2015-06-18 14:03:57 | 6/18/15 TALKED TO DONNA FIEBIG. SHE AGREED TO PASS BLDG |
| W/ PROVISO. FEES APPLY. |
| |
| |
| BUILDING REVIEW APPROVED WITH PROVISO: |
| 1- REVISE DRAINAGE PLAN. WATER CAN'T BE DIVERTED TO THE |
| REAR PROPERTY. |
| 2- TYPICAL WALL SECTION: A) ROOF TILE FASTENING DOESN'T |
| COMPLY W/ THE ROOF TILE MOMENT OF RESISTANCE (RAS 127). |
| REVISE AS REQUIRED OR PROVIDE CALCULATIONS SHOWING |
| COMPLIANCE. B) SPECIFY SPACING OF 4"X8" ROOF VENTS. |
| 3- SHEET S1.00: A) SPECIFY ALL LIVE LOADS, INCLUDING |
| THE ATTIC LIVE LOADS. SEE FOOT NOTES B AND G OF TABLE |
| R301.5. ONLY THE DEAD LOADS WERE SPECIFIED. |
| B) DOOR STRUCTURAL BUCK DETAIL 2X4 DOESN'T PROVIDE FULL |
| SUPPORT TO THE DOOR FRAMING. REVISE AS REQUIRED. |
| 4- ENERGY CALCULATIONS: A) PROVIDE ADDRESS OF JOB. B) |
| REVISE DOOR INFORMATION ON PAGE 3 OF 6 TO-MATCH |
| PLANS/PRODUCT APPROVALS. WHERE IS DOOR #2 ON PLANS?. |
| C) COMPLETE THE COMPLIANCE CHECKLIST ON PAGE 6 OF 6. |
| 5- PROVIDE PRODUCT APPROVAL (2 COPIES) FOR: A) DOUBLE |
| ENTRY DOOR SIZE AS SHOWN ON PLANS. B) CABANA STORAGE |
| DOOR THAT MEETS THE CALCULATED DESIGN PRESSURES. |
| 6- ARCHITECT TO APPROVE ABOVE PRODUCT APPROVALS AND THE |
| BAHAMAS SHUTTERS. |
| 7- PROVIDE BAHAMA SHUTTERS COMPLETE INSTALLATION |
| SCHEDULE. REFERENCE PRODUCT APPROVAL SUBMITTED. |
| 8- PROVIDE COMPLETE SIGNED AND SEALED TRUSS PACKAGE AND |
| ENGINEERED BEAMS AT TIME OF INSPECTION. |