2014-12-15 11:19:09 | ****CORRECTIONS**** |
| |
| SAMANTHA HILL |
| BUILDING PLANS EXAMINER |
| [email protected] |
| 561-805-6724 |
| |
| 1. AS THE PROPOSED RENOVATION CONSTITUTES A SUBSTANTIAL |
| IMPROVEMENT, PROVIDE A COPY OF THE ELEVATION |
| CERTIFICATE FOR THIS STRUCTURE. THIS MAY BE SENT VIA |
| EMAIL FOR PRELIMINARY REVIEW. |
| |
| BASED ON THE SITE PLAN, IT APPEARS THAT: |
| |
| THE HOUSE FINISHED FLOOR IS IN COMPLIANCE (OVER 7.5') |
| |
| NO INFORMATION PROVIDED REGARDING MECHANICAL EQUIPMENT |
| (MUST BE OVER 7.5') |
| |
| THE GARAGE FLOOR IS AT 6.68'. THIS DOES NOT COMPLY WITH |
| THE MINIMUM 7.5'). ARE FLOOD VENTS INSTALLED IN THE |
| GARAGE? IS THE GARAGE TO BE RAISED? SHEET A2 SHOWS |
| GARAGE ELEVATION AS 10'1" AND AS 7'. PROPOSED |
| CONSTRUCTION NOT CLEAR. |
| |
| IS THE BREEZEWAY ENCLOSED? WILL THIS BE RAISED? |
| |
| THE ELEVATION CERTIFICATE SHOULD PROVIDE THE |
| INFORMATION REQUIRED TO DETERMINE ACTIONS WHICH WILL BE |
| REQUIRED FOR ISSUANCE. |
| |
| PLEASE PROVIDE A CURRENT ELEVATION CERTIFICATE WHICH |
| SHOWS EXISTING CONDITIONS. |
| |
| THREE ADDITIONAL ELEVATION CERTIFICATES WILL BE |
| REQUIRED: |
| |
| CONSTRUCTION DOCUMENTS (PLEASE PROVIDE AT THIS TIME, |
| SHOWS ELEVATIONS PROPOSED) |
| BUILDING UNDER CONSTRUCTION (WILL BE REQUIRED AT |
| INSPECTION) |
| FINISHED CONSTRUCTION (WILL BE REQUIRED PRIOR TO |
| CERTIFICATE OF COMPLETION, AFTER FINISHED GRADE AND ALL |
| MECHANICAL EQUIPMENT HAS BEEN INSTALLED) |
| |
| 2. DOCUMENTS PREPARED BY AN ARCHITECT AND SUBMITTED FOR |
| PUBLIC RECORD ARE TO BE SIGNED, SEALED, DATED ORIGINALS |
| FS 481. |
| |
| |
| |