Plan Review Notes For Permit 14090746 |
Permit Number |
14090746 |
|
Review Stop |
E |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2014-09-23 09:17:54 | B12 | | | | | 2014-09-23 09:17:23 | DATE: 9/23/2014 | | PROJECT: DXL | | PERMIT#: 14070136 | | CODE: 2008 EDITION OF THE NEC | | 2010 EDITION OF THE FBC | | 2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, | | ADMINISTRATION, 2012 FBC SUPPLEMENTS. | | | | 1ST ELECTRICAL REVISION PLAN REVIEW | | ACTION: PROVISO | | | | 1) RISER ON REVISION INDICATES A 150AMP MAIN BREAKER IN | | PANEL B ON THE SECONDARY SIDE OF THE NEW 75KVA | | TRANSFORMER. THE PANEL SCHEDULE INDICATE S A 225AMP MLO | | PANEL IN PANEL B. REVISE PLANS FOR CLARIFICATION. | | | | 2) NEC 210.4(B) EACH MULTIWIRE BRANCH CIRCUIT SHALL BE | | PROVIDED WITH A MEANS THAT WILL SIMULTANEOUSLY | | DISCONNECT ALL UNGROUNDED CONDUCTORS AT THE POINT WHERE | | THE BRANCH CIRCUIT ORIGINATES. | | | | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, | | 561-805-6717 OR [email protected] | | |
|