2014-12-30 10:19:24 | PLAN REVIEW COMMENTS |
| |
| 2ND REVIEW: FBC 2010 |
| ROBERT MCDOUGAL, CBO |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| (561) 805-6714 |
| [email protected] |
| |
| DENIED BY BUILDING |
| PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| |
| 1) THE SCOPE OF WORK FOR THIS PROJECT IS A SUBSTANTIAL |
| IMPROVEMENT BASED ON FEMA AND CITY OF WEST PALM BEACH |
| FLOOD ORDINANCE REQUIREMENTS. THE STRUCTURE IS LOCATED |
| IN A SPECIAL FLOOD HAZARD AREA, SPECIFICALLY AN A5 |
| FLOOD ZONE WITH A 7' ELEVATION. THE CITY OF WEST PALM |
| BEACH'S FLOOD ORDINANCE REQUIRES A 6 INCH "FREEBOARD". |
| THEREFORE THE REQUIRED MINIMUM FINISHED FLOOR ELEVATION |
| IS 7.5' BFE (NGVD 29). ALL OF THE EQUIPMENT, THE |
| EXISTING, THE NEW AND THE FINISHED FLOOR OF THE |
| ATTACHED GARAGE IS REQUIRED TO BE AT OR ABOVE 7.5' BFE. |
| SPECIFY COMPLIANT ELEVATIONS ON THE PLANS. A |
| PRE-CONSTRUCTION ELEVATION CERTIFICATE BASED ON THE |
| CONSTRUCTION DRAWINGS IS REQUIRED. FBC R322 |
| -THE ELEVATION CERTIFICATE THAT WAS SUBMITTED FOR THE |
| EXISTING STRUCTURE CONTAINS ERRORS. |
| -THE PLAT NUMBER SHOULD BE 3. |
| -THE LONGITUDE SHOULD HAVE A MINUS SIGN IN FRONT OF IT. |
| -THE DECIMAL NUMBER COORDINATES THAT ARE LISTED ON THE |
| CERTIFICATE ARE INCORRECT. |
| -THE ELEVATIONS SPECIFIED ON SHEET S1.0 ARE NOT IN |
| COMPLIANCE WITH THE CITY'S FLOOD ORDINANCE AND |
| FBC-R322.1. |
| -A PRE-CONSTRUCTION ELEVATION THAT IS BASED ON THE |
| PROPOSED CONSTRUCTION WHICH IS REQUIRED TO COMPLY WITH |
| THE CITY'S FLOOD ORDINANCE IS REQUIRED TO BE SUBMITTED. |
| |
| 2) THE STRUCTURE IS LOCATED WITHIN 600 FEET OF THE |
| INTER-COASTAL WATER WAY AND THEREFORE IT IS IN EXPOSURE |
| CATEGORY D. PLEASE REVISE THE PLANS AND THE COMPONENT & |
| CLADDING PRESSURES. FBC R301.2.1.4.3 |
| -THE EXPOSURE CATEGORY WAS CHANGED TO "D" ON THE PLANS, |
| HOWEVER, THE COMPONENT AND CLADDING PRESSURES FOR THE |
| WINDOWS AND EXTERIOR DOORS WERE NOT INCREASED |
| ACCORDINGLY. FBC-R301.2.1 NOTE: YOU WILL NEED TO REVIEW |
| THE MAXIMUM DESIGN PRESSURES LISTED IN THE PRODUCT |
| APPROVALS FOR THE WINDOWS, DOORS AND OTHER COMPONENTS |
| AND CLADDING PRODUCTS TO MAKE SURE THEY ARE ADEQUATE. |
| |
| 3) THE ENERGY CALCULATIONS LIST A 50 GALLON WATER |
| HEATER AND A 120 GALLON WATER HEATER IS SPECIFIED ON |
| THE PLANS. PLEASE CORRECT. FBC 107.2.1 |
| -SEE PLAN SHEETS A1.0 AND M1.0 |
| |
| 4) R401.4 SOIL TESTS. WHERE QUANTIFIABLE DATA CREATED |
| BY ACCEPTED SOIL SCIENCE METHODOLOGIES INDICATE |
| EXPANSIVE, COMPRESSIBLE, SHIFTING OR OTHER QUESTIONABLE |
| SOIL CHARACTERISTICS ARE LIKELY TO BE PRESENT, THE |
| BUILDING OFFICIAL SHALL DETERMINE WHETHER TO REQUIRE A |
| SOIL TEST TO DETERMINE THE SOIL'S CHARACTERISTICS AT A |
| PARTICULAR LOCATION. THIS TEST SHALL BE DONE BY AN |
| APPROVED AGENCY USING AN APPROVED METHOD. STRUCTURE IS |
| LOCATED IN AN AREA OF QUESTIONABLE SOIL. SUBMIT A |
| SIGNED AND SEALED SUBSURFACE SOIL REPORT. |
| -THE ADDRESS ON THE SOIL REPORT HAS 8011 ARLINGTON ROAD |
| AND THE PROJECT IS LOCATED AT 8011 ARLINGTON PLACE. |
| -THE SOIL REPORT THAT WAS SUBMITTED IS INCOMPLETE. |
| FBC 1803.6 REPORTING. |
| WHERE GEOTECHNICAL INVESTIGATIONS ARE REQUIRED, A |
| WRITTEN REPORT OF THE INVESTIGATIONS SHALL BE SUBMITTED |
| TO THE BUILDING OFFICIAL BY THE OWNER OR AUTHORIZED |
| AGENT AT THE TIME OF PERMIT APPLICATION. THIS |
| GEOTECHNICAL REPORT SHALL INCLUDE, BUT NEED NOT BE |
| LIMITED TO, THE FOLLOWING INFORMATION: |
| 1. A PLOT SHOWING THE LOCATION OF THE SOIL |
| INVESTIGATIONS. |
| 2. A COMPLETE RECORD OF THE SOIL BORING AND PENETRATION |
| TEST LOGS AND SOIL SAMPLES. |
| 3. A RECORD OF THE SOIL PROFILE. |
| 4. ELEVATION OF THE WATER TABLE, IF ENCOUNTERED. |
| 5. RECOMMENDATIONS FOR FOUNDATION TYPE AND DESIGN |
| CRITERIA, INCLUDING BUT NOT LIMITED TO: BEARING |
| CAPACITY OF NATURAL OR COMPACTED SOIL; PROVISIONS TO |
| MITIGATE THE EFFECTS OF EXPANSIVE SOILS; MITIGATION OF |
| THE EFFECTS OF LIQUEFACTION, DIFFERENTIAL SETTLEMENT |
| AND VARYING SOIL STRENGTH; AND THE EFFECTS OF ADJACENT |
| LOADS. |
| 6. EXPECTED TOTAL AND DIFFERENTIAL SETTLEMENT. |
| 7. DEEP FOUNDATION INFORMATION IN ACCORDANCE WITH |
| SECTION 1803.5.5. |
| 8. SPECIAL DESIGN AND CONSTRUCTION PROVISIONS FOR |
| FOUNDATIONS OF STRUCTURES FOUNDED ON EXPANSIVE SOILS, |
| AS NECESSARY. |
| 9. COMPACTED FILL MATERIAL PROPERTIES AND TESTING IN |
| ACCORDANCE WITH SECTION 1803.5.8. |
| 10. CONTROLLED LOW-STRENGTH MATERIAL PROPERTIES AND |
| TESTING IN ACCORDANCE WITH SECTION 1803.5.9. |
| |
| 5) THE DOOR SCHEDULE SPECIFIES A FIBERGLASS DOOR, AN |
| ARCHED TOP WOOD DOOR AND DOUBLE METAL FRENCH DOORS WITH |
| GLAZING. THERE WERE NOT ANY PRODUCT APPROVALS SUBMITTED |
| FOR THESE ITEMS AS REQUIRED BY DCA RULE 9N-3 AND FBC |
| 107.3.4.1 |
| |
| 6) THE PRODUCT APPROVAL THAT WAS SUBMITTED FOR THE |
| STRUCTURAL MULLIONS IS LIMITED TO A MULLION LENGTH OF |
| 72". THIS IS TOO SHORT FOR THE TWO 36" X 96" FIXED |
| WINDOWS (E). SUBMIT PRODUCT APPROVALS FOR THE MULLIONS |
| THAT WILL BE USED ON THESE WINDOWS. DCA RULE 9N-3 AND |
| FBC 107.3.4.1 |
| |
| IN ORDER TO REDUCE PLAN REVIEW TIMES AND PROVIDE |
| CLARIFICATION, PLEASE SUBMIT A RESPONSE LETTER |
| INDICATING HOW EACH OF THE REVIEW COMMENTS HAS BEEN |
| ADDRESSED. |
| |
| |