Date |
Text |
2014-12-24 09:25:21 | NEW SINGLE FAMILY RESIDENCE (R3) MECHANICAL REVIEW |
| COMMENTS. |
| CODE: 2010 FBC. |
| |
| 1- EQUIPMENT SIZING CALCULATIONS CAN NOT BE DONE FOR |
| WORST CASE SCENARIO. CALCULATIONS NEED TO BE DONE FOR |
| THE ACTUAL BUILDING ORIENTATION AS REQUIRED BY SEC. |
| 403.6.1 OF 2010 FBC-ENERGY CONSERVATION. REVISE AS |
| REQUIRED. |
| |
| 2- PROVIDE THE SELECTED EQUIPMENT SENSIBLE AND TOTAL |
| COOLING CAPACITIES AS REQUIRED BY SEC. 403.6.1 OF 2010 |
| FBC-ENERGY CONSERVATION. |
| |
| 3- PROVIDE COMPLETE DETAILS AND SPECIFICATIONS SHOWING |
| HOW OBTAINING R9.2 INSULATION ON CONCRETE WALLS AS |
| SPECIFIED ON THE EQUIPMENT SIZING CALCULATIONS. SEC. |
| 103.2.2 OF 2010 FBC-ENERGY CONSERVATION. |
| |
| 4- INFORMATION SHOWN ON THE EQUIPMENT SIZING |
| CALCULATIONS FOR HEATING DON'T MATCH INFORMATION SHOWN |
| ON THE ENERGY CALCULATIONS. REVISE AS REQUIRED TO |
| MATCH. SEC. 103.2.2 OF 2010 FBC-ENERGY CONSERVATION. |
| |
| 5- CLARIFY WHY THE EQUIPMENT SIZING CALCULATIONS ARE |
| TAKING AN OCCUPANT LOAD OF 26 OCCUPANTS FOR THIS HOUSE. |
| SEC. 103.2.2 OF 2010 FBC-ENERGY CONSERVATION. |
| |
| 6- PROVIDE THE NAME AND SIGNATURE OF THE PERSON |
| RESPONSIBLE FOR THE A/C PLAN AS REQUIRED BY SEC. |
| 107.2.1 OF CITY AMENDMENTS. |
| |
| ***PLEASE PROVIDE RESPONSE LETTER ADDRESSING EACH |
| COMMENT TO EXPEDITE THE REVIEW PROCESS. |
| *** PLEASE REMOVE AND REPLACE ANY REVISED DRAWING. |
| |
| IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT |
| JULIO GOMEZ |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| DEVELOPMENT SERVICES DEPARTMENT |
| (561)805-6712 |
| [email protected] |
| |
| |