Date |
Text |
2014-12-19 13:17:21 | AN ENGINEERING DEVELOPMENT PERMIT APPLICATION IS |
| REQUIRED FOR THIS PROJECT. THIS IS A CONCEPTUAL LEVEL |
| REVIEW. TECHNICAL DETAILS OF THE WATER, SEWER, |
| STORMWATER, TRAFFIC CIRCULATION, AND SOLID WASTE |
| COLLECTION WILL BE REVIEWED AS PART PART OF THE |
| ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT |
| APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT |
| HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| |
| PRIOR TO START OF CONSTRUCTION, A UNITY OF TITLE MUST |
| BE COMPLETED. INSTRUCTIONS AND THE APPLICATION FORM CAN |
| BE DOWNLOADED AT |
| HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| |
| NEW PARKING STALL STRIPING MUST COMPLY WITH CITY OF |
| WEST PALM BEACH CODE OF ORDINANCES, ARTICLE XV, SECTION |
| 94-485. |
| |
| THE AVAILABLE WATER PRESSURE WITHIN THE CITY MAY NOT BE |
| ACCEPTABLE AT ELEVATIONS HIGHER THAN THE 2ND FLOOR. WE |
| RECOMMEND THAT A LONG-TERM PRESSURE STUDY BE PERFORMED |
| ON THE POTABLE WATER LINES PRIOR TO FINALIZATION OF THE |
| DESIGN. |
| |
| SHOW THAT ALL POTABLE WATER, STORMWATER, AND SANITARY |
| SEWER CROSSINGS MEET THE SEPARATION REQUIREMENTS OF |
| RULES 62-555.314 AND 62-604 FAC |
| |
| SEE THE FIRE DEPARTMENT COMMENTS FOR THE REQUIREMENTS |
| FOR FIRE SUPPLY LINES, WHICH WILL INCLUDE THE PROPOSED |
| POTABLE WATER LINE IF A SEPARATE FIRE LINE IS NOT |
| PROVIDED. |
| |
| SUBMIT A HYDRAULIC ANALYSIS OF THE PROPOSED WATER |
| DISTRIBUTION SYSTEM. |
| |
| REVISE THE PLANS TO INCLUDE APPLICABLE CITY ENGINEERING |
| STANDARD DETAILS. INDICATE THE YARD PIPING DESIGN |
| STANDARDS (MINIMUM COVER, HORIZONTAL AND VERTICAL |
| CLEARANCES), AND WHICH JOINTS ARE TO BE MECHANICALLY |
| RESTRAINED. |
| |
| PLEASE SHOW THAT THE PROPOSED TRASH DUMPSTER/COMPACTORS |
| ARE LOCATED IN AREAS EASILY SERVICED BY THE CITY |
| SANITATION EQUIPMENT AND MANPOWER. SECTION 74-35(A)(5) |
| OF THE CODE OF ORDINANCES. |
| |
| VERIFY THAT THE PROPOSED SIZE AND QUANTITY OF TRASH |
| BINS IS APPROPRIATE FOR THE WASTE YARDAGE ANTICIPATED |
| TO BE GENERATED BY THE COMPLEX. CONSIDER USING A |
| COMPACTOR TO REDUCE THE YARDAGE OF WASTE THAT WILL NEED |
| TO BE COLLECTED. |
| |
| APPROPRIATE MEASURES SHALL BE TAKEN TO ENSURE THAT |
| REMOVAL OF STORMWATER WILL NOT ADVERSELY AFFECT |
| NEIGHBORING PROPERTIES OR THE PUBLIC STORM DRAINAGE |
| SYSTEM. DEMONSTRATE THAT THE DESIGN INCLUDES PROVISIONS |
| FOR THE CONSTRUCTION OF FACILITIES, INCLUDING GRADING, |
| GUTTERS, PIPING AND THE TREATMENT OF TURF, TO |
| ACCOMMODATE STORMWATER AND TO PREVENT EROSION AND THE |
| FORMATION OF SILT. CODE OF ORDINANCES SECTION |
| 94-35(C)(11) |
| |
| PLEASE DEMONSTRATE THAT THE PROJECT WILL PROVIDE |
| ADEQUATE DRAINAGE AND STORMWATER MANAGEMENT. [SECTIONS |
| 90-201, 94-35(C )(11), AND 94-307 OF THE CODE OF |
| ORDINANCES]. |
| |
| PLEASE SHOW THE LOCATIONS OF THE ROOF DRAINS AND |
| INDICATE WHERE THE RUNOFF FROM THE ROOF DRAINS WILL BE |
| DIRECTED. THE ROOF DRAIN PEAK DISCHARGE RATE AND |
| VELOCITY WILL NEED TO BE INCLUDED IN THE FINAL DESIGN |
| OF THE STORMWATER MANAGEMENT SYSTEM. |
| |
| KELLY CRANFORD, P.E. |
| LAND DEVELOPMENT ENGINEER |
| PUBLIC WORKS DEPARTMENT |
| CITY OF WEST PALM BEACH |
| [email protected] |
| 561-494-1098 (OFFICE) |
| |