Plan Review Notes For Permit 14081026 |
Permit Number |
14081026 |
|
Review Stop |
P |
Sequence Number |
3 |
|
Notes |
Date |
Text |
2015-01-08 09:23:16 | !) THE STANCOR DUPLEX OIL-MINDER SPECIFICATION SHEETS | | CALL OUT DUPLEX PUMPS AND A 55 GAL OIL STORAGE | | CONTAINER BUT THE PLANS ONLY SHOW THE DISCHARGE OF ONE | | PUMP. CLARIFY. | | 2) SHOW THE LOCATION OF THE OIL STORAGE CONTAINER AND | | THE CONTROL PANEL ON THE PLANS. WPB AMEND. TO 2010 FBC | | SEC.107.2.1. 2ND REQUEST. THE SHOP DRAWING MENTIONED | | AND SUBMITTED DOES NOT IDENTIFY THE TANKS, | | LOCATION,ETC. | | 3) IF THIS IS A TWO PUMP SYSTEM, SUBMIT A PIPING | | DIAGRAM SHOWING THE PIPING, OIL CONTAINER,& DISCHARGE | | POINT. | | WPB AMEND. TO 2010 FBC SEC.107.2.1. | | 4) SUBMIT DOCUMENTATION THAT SHOWS THAT THESE | | COMPONENTS ARE CERTIFIED BY A NATIONALLY RECOGNIZED | | INDEPENDENT TESTING LABORATORY AS STATED IN THE STANCOR | | SPECIFICATIONS. WPB AMEND. TO 2010 FBC SEC.107.2.1. | | 5) A CHECK VALVE SHALL BE INSTALLED ON THE PUMP SIDE OF | | THE SHUTOFF VALVE PER THE 2010 FPC SEC.712.2. | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | | | |
|