Date |
Text |
2014-11-19 15:11:00 | 1) SHT. A-0.3 - THE HANDICAP DETAILS ARE ILLEGIBLE. |
| SUBMIT A SHEET THAT IS CLEAR IN DETAIL AND LEGIBLE. WPB |
| AMEND. TO 2010 FBC SEC. 107.2. |
| 2) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS FOR ALL |
| GAS EQUIPMENT. ALL EQUIPMENT SHALL BE LISTED AND |
| LABELED PER THE 2010 FUEL GAS CODE SEC. 301.3. |
| 3) SHOW THE LOCATION AND SIZE OF THE EXISTING GREASE |
| TRAP. WPB AMEND. TO FBC 107.2.1. |
| 4) SHT.P-1 SHOWS INDIRECT WASTE FROM ICE MAKER |
| DISCHARGING INTO THE GREASE TRAP. WASTES THAT DO NOT |
| REQUIRE TREATMENT OR SEPARATION SHALL NOTBE DISCHARGED |
| INTO ANY INTERCEPTOR OR SEPARATOR. 2010 FPC SEC.1003.2. |
| 5) SHT.P-2 - SIZE THE LOOP VENT FOR THE RESTROOMS. WPB |
| AMEND. TO 2010 FBC SEC. 107.2. |
| 6) SHT. P-2 - PLANS SHOW AN "EXISTING SANITARY LINE" |
| WITH A TRENCH DRAIN CONNECTING TO THE "EXISTING GREASE |
| LINE". CLARIFY. SANITARY LINE CANNOT DISCHARGE INTO THE |
| GREASE LINE PER THE 2010 FPC SEC.1003.2. |
| 7) SHT. P-2 - THE SIZING OF THE GREASE INTERCEPTOR |
| SHALL BE DONE IN ACCORDANCE W/ 2010 FPC SEC.1003.5.1, |
| NOT TABLE 709.1 AS NOTED ON SHT.P-2.. SUBMIT |
| CALCULATIONS FOR THE ADDED FIXTURES TO THE GREASY |
| WASTE. |
| 8) SHT. P-2 - SIZE THE SECTION OF GAS LINE BETWEEN THE |
| MANUAL SHUT-OFF VALVE 6' A.F.F. TO THE CONVECTION OVEN. |
| 9) SHT.P-3 - "GENERAL PLUMBING NOTES" - SECOND COLUMN - |
| 3RD SENTENCE DOWN - REFERENCE IS MADE TO CODE SEC. |
| 13-412.1.ABC.2.5.2. OF 2010 FBC. THERE IS NO SUCH CODE |
| SECTION. THIS IS FROM A PREVIOUS EDITION OF THE |
| FL.ENERGY CODE.THE CORRECT CODE SEC. IS 504.8.2. |
| |
| PLUMBING PLAN REVIEW |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| 561-805-6692 |
| [email protected] |
| |