Plan Review Notes For Permit 14120171 |
Permit Number |
14120171 |
|
Review Stop |
G |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2014-12-09 13:40:57 | 1) HOW CAN ONLY 10 FT. OF PE PIPE BE RUN WHEN THE GAS | | METER IS SHOWN ON THE EAST SIDE OF THE STRUCTURE AND | | THE GENERATOR IS SHOWN ON THE WEST SIDE? SUBMIT TWO | | COPIES OF THE SURVEY THAT CLEARLY SHOW THE LOCATION OF | | THE GENERATOR AND THE LOCATUION OF THE NATURAL GAS | | METER. WPB AMEND. TO 201 FBC SEC. 107.2.1. | | 2) SUBMIT TWO CLEAN COPIES OF A GAS PLAN THAT CLEARLY | | SHOWS THE LOCATION OF THE GENERATOR, THE LOCATION AND | | LENGTH OF THE PIPING,& THE TOAT DISTANCE FROM THE GAS | | METER TO THE GENERATOR. DO NOT USE COPIES OF PREVIOUSLY | | PERMITTED AND SIGNED PLANS. WPB AMEND. TO 2010 FBC SEC. | | 107.2.1, 107.1. | | 3) THE GAS PLAN SHOWS THE PE PIPE RUNNING THROUGH THE | | STRUCTURE. PE PIPE CAN ONLY BE USED OUTSIDE | | UNDERGROUND. FGC SEC.404.15.1. | | 4) SHOW THE LOCATION OF THE 2ND STAGE REGULATOR ON THE | | PLAN.WPB AMEND. TO 2010 FBC SEC. 107.2.1. | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | |
|