2014-12-16 16:28:44 | 12/16/2014 |
| PROJECT: TANNING SALON |
| PERMIT#: 14110915 |
| CODE: 2008 EDITION OF THE NEC, 2010 EDITION OF THE FBC |
| ,2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, |
| ADMINISTRATION, 2012 FBC SUPPLEMENTS. |
| 1ST ELECTRICAL PLAN REVIEW |
| ACTION: DENIED |
| |
| 1) REVISE THE RISER DIAGRAM TO INDICATE THE SIZE OF THE |
| EXISTING FEEDERS TO PANEL A AND PANEL B. NEC 215.5 |
| |
| 2) PROVIDE A SITE PLAN THAT INCLUDES THE LOCATION OF |
| BAY#2505, THE LOCATION OF THE EXISTING SERVICE AND THE |
| LOCATION OF THE NEW SERVICE TO SHOW COMPLIANCE WITH THE |
| NEC 230.72 "GROUPING OF DISCONNECTS," |
| |
| 3) INDICATE THE ROUTING OF THE NEW SERVICE FEEDER TO |
| INDICATE COMPLIANCE WITH NEC 230.3 "ONE BUILDING OR |
| OTHER STRUCTURE NOT TO BE SUPPLIED THROUGH ANOTHER." |
| |
| 4) PROVIDE REASONING FOR THE NEW SERVICE TO INDICATE |
| COMPLIANCE WITH NEC 230.2 " NUMBER OF SERVICES" . |
| |
| 5) PROVIDE A COMPLETE LOAD CALCULATION OF THE |
| ELECTRICAL SERVICE INCLUDING THE EXISTING AND NEW |
| PANELS INDICATING THE TOTAL CONNECTED LOAD AFTER THE |
| ADDITION OF NEW CIRCUITS. BASED ON PART II AND III OF |
| THE NEC 220 |
| |
| 6) VERIFY THE ELECTRICAL SERVICE DISCONNECTING MEANS |
| HAS A FAULT CURRENT RATING THAT IS SUFFICIENT AT |
| NOMINAL CIRCUIT VOLTAGE FOR THE CURRENT THAT MUST BE |
| INTERRUPTED. NEC 110.9 |
| |
| 7) PROVIDE SAFETY LABELING FOR ARC FLASH PROTECTION FOR |
| THE PANEL BOARDS AND MAIN DISCONNECTING MEANS. NEC |
| 110.16, 110.22 |
| |
| 8) PROVIDE MANUFACTURER PRODUCT SPECIFICATIONS |
| INDICATING THE NRTL LISTING, VOLTAGE AND KW LOAD FOR |
| EACH PEICE OF EQUIPMENT. NEC 110.3(B) |
| |
| 9) REVISE THE PLANS TO CLARIFY GROUNDING OF THE BUCK |
| BOOST TRANSFORMERS. PROVIDE A DETAIL INDICATING HOW TO |
| CONNECT THE BUCK BOOST TRANSFORMER'S GROUNDING |
| ELECTRODE BACK TO THE MAIN GROUNDING ELECTRODE SYSTEM |
| VIA EQUIPMENT GROUND SIZED IN ACCORDANCE WITH THE NEC |
| 250.122 |
| |
| 10) REVISE THE FLOOR PLAN TO INDICATE THE LOCATIONS OF |
| THE BUCK BOOST TRANSFORMER WHERE REQUIRED. FBC-WPB |
| AMENDMENTS 107.3.5 |
| |
| 11) REVISE THE PLAN TO INDICATE THE REQUIRED CLEARANCE |
| AND DEDICATED WORKING SPACE ABOUT ELECTRICAL EQUIPMENT |
| INCLUDING THE SERVICE EQUIPMENT, SERVICE PANELS, BUCK |
| BOOST TRANSFORMERS AND DISCONNECTS FOR TANNING |
| EQUIPMENT. NEC110.26 |
| |
| 12) REVISE THE PLAN TO INDIACTE THE LOCATION OF THE |
| LIGHTING CONTACTOR(S) AND PROVIDE ADDITIONAL DETAIL TO |
| INDICATE COMPLIANCE WITH FBC-E 505.2 LIGHTING CONTROLS |
| (MANDATORY) LIGHTING SYSTEMS SHALL BE PROVIDED WITH |
| CONTROLS AS REQUIRED IN SECTIONS 505.2.1, 505.2.2, |
| 505.2.3 AND 505.2.4. |
| |
| 13) THE BRANCH CIRCUIT FEEDING THE EXIT AND EMERGENCY |
| LIGHTING EQUIPMENT SHALL BE THE SAME BRANCH CIRCUIT AS |
| THAT SERVING THE NORMAL LIGHTING IN THE AREA AND |
| CONNECTED AHEAD OF ANY LOCAL SWITCHES. NEC 700.12(F) |
| |
| WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| RE-SUBMITTAL FORM. SEE LINK: |
| HTTP://WPB.ORG/DEVELOPMENT/WP-CONTENT/UPLOADS/SITES/33/ |
| 2013/09/APPLICATION_RESUBMITTAL_FORM_04132010.PDF |
| |
| ADDITIONALLY, IT IS REQUIRED TO INSERT THE CORRECTED |
| PAGES INTO THE DENIED SUBMITTAL PACKAGE. VOID THE |
| PREVIOUSLY REVIEWED SHEETS AND LEAVE FOR COMPARATIVE |
| REVIEW. |
| |
| DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, |
| 561-805-6717 OR [email protected] |
| |