Plan Review Notes For Permit 14110718 |
Permit Number |
14110718 |
|
Review Stop |
B |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2014-11-21 12:34:18 | RE-ROOF BUILDING REVIEW COMMENTS. | | CODE: 2010 FBC. | | | | | | 1- ENGINEER TO REVISE THE RAS 117 CALCULATIONS (SUBMIT | | TWO NEW REVISE CALCULATIONS WITH ORIGINAL SEAL AND | | SIGNATURE): | | A) ACCORDING TO SEC. 1609.4.3 OF 2010 FBC THIS BUILDING | | IS LOCATED IN EXPOSURE "D" NOT "C". REVISE THE DESIGN | | PRESSURES AND INSULATION FASTENERS ACCORDINGLY. | | | | B) ENGINEER TO REVISE PAGE OF SELECTED APPROVED | | ASSEMBLY W-2. THE CORRECT PAGE IS 4 OF 69. PAGE 9 OF 69 | | IS FOR STEEL OR CONCRETE DECKS. REVISE AS REQUIRED. | | SEC. 107.2.1 CITY AMENDMENTS TO FBC. | | | | 2- ROOF PLAN SKETCH SUBMITTED: | | A) STATES "PONDING WATER". RE-ROOFING DOESN'T REQUIRE | | 1/4 PER FOOT SLOPE BUT IT REQUIRES POSITIVE DRAINAGE. | | SEE SEC. 611.1 OF 2010 FBC-EXISTING BUILDING. NEED TO | | PROVIDE POSITIVE DRAINAGE WHEN RE-ROOFING. | | | | B) THERE IS A NOTE SAYING "SEAL 2 SCUPPERS". CLARIFY IF | | SEALING MEANING FOR LEAKAGE OR IF SEALING FOR CLOSING | | SCUPPERS. COORDINATE WITH ITEM #2(A) ABOVE. | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | (561)805-6712 | | [email protected] |
|