Date |
Text |
2015-05-23 06:03:49 | 1) SHT. F-PP110C - THE STORM DRAIN AT GRIDLINE F7 IS |
| SHOWN AS 10" (8300 SQ.FT.) AND AS AN 8" STORM DRAIN ON |
| SHT.F-PP402. CLARIFY. |
| 2) SHT. F-PP402 SHOWS 2" DRAINS FROM THE AUTOMATIC FIRE |
| SPRINKLER SYSTEM DISCHARGING INTO THE STORM DRAINAGE |
| SYSTEM. THIS ARRANGEMENT APPEARS IN SEVERAL LOCATIONS |
| AND ON SEVERAL PAGES.THE SPRINKLER SYSTEM CANNOT |
| DISCHARGE TO THE STORM DRAINAGE SYSTEM PER CITY OF WPB |
| CODE OF ORDINANCES ARTICLE V, SEC.90-203. |
| 3) SHT.F-PP402 - THERE IS A HORIZONTAL 4" ST NEAR |
| GRIDLINE D-12 THAT JUST ENDS AND CONNECTS TO NOTHING. |
| MAY BE TYPO. CLARIFY. |
| 4) SHT. F-PP402 - 4" ST UP TO GROUND LEVEL NOT SHOWN ON |
| PLAN F-PP110A BETWEEN COLS."C" & "D" AND "12" & "13". |
| CLARIFY. |
| 5) SHT.F-PP402 - 10" ST SHOWN ON SHEET F-PP402 BY |
| ELEVATORS #1 & #2 BUT NOT ON F-PP110A. CLARIFY. |
| 6) SHT. F-PP110A & SHT. F-PP110B SHOWS HUB DRAINS IN |
| STAIRWELLS #1 & #2.THESE STAIRWELLS APPEAR TO BE RATED |
| ENCLOSED STAIRS. THE HUB DRAINS ARE NOT PERMITTED IN |
| THE STAIRWELLS PER THE 2010 FBC SEC.1022.4. |
| 7) SHT. F-PP110A - PROVIDE A MATCH LINE REFERENCE AT |
| THE BOTTOM OF THE PAGE SOUTH OF COLUMN LINE #8. WPB |
| AMEND. TO 2010 FBC SEC. 107.2.1. |
| 8) SHT.F-PP120A - SHOW THE DISCHARGE POINT OF THE 2" |
| SANITARY PUMP LINE OR REFER TO THE DRAWING WHERE IT CAN |
| BE FOUND. WPB AMEND. TO 2010 FBC SEC. 107.2.1. |
| 9) SHT. F-PP401 - IDENTIFY THE AREAS ON THE CONDENSATE |
| RISERS WHERE THEY ARE LOCATED, THE AHU'S ARE NOT SHOWN |
| ON THE PLAN. DO THE SAME ON THE PLAN VIEWS. WPB AMEND. |
| TO 2010 FBC SEC. 107.2.1. |
| 10) SHT. F-PP401 - EXPAND THE SANITARY RISER FOR THE |
| TOILET ROOM SO I CAN REVIEW IT. IT IS CRAMMED AND |
| DIFFICULT TO READ. LABEL THE PLUMBING FIXTURES.WPB |
| AMEND. TO 2010 FBC SEC. 107.2.1. |
| 11) THE EJECTOR CONNECTION TO THE SANITARY SYSTEM SHALL |
| CONNECT A MINIMUM OF 10 FEET FROM THE BASE OF ANY STACK |
| PER 2010 FBC- PLUMBING SEC.712.3.5. |
| 12) SHT. F-PP120B - COLUMN 12E NOTES 3/4" CW DN. BUT |
| NOTHING IS SHOWN. CLARIFY. |
| 13) SUBMIT A WATER RISER DIAGRAM FOR ALL THE WATER |
| PIPING TO BE DONE. WPB AMEND. TO 2010 FBC SEC. |
| 107.3.5.1.3. |
| 14) ALL HUB DRAINS AND FLOOR DRAINS CONNECTED TO THE |
| SANITARY SYSTEM SHALL BE EQUIPPED WITH TRAP PROIMERS |
| PER 2010 FBC-PLUMBING SEC.100.2.4. THIS INCLUDES THE |
| ONE S FOR THE ELEVATORS SUMPS. |
| |
| PLUMBING PLAN REVIEW |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| 561-805-6692 |
| [email protected] |
| |