2015-05-23 06:03:491) SHT. F-PP110C - THE STORM DRAIN AT GRIDLINE F7 IS
 SHOWN AS 10" (8300 SQ.FT.) AND AS AN 8" STORM DRAIN ON
 SHT.F-PP402. CLARIFY.
 2) SHT. F-PP402 SHOWS 2" DRAINS FROM THE AUTOMATIC FIRE
 SPRINKLER SYSTEM DISCHARGING INTO THE STORM DRAINAGE
 SYSTEM. THIS ARRANGEMENT APPEARS IN SEVERAL LOCATIONS
 AND ON SEVERAL PAGES.THE SPRINKLER SYSTEM CANNOT
 DISCHARGE TO THE STORM DRAINAGE SYSTEM PER CITY OF WPB
 CODE OF ORDINANCES ARTICLE V, SEC.90-203.
 3) SHT.F-PP402 - THERE IS A HORIZONTAL 4" ST NEAR
 GRIDLINE D-12 THAT JUST ENDS AND CONNECTS TO NOTHING.
 MAY BE TYPO. CLARIFY.
 4) SHT. F-PP402 - 4" ST UP TO GROUND LEVEL NOT SHOWN ON
 PLAN F-PP110A BETWEEN COLS."C" & "D" AND "12" & "13".
 CLARIFY.
 5) SHT.F-PP402 - 10" ST SHOWN ON SHEET F-PP402 BY
 ELEVATORS #1 & #2 BUT NOT ON F-PP110A. CLARIFY.
 6) SHT. F-PP110A & SHT. F-PP110B SHOWS HUB DRAINS IN
 STAIRWELLS #1 & #2.THESE STAIRWELLS APPEAR TO BE RATED
 ENCLOSED STAIRS. THE HUB DRAINS ARE NOT PERMITTED IN
 THE STAIRWELLS PER THE 2010 FBC SEC.1022.4.
 7) SHT. F-PP110A - PROVIDE A MATCH LINE REFERENCE AT
 THE BOTTOM OF THE PAGE SOUTH OF COLUMN LINE #8. WPB
 AMEND. TO 2010 FBC SEC. 107.2.1.
 8) SHT.F-PP120A - SHOW THE DISCHARGE POINT OF THE 2"
 SANITARY PUMP LINE OR REFER TO THE DRAWING WHERE IT CAN
 BE FOUND. WPB AMEND. TO 2010 FBC SEC. 107.2.1.
 9) SHT. F-PP401 - IDENTIFY THE AREAS ON THE CONDENSATE
 RISERS WHERE THEY ARE LOCATED, THE AHU'S ARE NOT SHOWN
 ON THE PLAN. DO THE SAME ON THE PLAN VIEWS. WPB AMEND.
 TO 2010 FBC SEC. 107.2.1.
 10) SHT. F-PP401 - EXPAND THE SANITARY RISER FOR THE
 TOILET ROOM SO I CAN REVIEW IT. IT IS CRAMMED AND
 DIFFICULT TO READ. LABEL THE PLUMBING FIXTURES.WPB
 AMEND. TO 2010 FBC SEC. 107.2.1.
 11) THE EJECTOR CONNECTION TO THE SANITARY SYSTEM SHALL
 CONNECT A MINIMUM OF 10 FEET FROM THE BASE OF ANY STACK
 PER 2010 FBC- PLUMBING SEC.712.3.5.
 12) SHT. F-PP120B - COLUMN 12E NOTES 3/4" CW DN. BUT
 NOTHING IS SHOWN. CLARIFY.
 13) SUBMIT A WATER RISER DIAGRAM FOR ALL THE WATER
 PIPING TO BE DONE. WPB AMEND. TO 2010 FBC SEC.
 107.3.5.1.3.
 14) ALL HUB DRAINS AND FLOOR DRAINS CONNECTED TO THE
 SANITARY SYSTEM SHALL BE EQUIPPED WITH TRAP PROIMERS
 PER 2010 FBC-PLUMBING SEC.100.2.4. THIS INCLUDES THE
 ONE S FOR THE ELEVATORS SUMPS.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR