND COCOANUT LANES AND RELOCATE |
| ANY AND ALL UTILITY LINES LOCATED WITHIN THE ABANDONED |
| RIGHT-OF-WAY. THE PALM BEACH DAY ACADEMY SHALL POST A |
| BOND TO THE CITY IN THE AGREED AMOUNT OF THE ESTIMATED |
| COSTS ASSOCIATED WITH THE RELOCATION OF THE ROADWAY AND |
| THE UTILITY LINES PRIOR TO THE RECORDATION OF THE PALM |
| BEACH DAY ACADEMY PLAT. |
| |
| D. PALM BEACH DAY ACADEMY SHALL PROVIDE TO THE CITY A |
| TEMPORARY ACCESS EASEMENT, AND TEMPORARY UTILITIES AND |
| DRAINAGE EASEMENTS OVER AND ACROSS THE ABANDONED |
| RIGHT-OF-WAY, IN FORM APPROVED BY THE OFFICE OF THE |
| CITY ATTORNEY, AT THE TIME OF THE RECORDATION OF THE |
| PALM BEACH DAY ACADEMY PLAT. |
| |
| E. PALM BEACH DAY ACADEMY SHALL TENDER AND DELIVER |
| $11,000 TO THE CITY AS COMPENSATION FOR THE VALUE OF |
| THE RIGHT-OF-WAY AND ASSOCIATED DEVELOPMENT RIGHTS. |
| |
| 5) PROVIDE VERIFICATION THAT THE FOLLOWING CONDITIONS |
| OUTLINED IN RESOLUTION NO. 342-10 HAVE BEEN MET: |
| |
| A. PALM BEACH DAY ACADEMY SHALL RECORD A PLAT FOR THE |
| ENTIRE CAMPUS. PRIOR TO RECORDATION, THE PALM BEACH DAY |
| ACADEMY SHALL MAKE APPLICATION TO THE PLANNING AND |
| ZONING DEPARTMENT FOR THE REVIEW OF THE PLAT THROUGH |
| THE MINOR SUBDIVISION PROCESS WITH FINAL PLAT APPROVAL |
| THROUGH AN APPLICATION SUBMITTED TO THE CITY'S |
| ENGINEERING SERVICES DEPARTMENT. ALL REQUIRED EASEMENTS |
| SHALL BE PROVIDED EITHER BY PLAT OR SEPARATE |
| INSTRUMENT, IN A FORM ACCEPTABLE TO THE CITY. |
| |
| B. PALM BEACH DAY ACADEMY SHALL SUBMIT AN APPLICATION |
| TO THE ENGINEERING SERVICES DEPARTMENT FOR THE |
| REALIGNMENT OF THE TUXEDO AND COCOANUT LANES AND THE |
| RELOCATION OF ANY CITY UTILITIES. AFTER THE ENGINEERING |
| SERVICES DEPARTMENT APPROVAL, THE PALM BEACH DAY |
| ACADEMY SHALL, AT ITS OWN COST AND EXPENSE, REALIGN THE |
| INTERSECTION OF TUXEDO AND COCOANUT LANES AND RELOCATE |
| ANY AND ALL UTILITY LINES LOCATED WITHIN THE ABANDONED |
| RIGHT-OF-WAY. THE PALM BEACH DAY ACADEMY SHALL POST A |
| BOND TO THE CITY IN THE AGREED AMOUNT OF THE ESTIMATED |
| COSTS ASSOCIATED WITH THE RELOCATION OF THE ROADWAY AND |
| THE UTILITY LINES PRIOR TO THE RECORDATION OF THE PALM |
| BEACH DAY ACADEMY PLAT. |
| |
| C. IN THE EVENT THE UTILITIES ARE RELOCATED TO ANOTHER |
| AREA OF THE PALM BEACH DAY ACADEMY CAMPUS, THE PALM |
| BEACH DAY ACADEMY SHALL GRANT TO THE CITY A UTILITY |
| EASEMENT OVER, UNDER AND THROUGH SUCH AREA OF THE |
| CAMPUS. |
| |
| D. PALM BEACH DAY ACADEMY SHALL PROVIDE TO THE CITY |
| TEMPORARY UTILITIES AND DRAINAGE EASEMENTS OVER AND |
| ACROSS THE ABANDONED RIGHT-OF-WAY, IN FORM APPROVED BY |
| THE CITY ATTORNEY'S OFFICE, AT THE TIME OF THE |
| RECORDATION OF THE PALM BEACH DAY ACADEMY PLAT. |
| |
| E. PALM BEACH DAY ACADEMY SHALL TENDER AND DELIVER |
| $24,000 TO THE CITY AS COMPENSATION FOR THE VALUE OF |
| THE RIGHT-OF-WAY AND ASSOCIATED DEVELOPMENT RIGHTS. |
| |
| 6) ZONING STAFF UNDERSTANDS THAT THERE WILL BE CHANGES |
| TO THE BUILDING AND SITE SUBMITTED IN THE NEAR FUTURE. |
| IN LIGHT OF THE CONDITIONS LISTED ABOVE THAT HAVE NOT |
| BEEN ADDRESSED, ZONING STAFF WILL NOT REVIEW THE |
| SUBMITTED BUILDING PLANS UNTIL THE AMENDMENT HAS BEEN |
| REVIEWED AND APPROVED. |
| |
| 7) A RIGHT-OF-WAY PERMIT IS REQUIRED FOR THE WORK |
| WITHIN FLAGLER DRIVE, TUXEDO LANE AND COCOANUT LANE. |
| |
| 8) SEPARATE PERMITS, WITH PLANS, WILL BE REQUIRED FOR: |
| |
| A. LANDSCAPE |
| B. AWNINGS AND CANOPIES |
| C. SIGNS |
| D. PARKING AND SIDEWALKS |
| E. BICYCLE RACKS, BENCHES, TRASH CANS AND OTHER SITE |
| AMENITIES |
| F. FENCES, WALLS AND GATES |
| G. SITE LIGHTING |
| |
| 9) THIS BUILDING IS SUBJECT TO THE ARTS IN PUBLIC |
| PLACES REQUIREMENTS. |
| |
| CONTACT ERIC SCHNEIDER @ (561) 822-1446. |
| |