Date |
Text |
2015-09-04 16:33:05 | PASSED W/PROVISOS |
| |
| 1) ALL ELEVATIONS, SECTIONS, ROOF PLANS AND DETAIL |
| SHEETS SHALL BE REVISED TO ACCURATELY REFLECT THE LOWER |
| BUILDING HEIGHT TO MEET THE REQUIREMENTS OF RESOLUTION |
| NO. 49-13. THE BACK-UP MATERIAL SHOWS THE SLOPED TOWER |
| ROOF MEETING THIS REQUIREMENT, BUT THERE SEEM TO BE |
| SOME OF THE AREAS SURROUNDED BY PARAPETS THAT MAY |
| EXCEED THE HEIGHT. |
| |
| 2) THE RETAINING WALL UNDER PERMIT 15090033. ALL PLANS |
| SHALL BE REVISED TO MATCH THE APPROVED RETAINING WALL. |
| CURRENTLY THERE ARE A NUMBER OF DIFFERENT |
| CONFIGURATIONS SHOWN. |
| |
| 3) THE SITE PLANS SHOW A DIFFERENT ORIENTATION FOR THE |
| BICYCLE RACK AND AREA BETWEEN THE BUILDINGS THAN THE |
| ZONING APPROVED PLANS. THE CHANGES SHALL BE REFLECTED |
| ON THE REVISED SITE PLANS AND ON A MINOR PD AMENDMENT. |
| PLEASE NOTE THAT MORSELIFE CURRENTLY HAS A MINOR PD |
| AMENDMENT UNDER REVIEW THAT COULD BE MODIFIED TO |
| INCLUDE THE CHANGES. |
| |
| 4) SHEET G101 SHOWS NOTE REFERENCING A 17 FOOT CLEAR |
| FIRE TRUCK ACCESS ROAD (SOUTH OF POOL WALL). THE |
| APPROVED SITE PLAN SHOWS THIS AS A 20 FOOT WIDE |
| DRIVEWAY. PLEASE CORRECT SHEET G101. THIS CHANGE IS |
| ALSO SHOWN ON SHEET L101. THIS SHALL BE INCLUDED ON THE |
| PLAN REVISIONS. |
| |
| 5) SHEET C101 SHOWS THE 20 FOOT FIRE DEPARTMENT ACCESS |
| DRIVE ON THE EAST SIDE OF THE BUILDINGS AS NOT INCLUDED |
| WITH THE CONSTRUCTION THE INITIAL TOWER. THIS WAS A |
| REQUIREMENT OF THE FIRE DEPARTMENT TO SERVICE THE |
| BUILDING AND THUS SHALL BE PROVIDED FOR IN PHASE 1. |
| |
| 6) SEPARATE PERMITS, WITH PLANS, ARE REQUIRED FOR THE |
| FOLLOWING: |
| |
| A. LANDSCAPE - PLEASE NOTE THAT THE ROW OR PARKING TO |
| THE NORTH OF THE 20 FOOT FIRE DEPARTMENT ACCESS AREA |
| SHALL BE TERMINATED BY THE REQUIRED TREE IN PHASE 1. |
| B. IRRIGATION |
| C. TEMPORARY CONSTRUCTION ACCESS DRIVE - NOTE: A TREE |
| ALTERATION PERMIT IS REQUIRED PRIOR TO THE APPROVAL OF |
| THE TEMPORARY ACCESS DRIVE TREE REMOVAL. |
| D. PARKING LOT PAVING AND STRIPING |
| E. BICYCLE RACK |
| F. COMPACTOR ENCLOSURE |
| G. POOL, SPA AND FOUNTAIN |
| H. FENCES AND GATES |
| I. GENERATOR BUILDING |
| J. SITE LIGHTING |
| K. COOLING TOWER AREA |
| |
| 7) NOTE: THE FUTURE TRACT LINE DOES NOT MATCH UP WITH |
| THE DOORWAY AS SHOWN ON SHEET L101. THE FUTURE TRACT |
| LINE SHALL NOT CUT THROUGH THE CORRIDOR AT AN |
| UNPROTECTED POINT. |
| |
| 8) PLEASE REMEMBER THE DEADLINE FOR THE PLAT APPROVAL |
| APPROVED BY ROBERT BROWN, BUILDING OFFICIAL. |
| |
| 9) PLEASE NOTE THAT THE TRADITIONS PHASE II SHALL HAVE |
| MET THE COMMENCEMENT OF DEVELOPMENT DATE OF NOVEMBER 3, |
| 2015, IN ACCORDANCE WITH ITS FINAL EXTENSION. |
| |
| CONTACT ERIC SCHNEIDER @ (561) 822-1446. |