2015-03-07 18:09:23 | ****CORRECTIONS**** |
| |
| SAMANTHA HILL |
| BUILDING PLANS EXAMINER |
| [email protected] |
| 561-805-6724 |
| |
| 1. SCOPE NOT CLEAR. PLANS FOR RENOVATION WERE |
| SUBMITTED, BUT THIS IS BEING REVIEWED UNDER ANOTHER |
| PERMIT. PLEASE REMOVE SHEETS RELATED TO CONSTRUCTION |
| AND SUBMIT ONLY DEMO SHEETS. MECHANICAL SHEETS NOT |
| REVIEWED AT THIS TIME AS THEY ARE BEING REVIEWED UNDER |
| ANOTHER PERMIT. |
| |
| 2. HOW WILL THE STRUCTURE BE KEPT SECURE IF WINDOWS ARE |
| REMOVED? WINDOW REMOVAL WILL BE REMOVED FROM SCOPE OF |
| WORK UNLESS CONTRACTOR ADDRESSES THIS ISSUE, FBC 107. |
| |
| 3. ELEVATION CERTIFICATE WAS NOT PROVIDED, AND THERE |
| ARE CONFLICTING ELEVATIONS ON THE PLAN. THIS PERMIT |
| WILL NOT BE ISSUED WITHOUT AN ELEVATION CERTIFICATE. |
| |
| 4. PRIOR TO ISSUANCE OF A DEMO PERMIT, PLANS ARE TO |
| INDICATE HOW THE STRUCTURE WILL BE BROUGHT INTO FULL |
| COMPLIANCE. FLOOD VENTS MAY BE REQUIRED IN THE CRAWL |
| SPACE. THE GARAGE MAY NEED TO BE RAISED OR VENTS |
| INSTALLED. THIS APPLIES TO THE WALKWAY, DEPENDING ON |
| WHETHER IT IS OPEN OR ENCLOSED. THE FIRST STEP IS A |
| SIGNED AND SEALED ELEVATION CERTIFICATE WITH |
| PHOTOGRAPHS OF ALL SIDES OF THE STRUCTURE(S). A |
| COMPLETE REVIEW CANNOT BE PERFORMED WITHOUT THIS |
| INFORMATION. |
| |
| FOR YOUR CONVENIENCE, NFIP REVIEW: |
| |
| ****CORRECTIONS**** |
| |
| SAMANTHA HILL |
| BUILDING PLANS EXAMINER |
| [email protected] |
| 561-805-6724 |
| |
| 1. AS THE PROPOSED RENOVATION CONSTITUTES A SUBSTANTIAL |
| IMPROVEMENT, PROVIDE A COPY OF THE ELEVATION |
| CERTIFICATE FOR THIS STRUCTURE. THIS MAY BE SENT VIA |
| EMAIL FOR PRELIMINARY REVIEW. |
| |
| BASED ON THE SITE PLAN, IT APPEARS THAT: |
| |
| THE HOUSE FINISHED FLOOR IS IN COMPLIANCE (OVER 7.5') |
| |
| NO INFORMATION PROVIDED REGARDING MECHANICAL EQUIPMENT |
| (MUST BE OVER 7.5') |
| |
| THE GARAGE FLOOR IS AT 6.68'. THIS DOES NOT COMPLY WITH |
| THE MINIMUM 7.5'). ARE FLOOD VENTS INSTALLED IN THE |
| GARAGE? IS THE GARAGE TO BE RAISED? SHEET A2 SHOWS |
| GARAGE ELEVATION AS 10'1" AND AS 7'. PROPOSED |
| CONSTRUCTION NOT CLEAR. |
| |
| IS THE BREEZEWAY ENCLOSED? WILL THIS BE RAISED? |
| |
| THE ELEVATION CERTIFICATE SHOULD PROVIDE THE |
| INFORMATION REQUIRED TO DETERMINE ACTIONS WHICH WILL BE |
| REQUIRED FOR ISSUANCE. |
| |
| PLEASE PROVIDE A CURRENT ELEVATION CERTIFICATE WHICH |
| SHOWS EXISTING CONDITIONS. |
| |
| THREE ADDITIONAL ELEVATION CERTIFICATES WILL BE |
| REQUIRED: |
| |
| CONSTRUCTION DOCUMENTS (PLEASE PROVIDE AT THIS TIME, |
| SHOWS ELEVATIONS PROPOSED) |
| BUILDING UNDER CONSTRUCTION (WILL BE REQUIRED AT |
| INSPECTION) |
| FINISHED CONSTRUCTION (WILL BE REQUIRED PRIOR TO |
| CERTIFICATE OF COMPLETION, AFTER FINISHED GRADE AND ALL |
| MECHANICAL EQUIPMENT HAS BEEN INSTALLED) |
| |
| 2. DOCUMENTS PREPARED BY AN ARCHITECT AND SUBMITTED FOR |
| PUBLIC RECORD ARE TO BE SIGNED, SEALED, DATED ORIGINALS |
| FS 481. |
| |
| |
| |
| |
| |