2015-02-09 10:58:50 | 2/9/2015 |
| PROJECT: SUITE 302 |
| PERMIT#: 14120084, REVISION #15020011 |
| CODE: 2008 EDITION OF THE NEC, 2010 EDITION OF THE FBC |
| ,2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, |
| ADMINISTRATION, 2012 FBC SUPPLEMENTS. |
| 1ST ELECTRICAL PLAN REVIEW |
| ACTION: DENIED |
| |
| PROVIDE CORRECTIONS TO THE ELECTRICAL PLANS TO COMPLY |
| WITH REVIEW COMMENTS BELOW: |
| |
| 1) NEC 215.2(A) (1) AND (2) |
| REVISE THE RISER DIAGRAM TO INDICATE A FULL SIZED |
| FEEDER TO PANEL MDP CAPABLE OF CARRYING THE TOTAL |
| CONNECTED LOAD AND PROTECTED BY THE 600AMP OCPD IN |
| PANEL MDP. |
| |
| 2) NEC 215.2(A) (1) |
| PROVIDE A LOAD CALCULATION TO INDICATE THE EXISTING MDP |
| PANEL CAN SUPPORT THE ADDITIONAL LOAD OF THE NEW PANEL |
| LP3B. |
| |
| 3) NEC110.15, AND 408.3(F) |
| REVISE THE PANEL SCHEDULE FOR PANEL LP3B TO FEED PANEL |
| LP3 FROM PHASE A AND PHASE C. RIGHT NOW ONE PHASE |
| FEEDING PANEL LP3 IS PHASE B (THE HIGH LEG) SEVERAL OF |
| THE LOADS BEING FED IN PANEL LP3 ARE 120V LOADS AND |
| SEVERAL OF THEM ARE CURENTLY INDICATED TO BE FED FROM A |
| HIGH LEG. |
| |
| 4) NEC110.15, AND 408.3(F) |
| REVISE PANEL SCHEDULE FOR PANEL LP3B TO FEED PANEL LP3S |
| FROM PHASE A AND PHASE C. RIGHT NOW ONE PHASE FEEDING |
| PANEL LP3S IS PHASE B (THE HIGH LEG) THE LOADS BEING |
| FED IN PANEL LP3S ARE ALL 120V LOADS AND 1/2 OF THEM |
| ARE CURENTLY INDICATED TO BE FED FROM A HIGH LEG. |
| |
| 5) WPB AMENDMENTS TO FBC 107.2 |
| INDICATE ALL WIRE SIZES IN ALL PANEL SCHEDULES. |
| |
| 6) NEC 110.16 ARC FLASH PROTECTION. |
| PROVIDE SAFETY LABELING FOR ARC FLASH PROTECTION FOR |
| THE PANEL BOARDS AND MAIN DISCONNECTING MEANS. |
| |
| 7) NEC 110.9 |
| VERIFY THE ELECTRICAL SERVICE DISCONNECTING MEANS HAS A |
| FAULT CURRENT RATING THAT IS SUFFICIENT AT NOMINAL |
| CIRCUIT VOLTAGE FOR THE CURRENT THAT MUST BE |
| INTERRUPTED. |
| |
| WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| RE-SUBMITTAL FORM. SEE LINK: |
| HTTP://WPB.ORG/DEVELOPMENT/WP-CONTENT/UPLOADS/SITES/33/ |
| 2013/09/APPLICATION_RESUBMITTAL_FORM_04132010.PDF |
| |
| ADDITIONALLY, IT IS REQUIRED TO INSERT THE CORRECTED |
| PAGES INTO THE DENIED SUBMITTAL PACKAGE. VOID THE |
| PREVIOUSLY REVIEWED SHEETS AND LEAVE FOR COMPARATIVE |
| REVIEW. |
| |
| DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, |
| 561-805-6717 OR [email protected] |
| |