2014-10-03 17:18:34 | ENERGY CALCULATIONS SUBMITTED WERE NOT REQUESTED OR |
| REQUIRED FOR THIS JOB. IT MAY BE A SUBMITTAL TO ADDRESS |
| MECHANICAL REVIEW PROVISO. NEVERTHELESS, IT WAS NOT |
| WHAT IT WAS REQUESTED ON ROBERT MCDOUGAL'S PROVISO. |
| SENT TO ROBERT'S DESK FOR REVIEW. JG. |
| |
| *** REMAINDER TO CONTRACTOR: |
| THERE WAS A BUILDING PROVISO DATED 8/7/14. INFORMATION |
| REQUESTED IN THIS PROVISO NEED TO BE ADDRESSED. SEE |
| COPY OF PROVISO BELOW: |
| |
| |
| BUILDING REVIEW APPROVED WITH PROVISO: |
| 1- PROVIDE PRODUCT APPROVAL (2 COPIES) AS REQUIRED BY |
| DCA RULE 9N-3 FOR: |
| A) ROOF COVER. GENERAL NOTES ON COVER SHEET INDICATES |
| NEW ROOF AS PART OF THE SCOPE OF WORK. |
| B) ALL USP AND SIMPSON STRUCTURAL CONNECTORS SPECIFIED |
| ON PLANS, DETAILS AND SPECIFICATIONS. |
| C) WINDOW MULLIONS. NOA 11-0922.01 SUBMITTED WAS |
| SUPERSEDED BY MIAMI-DADE. NEED CURRENT NOA. |
| D) ROUND CASEMENT WINDOW AS SHOWN ON PLANS. |
| E) NEW ALUMINUM CASEMENT NOA 12-0216.04 WAS SUBMITTED. |
| NEED TO PROVIDE TWO COPIES. |
| F) NEW FRENCH DOORS FLORIDA PRODUCT APPROVAL FL14504 |
| WAS SUBMITTED. NEED TO PROVIDE TWO COPIES. |
| 2- ARCHITECT TO REVIEW AND APPROVE ABOVE PRODUCT |
| APPROVALS. SEC. 107.3.4.1 OF CITY AMENDMENTS. |
| 3- SHEET A-2: PROVIDE COMPLETE DETAILS AND |
| SPECIFICATIONS FOR INTERIOR HANDRAIL TO BE REPLACED. |
| TABLE R301.5 AND SEC. R311.7.7. |
| 4- SHEET A-4: PROVIDE COMPLETE DETAILS AND |
| SPECIFICATIONS FOR NEW MASTER BATHROOM BALCONY. TABLE |
| R301.5 AND SEC. R312. |
| 5- PROVIDE COMPLETE FRAMING DETAILS AND SPECIFICATIONS |
| FOR NEW ARCHED OPENINGS IN THE REBUILT DEN AREA ON |
| FIRST FLOOR. SEC. R301. |
| 6- SHEET A-9: REVISE ALL THE DOOR STRUCTURAL BUCK |
| DETAILS. BUCK NEED TO PROVIDE FULL SUPPORT TO THE DOOR |
| FRAME. SEC. R612.10.2.1. |
| |
| JULIO GOMEZ |
| COMMERCIAL COMBINATION PLANS EXAMINER |