2015-03-20 11:16:16 | MECHANICAL WORK DONE WITHOUT PERMITS. NO MECHANICAL |
| PLANS OR PERMIT APPLICATION WERE SUBMITTED. (REPEAT |
| COMMENT) SUBMIT A MECHANICAL PERMIT APPLICATION AND TWO |
| SETS OF PLANS THAT SPECIFY THE SCOPE OF MECHANICAL WORK |
| THAT WAS DONE WITHOUT PERMITS. |
| |
| PLAN REVIEW COMMENTS |
| |
| 2ND REVIEW: FBC 2010 |
| ROBERT MCDOUGAL, CBO |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| (561) 805-6714 |
| [email protected] |
| |
| DENIED BY MECHANICAL |
| PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| |
| 1) FBC-R - M1401.3 SIZING. HEATING AND COOLING |
| EQUIPMENT SHALL BE SIZED BASED ON BUILDING LOADS |
| CALCULATED IN ACCORDANCE WITH ACCA MANUAL J OR OTHER |
| APPROVED HEATING AND COOLING CALCULATION METHODOLOGIES. |
| PROVIDE EQUIPMENT SIZING CALCULATIONS. |
| |
| 2) FBC - 107.3.5.3 PROVIDE A MECHANICAL PLAN TO SHOW |
| SUPPLY AND RETURN DUCTS PER FBC-R M16 & BATH EXHAUST |
| PER FBC-R M15. |
| |
| 3) FBC -107.3.5.1.4 MECHANICAL MINIMUM PLAN REVIEW |
| CRITERIA: SHOW, EXHAUST SYSTEMS, CLOTHES DRYER EXHAUST, |
| KITCHEN EQUIPMENT EXHAUST, SPECIALTY EXHAUST SYSTEMS, |
| EQUIPMENT, EQUIPMENT LOCATION, MAKE-UP AIR, |
| ROOF-MOUNTED EQUIPMENT, DUCT SYSTEMS, VENTILATION, |
| COMBUSTION AIR, CHIMNEYS, FIREPLACES AND VENTS, |
| APPLIANCES, BOILERS, REFRIGERATION, BATHROOM |
| VENTILATION, LABORATORY, DESIGN FLOOD ELEVATION. |
| |
| 4) FBC-R - M 1602.4 PROVIDE BALANCED AIR RETURN AT |
| BEDROOMS. |
| |
| 5) FBC 107.2.1 PROVIDE THE MODEL NUMBERS AND |
| SPECIFICATIONS OF THE HEATING AND COOLING EQUIPMENT IN |
| AN EQUIPMENT SCHEDULE ON THE MECHANICAL PLAN THAT |
| CORRESPONDS WITH THE EQUIPMENT SIZING CALCULATIONS. |
| |
| 6) PLEASE BE ADVISED THE INSPECTOR MAY REQUIRE |
| PREVIOUSLY COMPLETED WORK TO BE MADE ACCESSIBLE AND |
| OPEN FOR INSPECTION OR REQUIRE ADDITIONAL DOCUMENTATION |
| FOR ALL CONCEALED WORK PREVIOUSLY COMPLETED PURSUANT TO |
| FBC 110 & FBC 117. |
| -FBC 110.1 GENERAL. CONSTRUCTION OR WORK FOR WHICH A |
| PERMIT IS REQUIRED SHALL BE SUBJECT TO INSPECTION BY |
| THE BUILDING OFFICIAL AND SUCH CONSTRUCTION OR WORK |
| SHALL REMAIN ACCESSIBLE AND EXPOSED FOR INSPECTION |
| PURPOSES UNTIL APPROVED. |
| -FBC 117 - THE BUILDING OFFICIAL MAY REQUIRE TESTS OR |
| TEST REPORTS AS PROOF OF COMPLIANCE. REQUIRED TESTS ARE |
| TO BE MADE AT THE EXPENSE OF THE OWNER, OR AGENT, BY AN |
| APPROVED TESTING LABORATORY OR OTHER APPROVED AGENCY. |
| |
| 7) IN ORDER TO REDUCE PLAN REVIEW TIMES AND PROVIDE |
| CLARIFICATION, PLEASE SUBMIT A RESPONSE LETTER |
| INDICATING HOW EACH OF THE REVIEW COMMENTS HAS BEEN |
| ADDRESSED. |