2014-11-03 12:17:211) SHOW THE LOCATION OF THE HOLDING TANK AND CONTROL
 PANEL FOR THIS SYSTEM. WPB AMEND. TO FBC SEC. 107.2.1.
 2) SUBMIT DOCUMENTATION THAT SHOWS THAT THIS UNIT IS
 CERTIFIED BY A NATIONALLY RECOGNIZED INDEPENDENT
 TESTING LABORATORY AS STATED IN THE LITERATURE THAT WAS
 SUBMITTED. WPB AMEND. TO FBC SEC. 107.2.1.
 3) SHT. P-2 - THE PARTIAL PLUMBING RISER READS " SUMP
 PUMP - SEE DETAIL SHT. P-2 - THERE IS NO SUCH DETAIL ON
 SHT. P-2. CLARIFY.
 4) 712.2 VALVES REQUIRED.
 A CHECK VALVE AND A FULL OPEN VALVE LOCATED ON THE
 DISCHARGE SIDE OF THE CHECK VALVE SHALL BE INSTALLED IN
 THE PUMP OR EJECTOR DISCHARGE PIPING BETWEEN THE PUMP
 OR EJECTOR AND THE GRAVITY DRAINAGE SYSTEM. ACCESS
 SHALL BE PROVIDED TO SUCH VALVES. SUCH VALVES SHALL BE
 LOCATED ABOVE THE SUMP COVER REQUIRED BY SECTION 712.1
 OR, WHERE THE DISCHARGE PIPE FROM THE EJECTOR IS BELOW
 GRADE, THE VALVES SHALL BE ACCESSIBLY LOCATED OUTSIDE
 THE SUMP BELOW GRADE IN AN ACCESS PIT WITH A REMOVABLE
 ACCESS COVER.
 THE SUMP PIT SHALL BE FITTED WITH A GAS-TIGHT REMOVABLE
 COVER ADEQUATE TO SUPPORT ANTICIPATED LOADS IN THE AREA
 OF USE. THE SUMP PIT SHALL BE VENTED IN ACCORDANCE WITH
 CHAPTER 9.
 5) SUBMIT MANUF. SPECS FOR THE PUMPS. PUMPS SHALL MEET
 THE CRITERIA OF 2010 FPC TABLE 712.4.2.
  
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved