Date Text
2015-08-11 13:41:20APPROVED WITH THE FOLLOWING PROVISOS;
  
 1) SUBMIT TOTAL BTU LOAD ON GAS SYSTEM, THE TOTAL
 DISTANCE FROM THE POINT OF DELIVERY TO THE MOST REMOTE
 OUTLET, TYPE OF PIPE, TYPE OF GAS, PSI OF THE SYSTEM,
 MANUF. SPECS FOR ALL NEW EQUIPMENT. WPB AMEND. TO FBC
 SEC. 103.3.5.1.5.
 2)SUBMIT ROOF DRAINAGE CALCULATIONS.CALCULATIONS SHALL
 INCLUDE 1/2 THE AREA OF ANY VERTICAL WALL THAT DIVERTS
 RAINWATER TO THE ROOF AND SHALL ALSO INCLUDE ANY AREAS
 OF THE SLOPED ROOFS THAT DIVERT RAINWATER ONTO THE FLAT
 ROOFS.2010 FBC-PLUMBING SEC. 1106..1, 1106.4, 1106.7..
 3)TWO COPIES OF "KES" DRAWINGS SHALL BE SUBMITTED FOR
 REVIEW. WPB AMNED. TO FBC SEC. 107.2.1.
 4) SIZING OF SANITARY AND INDIRECT WASTE PIPING SHALL
 COMPLY W/CHAPT.7 & CHAPT. 8 OF 2010 FBC-PLUMBING.
 5) PER THE LIFE-SAFETY PLAN (G101) THE TOTAL ASSEMBLY
 OCCUPANT LOAD IS 160 PERSONS. IT IS DESIGNATED AS A-2.
 TABLE 403.1 REQUIRES 2 WATER CLOSETS FOR MALES (1 PER
 75) AND TWO FOR FEMALES (1 PER 75). THE PLAN SHOWS ONE
 EACH. REVISE THE FIXTURE COUNT AND SHOW THE ADDITIONAL
 FIXTURES IN THE RESTROOMS.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  