Plan Review Notes For Permit 15010103 |
Permit Number |
15010103 |
|
Review Stop |
P |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2015-01-08 13:00:24 | 1) SUBMIT A LEGIBLE PLAN DRAWING THAT CLEARLY REFLECTS | | THE SCOPE OF WORK TO BE PERFORMED. | | A) SHOW THE LOCATION OF THE REQUIRED BUILDING | | DRAIN/BUILDING SEWER JUNCTION CLEANOUT PER THE 2010 | | FBCR, SEC.P3005.2.7. | | B) SHOW ALL PIPE SIZES AND THE TYPE OF PIPE MATERIAL | | BEING INSTALLED ON THE DRAWING. WPB AMENDMENTS TO 2010 | | FBC SEC. 107.2.1. | | C) CLEARLY SHOW THE BRANCH LINES TO EACH AREA. WPB | | AMENDMENTS TO 2010 FBC SEC. 107.2.1. | | D) SUPPLY INFORMATION AS TO HOW THE NEW PIPING WILL | | CONNECT TO THE EXISTING STACKS OR IF ANY STACKS ARE | | BEING REPLACED, INDICATE SUCH ON THE PLAN. PROVIDE THE | | TYPE OF ADAPTER BEING USED TO CONNECT THE NEW PIPING TO | | THE EXISTING. PROPER ADAPTERS SHALL BE USED IN | | ACCORDANCE WITH THE 2010 FBCR SEC.P3003.18. ADAPTERS | | SHALL COMPLY WITH ONE OF THE STANDARDS LISTED IN 2010 | | FBCR SEC.P3003.18. | | E) INDICATE ON THE PLAN HOW THE PIPE WILL BE SUPPORTED. | | COMPLY WITH 2010 FBCR SEC.P2605.1. | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | | | |
|